EC 81980 Docket Nos.:
50-361/362 MEMORANDUM FOR: D. Eisenhut, Director, Division of Licensing, NRR THRU:
R. Tedesco, Assistant Director for Licensing, DL F. Miraglia, Acting Chief, Licensing Branch #3, DL FROM:
H. Rood, Project Manager, Licensing-Branch #3, DL
SUBJECT:
STATUS REPORT FOR STAFF REVIEW OF SAN ONOFRE (SONGS)
UNITS 2 AND 3 SAFETY REVIEW A full-power SER is scheduled to be issued in February, 1981.
The only review branch that has not yet provided any SER input to DOL is GSB.
A favorable USGS letter was sent.to GSB November 26, 1980, and final GSB input isscheduled to-be provided to DOL on December 8, 1980.'
Updated SER input from many review branches was scheduled to be submitted to DOL by November 1, 1980. This input is necessary to close out non-TRI open items., As of December 1, 1980; the following branches had a number of open items (work on updated SER.input is in progress but not yet complete):
.Reactor.Systems Branch Auxiliary Systems Branch Materials -Engineering Branch Core Performance Branch Containment Systems Branch Emergency Preparedness Licensing-Branch Difficulty in completing San Onofre input is due in part to competing priorities
-for reviewers and their management. For example,-the CSB reviewer is also working on the TMI-1 restart hearing, and the RSB and CPB section leaders are unable to review their. section's input on an expedited schedule due to other priority projects.. Also, the applicant's.reply to some concerns has been incomplete, necessitating additional.questions.
Based on the SER input on hand today, there are about 50 non-TMI-related open items. We-expect the input for the above branches, and a.few others having one or two open items, to close about 20 open items. During the.
next two weeks,-additional-submittals and meetings with the applicant; are expected to close about 10 or 15 more open items. Thus a total of 15 to 20 non-TMI items are anticipated to remain open. We have arranged for CRESS to contract out the SER typing over Christmas week an rovide R with a
draft fo mananmnt review on or about 1/1/80.
DEC 8 1980
- 0. Eisenhut
- 2 With regard to the TMI-related issues, the applicant submitted a document addressing the NUREG-0694 items on September 12, 1980. DOL requested input from the reviewers by November 1, 1980. To date, only three branches have provided TMI-related SER input. Several review branches found it necessary to request additional information about the applicant's TMI submittal. A letter transmitting these questions as well as some non-TMI-related questions (a total of over 125 questions) was sent to the applicant on November 7, 1980.
In addition, the applicant's TMI submittal was not complete when issued, and the publication of NUREG-0737 has opened additional items not yet addressed by the applicant.
The applicant has recently provided information addressing NRC questions and open items in Amendment 21 to the FSAR, dated November 14, 1980. He has also submitted a number of letters enclosing information needed for our review.
These are:
Date Subject 10/06/80 I51PSI 10/29/80 HFEB control room data 10/31/80 AFW data 11/06/80 4 Emergency operating procedures 11/18/80 Fuel audit data -
CEN-140 11/18/80 Fuel handling building calculations 11/20/80 Appendix A Tech. Specs.
11/24/80 AF reliability studies 11/25/80 Secondary Water Chemistry information 11/26/80 Partial response to 11/07/80 questions Another letter submittal addressing the 11/07/80 questions is scheduled for 12/08/80, and a series of meetings between the applicant and 14 review branches has been scheduled for the week of December 15, 1980. These meetings will cover both FI-related and non-TMI-related open items. As mentioned above, we plan to collect as much SER input as possible through the week of 12/15/80, and have a typed draft available for management review on or about 12/31/80.
It is estimated that the TMI-related section of this draft SER will resolve about 50% of the NUREG-C737Sitems. We hope to incorporate additional TMI items in early January, and issue the SER by February 1, 1980.
D. Eisenhut
-3 DEC 8 1980 We recommend that this document be published in early February 1981, even though the TMI-related section will be incomplete and a number (probably 15 to 20) of non-TMI open items will remain. The basis for this recommenda tion is to be able to bring the seismic issue before the ACRS subcommittee in mid-February, and before the full ACRS in March. Since this issue is crucial to the hearing, early resolution may allow the hearing to start sooner.
The applicant has recently requested that we try to issue the SER in early January, but we believe that this would result in a document with 35-40 open items and only a few TMI issues addressed.
EFFECTS OF EARTHQUAKE ON EMERGENCY PLAN AT EPPO's request, we have prepared a letter requesting that the applicant consider the effects of an earthquake on the ability to evacuate the plant site and the EPZ areas around the plant.
This matter was discussed in a memo from R. Tedesco to you dated December 3, 1980. In that memo it was suggested that a meeting between DOL management and B. Grimes be arranged prior to dispatch of the letter.
ENVIRONMENTAL REVIEW The DES for SONGS was published in November 1978.
The FES which has been delayed due to tha TMI accident, now awaits the revised accident write-up (FES Section 7).
