ML13304B578

From kanterella
Jump to navigation Jump to search
Forwards 1979 Annual Operating Rept,San Onofre Nuclear Generating Station, Vol 5,Biological & Oceanographic Data Analyses.Includes ETS for Unit 1,const & Preoperational Monitoring Programs for Units 2 & 3
ML13304B578
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/25/1980
From: Baskin K
Southern California Edison Co
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML13304B579 List:
References
NUDOCS 8007010216
Download: ML13304B578 (2)


Text

REGULATOR4NFORMATION DISTRIBUTION SYSEM (RIDS)

ACC'ESSION NBR:8007010216 0OC.DATE: 80/06/25 NOTARIZED: NO DOCKET FACIL:5-0J4

, San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-361 3an Onofre Nuclear Station, Unit 2, Southern Californ 05000361 5-0-62 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTHNAME AUTHOR AFFILIATION BASKIN,K.P.

Southern California Edison Co.

RECIP.NAME RECIPIENT AFFILIATION EISENHUT,D.G, Division of Licensing

SUBJECT:

Forwards "1979 Annual Oerating ReptSan Onofre Nuclear Generating Station," Vol SBiological & Oceanographic Data Analyses.Includes ETS for Unit 1,const & oreoperational monitoring programs for Units 2 & 3.

DISTRIBUTION CODE: A007S COPIES RECEIVED:LTR _ ENCL -e SIZE: 1*8J0 TITLE: Periodic Environmental Monitoring Rots (AnnualSemi-Annu NOTES: /,;A d

L..

NFID !

FLL FS F A 4/7FA 7b RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION:

BCCRLM#tCtFLD0S 7

7 ScI1W E; CEf.

INTERNAL: ENV ENG BR 15 1

1 I&E 12 2

2 MOOREV.

1 1

NRC POR 02 1

1 QR- -ASSE.SS BR 14 1

1 RAD ASSESS BR16 1

1 FIL 01 1

1 EXTERNAL: ACRS 19 1

1 LPOR 03 1

1 NSIC 04 1

1

~

~

ec~

r-o PY~i J1 to 21r;,tG TOA N

TOTAL NUMIBER OF COPIES REOUIRED: LTTR

-f E14CL 41

Southern California Edison Company P. 0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN June 25, 1980 TELEPHONE MANAGER, NUCLEAR ENGINEERING (213) 572.1401 AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:

Darrell G. Eisenhut, Director Division of Project Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

San Onofre Nuclear Generating Station Units 2&3 Docket Nos. 50-361 and 50-362 In accordance with the July 6, 1978 approval of the Preoperational Monitoring Program (PMP) for San Onofre Units 2&3, the results of the PMP have been incorporated into the 1979,Annual Operating Report for Unit 1. Volume V of the 1979 Annual Operating Report for San Onofre Nuclear Generating Station presents the Biological and Oceangraphic Data Analyses. Copies of Volume V are being sent to both the Office of Inspection and Enforcement, Region V, and the Division of Project Management as required by the Unit 1 Environmental Technical Specifications (ETS) and the approval for the Preoperational Monitoring Program for Units 2&3.

In 1978, the PMP was initiated in compliance with requirements of the Nuclear Regulatory Commission. The PMP along with other environmental monitoring programs will provide a baseline of oceangraphic and marine biological data prior to the operation of Units 2&3. The Preoperational Monitoring Program is complementary to the Unit 1 ETS program and essentially expands the study area further offshore into the area of Units 2&3 diffusers.

The PMP was started in June 1978 and terminated in June 1980, with 24 months of oceanographic and biological studies. A total of 18 months of preoperational data are reported in this volume.

Enclosed are six copies of Volume V of the 1979 Annual Operating Report for San Onofre Nuclear Generating Station. If there are any questions, please contact me.

Sincerely, Enclosures Ato fo7n0/