Summary of 781201 Meeting W/Applicant Re Status of Dewatering Well Cavities
ML13303A648
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/19/1978
From: Greeves J
Office of Nuclear Reactor Regulation
To: Heller L, Stepp J
Office of Nuclear Reactor Regulation
References
NUDOCS 7812280281
Download: ML13303A648 (3)


Text

DEC 1 9 1 978 MEMORANDUM FOR:

J. Carl Stepp, Chief Geosciences Branch, DSE THRU:-

L. W. Heller, Leader Geotechnical Engineering Section, Geosciences -Branch, DSE FROM:

John T. Greeves,2Geotechnical Engineer Geotechnical Engineering Section Geosciences Brahch,,DSE

SUBJECT:

SUMKARY OF MEETING TO DISCUSS DEWATERING WELL CAVITIES -

SAN ON CLEAR STATION, DOCKET NOS. 0-62 On Friday December 1, 1978, I met with representatives of Southern California Edison (SCE), their consultant Woodward-Clyde and Bechtel Power Corporation to discuss the status of the dewatering well cavities.- The meeting was held in Bechtel's San Francisco office and a list of attendees is enclosed.

In'summary, Wells-i, 2, 3A, and 9 have been filled with concrete and no evidence of cavities was encountered. Demobilization work at Well 8 is complete and has been described inthe August, 1978 report on Well 8. Recent investigative work on Welis3, 4,,5, 6 and 7 was-reviewed during the meeting.

Most of the discussion centered around the cross hole seismic survey procedure for cavity detection. This technique has been used at Well 3 and the data from the cross hole seismic survey has been used to evaluate this procedure for cavity detection. The analysis of the data indicates that the wave form and the arrival of the P-wave can be used to detect cavities.

In addition -to Well 3, Wells 4, 5 and 10 will be investigated with this technique.

7812 280'A91 OFIE 1

S U N M 9 0.

NKC FORM '318 (9-76) NRCM 0240

  • U.S.

GOVERNMEINT PRINTING OFFICH; 1978,"265" 709

J. Carl Stepp 2

DEC 191978 Preliminary profiles and contour maps of the Well 6 investigation were presented and discussed. Documentation of the exploration grouting program at Well 6 is in preparation and will be submitted in January. Buried-utility ducts near Well 7 have caused problems with drilling exploration holes. A-shallow excavation was made to expose the utilities and avoid this problem. The exploration grouting program for Well 7 should be completed by the end of December.

DISTRIBUTION DOCKET FILE -(50-361[362)'

John T. Greeves, Geotechnical Engineer NRR'RDG-Geotechnical Engineering Section GB RDG Geosciences Branch Division of Site Safety and Environmental Analysis

Enclosure:

As stated cc: w/enclosure R. Denise D. Vassallo

1. Kniel L. Hulman W. Bivins L. Heller H. Rood R. Jackson.

A. Cardone L. Knupple, C/E PDR Local PDR ACRS (18)

J. Knight OFPICE0 DSE:

DS T

E.

9 8 ---

NBC ORM 3

9)N 04.S.G 31 I.........I..

N=

FRM 18

(-76 NRC 04 U.S.

G-OVERNMENT PRINTING OFFICE: 1978 -265

-759

Meeting December 1, 1978 SONGS 2 & 3 Dewatering Well Investigation Attendees Organization D. B. Schone SCE J. K. Yann SCE L. G. Hersh BPC J. A. Barneich WCC R. D. Hinkle SCE H. S. Smith SCE J. Gallerani BPC R. L. Blodnikar BPC A. B. Arnold BPC W. Ferris BPC J. T. Greeves NRC