ML13303A750

From kanterella
Jump to navigation Jump to search
Submits Questions Re QA Program Controls Utilized During Design & Const Phase of Sea Wall for Transmittal to Licensee
ML13303A750
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/30/1979
From: Rood H
Office of Nuclear Reactor Regulation
To: Haass W
Office of Nuclear Reactor Regulation
References
NUDOCS 7912120194
Download: ML13303A750 (1)


Text

DISTRIBUTION Docket File QAB Projects OCT 3 0 1979 QAB Chron. File NRR Reading File DJSkovholt, DPM JGilray, QAB WHaass, QAB Docket Nos. 50-361l-'

50-362 MEMORANDUM FOR:

Harry Rood, Project Manager, Light Water Reactors Branch No. 2,.Division of Project Management FROM:

Walter P. Haass, Chief, Quality Assurance Branch, Division of Project Management

SUBJECT:

QA PROGRAM CONTROLS -

SEA WALL FOR SAN ONObRE NUCLEAR GENERATING STATION, UNIT.NOS. 2 AND 3 Pursuant to our Oct6ber 23, 1979.meeting with you, J. Hulman, and others concerning the structural adequacy of the sea wall for San Onofre 2 and 3, it is requested that Southern California Edison address the following question pertaining to the QA program controls that the licensee utilized during the design and construction phase and those controls to be used during the operations phase, including main tenance and modifications:

Relative to the design and construction of the sea wall for San Onofre 2 and 3, Southern California Edison (SCE) is requested to describe the.

QA program controls that were applied to these activities, and the QA program controls that will apply to any potential work in the future (e.g., maintenance/m*pifications) during the operations phase. The response should address the extent to which the QA program controls meet each of the applicable criteria of Appendix B to 10 CFR 50 and the Regulatory Guides, ANSI standards, and criteria identified in Section 17.1 of the Standard Review Plan (NUREG-75/087), "Quality Assurance During the Design and Construction Phases."

Original signed by Walter P. H3ass Walter P.. Haass, Chief Quality Assurance Branch, Division of Project Management

~~ch

~7912120 O FFICE O SURNAME ry

.eass.

DATE...

O /

.9 NRC FORM 318 (9-76) NRCM 0240

  • U.S. GOVERNMENT PRINTING OFFICE: 1979-289-369