The accident evaluation for the SONGS Environmental Statement is scheduled to be completed by AEB on December 17, 1980. Based on the December 17 date, the tentative schedule for issuing the accident evaluation for comment and publication of the FES is as follows:
DOL receives SONGS accident evaluation 12/17/80 Draft Supplement to printers 12/29/80 Draft Supplement to EPA 01/02/81 Notice in F.R., start of comment period 01/09/81 End comment period 02/23/81 Publish complete FES, including revised 03/31/81 The applicant has verbally requested that we issue a partial FES, without Section 7, as soon as possible, and follow this with a supplemental DES and FES containing chapter 7. The applicant believes that this "Bifurcated" FES would speed the discovery process and, therefore, the hearing. In our view, the benefits of this approach are outweighed by the disadvantages, because the partial FES could not be issued until AW6* weeks prior to the complete FES, due to various revisions that are necessary to the sections of the FES other than Section 7. Issuance of a "Bifurcated" FES would involve expenditure of additional staff resources, and the advantages would
- See attached
DEC 8 1980 D. Eisenhut 4
be minimal, since a joint safety-environmental hearing is planned, and the final SER supplement is scheduled for issuance after the combined FES.
Harry Rood, Project Manager Licensing Branch #3 Division of Licensing cc: H. Denton DISTIRBUTION:
E. Case Docket File R. Tedesco LPDR F. Miraglia PDR H. Rood LB#3 R/F D. Scaletti HRood S. Hanauer Pg uq D. Ross Riedesco T. Nurley bcc:
NSIC R. Vollmer TIC P. Check ACRS (16)
M. Ernst IE (3)
D. Muller V. Noonan J. Knight
- 14.
Kreger L. Rubenstein B. Grimes G. McCorkle DL:LB DL:L AD/L O FFICE su m an 9
a..
esco DATE 1.2/. /80.......12./
./80...
2/./.8.
NRC FORM 318 (9-76) NRCM 0240 U.S. GOVERNMENT PRINTING OFFICE: 1979-289-369
SCHEDULE COMPLETION OF INPUT NECESSARY FOR SONGS FES The following review areas will need to be completed or revised prior to issuing the SONGS FES:
Response to comments (PM) 01/15/81 Revised accident section (AEB) 03/31/81 Revision to Environmental Effects of Uranium Fuel Cycle (PM) 12/31/80 Need for Station (ORNL) 01/15/81 Archeological review completed (State of Calif.)
01/30/81 Review NRC Report (ORNL) 01/30/81 Heat treatment review completed (ORNL) 01/15/81 Review of ER Supplement #6 (soon to be submitted)
(ORNL-PM) 01/30/81 Assuming all areas are closed out by 01/30/81, SONGS FES could be issued within 2-4 weeks (Mid February to early March).
The above schedule is predicated ORNL completing their review areas by 01/30/81.
A meeting with ORNL is planned for week of December 8, 1980 to discuss availability of ORNL resources.
If we assume the FES without Class 9 accident discussion is to be issued, earliest date for that FES would be February 15, 1981.
Thus, bifurcating the publication of the FES would result in only a six-week, at most, difference between an incomplete FES and complete FES.
0<
It DISTRIBUTION Docket Files SAB Reading SAB Plant File APR 14 1941 DRMuller WHRegan Docket Nos. 50-361 50-362 MEMORANDUM FOR:
Frank Miraglia, Chief Licensing Branch No. 3, DOL FROM:
Wm. H. Regan, Jr., Chief Siting Analysis Branch, DE
SUBJECT:
CULTURAL RESOURCES INPUT TO SAN ONOFRE NUCLEAR GENERATING STATION PFES This is in response to Dno Scaletti's request to provide a revision of the second paragraph of Section 5.2 Impacts on Land Use of the San Onofre Generating Station PFES. Attached is a copy of the insert prepared and given to Dino Scaletti on April 10, 1981, for inclusion in the SONGS-FES.
The cultural resources input was prepared by Louis Bykoski who can be reached on 492-4879.
Wm. H. Regan, Jr., Chief Siting Analysis Branch Division of Engineering
Attachment:
As stated cc: D. Cleary D. Scaletti L. Bykoski DE; T:SAB:RIA DE:ET.:SAB:RIA DE;E'TSAB.
Lf 40ki :cc DPCleary WHRogqan 4/13/81 4/. /81 4/'
1
Docket Files SAB Reading SAB Plant File DRMuller WHRegan Docket Nos. 50-361 50-362 MEMORANDUM FOR:
Frank Niraglia, Chief Licensing Branch No.
3,, DOL FROM:
Wi. H. Regan, Jr., Chief Siting Analysis Branch, DE
SUBJECT:
CULTURAL RESOURCSS INPUT TO SAN OiOFRE NUCLEAR GENERATING STATION PFES This is in response to Dino Scaletti's request to provide a revision of the second paragraph of Section 5.2 Impacts on Land Use of the San Onofre Generating Station PFES. Attached is a copy of the insert prepared and given to Dino Scaletti on April 10, 1981, for :inclusion in the SONGS-FES.
The tultural resources input was prepared by Louis Bykoski who can be reached on 492-4879.
Original signed by W. H. Regan, Jr.
Wn. H. Regan, 3R., Chief Siting Analysis Branch Division of Engineering
Attachment:
As stated cc: D. Cleary D. Scaletti L. Bykoski DE:ET:SAB:RIA.DE:ET:.SAB:RIA..DE:ET:SAB.
LMBykoski:cc DPCleary WHRegan 4/13/81
-4f7