ML13304A778
| ML13304A778 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/28/1981 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML13304A779 | List: |
| References | |
| NUDOCS 8108070030 | |
| Download: ML13304A778 (3) | |
Text
JUL 2 8 198 Rosemead Chamber of Commerce P. 0. Box 335 8780 East Valley Boulevard Rosemead, California 91770 Gentlemen:
The resolution of the Rosemead Chamber of Commerce, supporting the licensing of the San Onofre 2 and 3 nuclear power plants has been referred to me for reply. I am pleased to provide the following information regarding nuclear power plant licensing in general, and licensing of San Onofre 2 and 3 in particular.
Currently, the overall picture is one of a licensing process that is returning to predictability at a considerably enhanced level of safety. However, the implementation of this enhanced level of safety has raised a number of potential new issues in the contested hearings for both operating licenses and construction permits around the country. Some of these units were substantially complete at the time of the Three Mile Island accident or have been completed since then.
However, we are confident the actions we have taken since TMI 2 and those we will take will provide major improvements in licensing schedules without compromising the regulatory requirements for safety.
With regard to licensing of San Onofre Units 2 and 3, the staff has completed the major part of its review. Staff safety evaluations were issued on December 31, 1980, February 6, 1981, February 25, 1981, and May 8, 1981. The review of the San Onofre Units 2 and 3 by the Advisory Committee on Reactor Safeguards was completed on March 12, 1981.
The Final Environmental Statement was issued by the NRC staff in April, 1981.
The hearing on this project commenced on June 22, 1981.
We appreciate your interest in the San Onofre project. Please be assured that the NRC is taking every reasonable action to expedite the licensing process, consistent with our commitment to ensure the public health and safety.
Sincerely
-iginal signedby\\
Darrell G.Eisenhu1.
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation 9108070030 610726 PDR ADOCK 05000361 H
PDR' DISTRIBUTIO SEE NEXT PAGE.
OFFICE D
DL LB #3 DL:
L L
SURNAMEO HRood:jb FJMira glia RLTe sco DATE) 7/ $81 7/ /81l 7__8_81 NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1980-329-824
THE D'H SATE B2 IATELY If the due date coes not allow ade uate time to respond to this ticket, you r:y request revised due dates.- The request must include valid justification and be submitted through your correspondence coordinator to the R
room Suc IE room.
Such requests for green tickets
,st be made within 3 days after assignment.
Re4usts for revision of yellow ticket due atesmay be made, w-ith Ljustification, throuCh the. weekly IJTS update.
The revised due date, if approved by PPAS, illbe used to track division corresondr:
-mlton schedules.
FROM DATE OF DOCUMENT DATE RECEIVED NO:
Rosemeade Chamber of Commerce undated 7/20/81 NWM-81-422 LTR.
MEMO:
REPORT:
OTHER:
TO ORIG.:
CC:
OTHER:
H. Denton ACTION NECESSARY CONCURRENCE DATE ANSWERED.
NO ACTION NECESSARY O]
COMMENT El B
CASSIF.:
POST OFFICE FILE CODE:
REG. NO:
i)ESCRIPTION: (Must Be Unclassified)
REFERRED TO DATE RECEIVED BY DATE submits resolution supporting the re-Case licensing of San Onofre Units Denton II and III I
RPA_
ENCLOSURES:
3-Hanauer
- 4.
Mattson
- 6. Vollmer
- 7.
Snydor for approp. action REMARKS U. S. NUCLEAR REGULATORY COMMISSION FORM NRC-326 MAIL CONTROL FORM.
(I 75