.MAY 29 in,~
DOCKET NOS. i Y'
AND 50-362 APPLICANTS:
SOUTHERN CALIFORNIA EDISON COMPANY SAN 'DIEGO GAS AND ELECTRIC COMPANY FACILITY:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS STAFF FIRE PROTECTION CRITERIA On April 27,l 979,.members -of the NRC staff met with the applicants in Bethesda, Maryland to discuss the above subject. Atten-dees at the meeting are given in. 'The objective of the meeting was to share with the applicants the staff fire protection criteria for plants located in seismica:lly active regions.
The staff stated that for such plants, firefighting means must be'available, following, the SSE, to fight fires in any area containing systems necessary.for safe shutdown., Fire hoses and hand-operated equipment is an acceptable fire fighting means.
The staff stated that following the SSE, the facility must have available:
- 1. A source.of water capabT of 150 GPM for two hours. This should be a seismi.c tank or a seismic water system cap'Able of being connected to hose standoipes in areas containing systems necessary for safe shutdown.
- 2. A means of delivering the water, such as pumps.
- 3. Fire detection eq:jipment:
- a. permanently installed equipment in Category I buildings
- b. some backup means to this,- such as inspection of the area following the SSE,.
The staff stated that it is
-not mandatory that all automatic fire-suppression' systems remain functional after the SSE.
OFFICE_
UURN ME*.........................
SURNAM 18 (9*.....6)
P.
NWC FORM 318 (9-76) NRCK 0240 u.s.
GOVERNMON.T PRINTING OPPICE:AtS70 *265 769
2 The staff presented additional material,to further clarify its requirements, including fi're protection questions recently asked by the staff on the Sequoyah docket, staff requirements for alternate shutdown methods, the most recent ver sion of the standard technical specificatitos for fire protection, and draft first round fire protection questions for San Onofre 2 and 3 (see Enclosure 2).
At the conclusion of the meeting its was tentatively agreed that a fire protec tion site.visit by the staff Would be conducted in June 1979.
Harry Rood Light Water Reactors Branch No. 2 Division of Project Management
Enclosures:
1.- Attendance List
- 2. Additional Material Presented By The Staff ccs w/enclosures:
See next pages
....DPM.L R..
WR #2 SURNAM O
...HRQQd:.a. 1 I RLae.
....5./..7.9............. t.
PIC ORM 318 (9-76) NRCM 0240 u.o. GOVRNMNT PRINTING r.c.
1978 - 265 769
Mr. James H. Drake MAY 29 7 Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Mr. B. W. Gilman Senior Vice President - Operations San Diego Gas and [lectric Company 101 Ash Street P. 0. Box 1831 San Diego, California 92112 cc:
Charles R. Kocher, Esq.
James A. Beoletto, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Chickering and Gregory ATTN: David R. Pigott, Esq.
Counsel for San Diego Gas
& Electric Company and Southern California Edison Company Three Embarcadero Center, 23rd Floor San Francisco, California 94112 Mr.
Kenneth E. Carr City Manager City of San Clemente 100 Avenido Presidio San Clemente, California 92672 Alan R. Watts, Esq.
Rourke & Woodruff 1055 North Main Street Suite 1020 Santa Ana, California 92701 Lawrence Q. Garcia, Esq.
California Public Utilities Commission 5066 State Building San Francisco, California 94102
Mr. James H. Drake Mr. B. W. Gilman cc:
Mr. R. W. DeVane, Jr.
Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095 Mr. P. Dragolovich Bechtel Power Corporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Mr. Mark Medford Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91710 Henry Peters San Diego Gas & Electric Company Post Office Box 1831 San Diego, California 92112 Ms.
Lyn Harris Hicks Advocate for GUARD 3908 Calle Ariana San Clemente, California 92672 Richard J. Wharton, Esq.
4655 Cass Street, Suite 304 San Diego, California 92109 Phyllis M. Gallagher, Esq.
Suite 220 615 Civic Center Drive West Santa Ana, California 92701 Mr. Robert J. Pate United States Nuclear Regulatory Commission P. 0. Box 4167 San Clemente, California 92672 IT
MAY 2 9 99 ENCLOSURE 1 ATTENDANCE LIST FIRE PROTECTION CRITERIA MEETING SAN ON0FRE 2 & 3 SOUTHERN CALIFORNIA EDISON COMPANY B. Katz M. Medford C. G. Moore R. L. Phelps J. Todd BECHTEL POWER CORPORATION R. Boas E. Hatzler E. Richardson K. Walvekar NRC -
STAFF V. Benaroya C. Liang P. Matthews H. Rood GAGE-BABCOCK AND ASSOCIATES (NRC CONSULTANT)
R. Barnes SAN DIEGO GAS AND ELECTRIC COMPANY H. Peters
Meeting Summar Docket File J. Knight NRC PDR S. Hanauer Local PDR R. Tedesco TIC R. Bosnak NRR Reading S. Pawlicki LWR #2 File F. Schauer E. Case K. Kniel D. Bunch T. Novak R. S. Boyd Z. Rosztoczy D. F. Ross W. Butler D. B. Vassallo V. Benaroya
- 0. Skovholt R. Satterfield W. Gammill V. Moore J. Stolz M. Ernst R. Baer F. Rosa
- 0. Parr R. Denise S. Varga EP Branch Chief C. Heltemes G. Chipman W. Haass J. Collins R. Houston W. Kreger L. Crocker G. Lear D. Crutchfield B. Youngblood F. J. Williams L. Hulman R. J. Mattson NRC
Participants:
R. DeYoung C. Liang Project Manager - H. Rood P. Matthews Attorney, ELD J. Lee IE(3)
ACRS(16)
R. Denise L. Rubenstein