AUGi '..
Docket Nos.:
50-361 and 50-362 APPLICANTS:
SOUTHERN CALIFORNIA EDISON C0MPAN:, (SEE)
SAN DIEGO GAS AND ELECTRIC COMPANY (SDG&E).
FACILITY:
SAN ONOFRE NUCLEAR GENERATING STATION,. UNITS, 2 AND 3
SUBJECT:
SUMMARY
OF SAN ONOFRE MEETINGS OF AUGUST 12-15, 1980 On August 12 through 15, 1980, members of the NRC. Staff met with the applicants and their contractors, Combustion Engineering.and Bechtel, in Bethesda, Maryland, to discuss the non-TMI-related open items.
Most of these items were previously identified in the NRC letter of March 15, 1979, "SER OPEN ITEMS LIST," Robert L. Baer to James H..Drake and B. W. Gilman. Enclosure 1 gives the agenda and attendees at the meetings. is a list of the open items discussed at.the meetings, the current status of each item (open or resolved), and the organization responsible for the next action. At the meeting, the staff indicated that for dose calculations, 8.gph is a more appropriate leak rate than 50 gpm for leakage from ESF equipment.,
At the meeting, the applicants committed..to install the 3rd auxiliary feedwater pump prior to exeeeding 5f. power...
H. Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosure:
As Stated 80091 0 ew OFFICE L;[L
......... L#3.......................................................
SURNAME
.. RQQd: e.
er DATE/
8/.
. / 0..... 81
... 18 NRC FORM 318 (9-76) NRCM-0240 S. GOVERNMENT PRINTING OFFICE: 1979-289-369
.MEETIN G SU1MARY DISTRIBUTION AUG 2 7 1980 Docket File J. Stolz NRC PDR S. Hanauer Local POR P. Collins TIC
- 0. Vassallo NSIC
- 0. Zierann Branch File R. Mattson H. Denton R. Schroeder E. Case K. Kniel
- 0. Eisenhut
- 0. Skovholt R. Purle G. Kniqhton T. Novak M. Ernst S. Varga R. Ber T. Ippolito C. Berlincer R. A. Clark S. Israel R. Reid ACRS (16)
R. Tedesco Attorney, GELD J. Youngblood OIE (3)
A. Schwencer OSO (7)
Chief, Licensing Branch #3 Project Manacer H. Rood J. R. Miller Licensina Assistant j G. Lainas Receotionist D. Crutchfield TERA Chief, Systemic Evaluation Program Branch J. LeDoux, I&E Chief, Oerating Reactors Assessment Branch D. Tondi R. Vollmer 1&E Headnuarters R. Bosnak I&E Region I F. Schaucr 1&E Reaion 11 R. E. Jackson l&E Region III G. Lear I&E Reaion IV V. Noonan I&E Region V S. Pawlicki V. Benaroya NRC Partic.iaants:
Z. Rosztoczy D. Bessette - ACRS
- 0. Parr ASB W. Haass R. Gamble MTEB A. Cappucci -
MEB D. Muller J. Grant MTEB C. Kramer ICSB R. Ballard H. Rood M. Srinivasan -
ICS1 W. Regan G. Alberthal--- RSB
- 0. Thatcher ICSB J. D. Saltzman W. Johnston -
CPB J. Wermiel ASB
- 0. Ross
- 0. Powers
- CPB J. Carter.- RSB P. Check H. Schierling -
AEB C. Liang -
RSB R. Satterfield B. Mann -
ASB B. Sheron -
RSB
- 0. Parr bcc:
Aoplicant & Service List F. Rosa W. Butler W. Kreger M. Tokar -
CPB C. Hofmayer -
EQB R. W. Houston P. Hearn
- CSB H. Balujian -
CPB T. Murphy C. Tinkler CSB W. Gammill L. Phillips CPB L. Rubenstein K. Campe -
SAB T. Soei, R. Gonzales -
HGEB Chief, Core Performance Branch L.- Kopp -
CPB G. Harrison -
CEB P. Chen -
AUG Docket Nos.:
50-361 and 50-362 APPLICANTS:
SOUTHERN CALIFORNIA EDISON.COMPANY (SEE)
SAN DIEGO GAS AND ELECTRIC COMPANY (SDG&E)
FACILITY:
SAN ONOFRE NUCLEAR GENERATING STATION,. UNITS. 2 AND 3
SUBJECT:
SUMMARY
OF SAN ONOFRE..MEETINGS OF AUGUST 12-15,. 1980 On August 12 through 15, 1980,,members of the. NRC Staff met with the applicants and their contractors, Combustion Engineering.and Bechtel, in Bethesda, Maryland, to discuss the non-TMI-related open items.
Most of these items were previously identified in the NRC letter of March 15, 1979, "SER OPEN ITEMS LIST," Robert L.,Baer to James H. Drake and B. W. Gilman. Enclosure I gives the agenda and attendees at the meetings. is a list of the open items discussed at the meetings, the current status of each item (open or resolved), and the organization responsible for the next action.. At the meeting, the staff indicated that for dose calculations, 8 gph is a more appropriate leak rate than 50 gpm for leakage from ESF equipment.,
At the.meeting, the applicants comnitted to install the 3rd auxiliary feedwater pump prior to exeeeding 5% power.,
H. Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosure:
As Stated OFFICEO-..
- LB.
- 3...................
SURNAME *~.00.:
ec...ASc.wencer..........
SURNMEO.HRood:mec....
M; weny,,Q r..........................................
DATE 8/.1../80..
81...110............
NAC FORM 318 (9-76) NRCM 0241 U.S. GOVERNMENT PRINTING OFFICE: 1979-289-369
f aEG UN ITED STA TES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAUG 7 1S80 Docket Nos.:
50-361 and 50-362 APPLICANTS:
SOUTHERN CALIFORNIA EDISON COMPANY (SCE)
SAN DIEGO GAS AND ELECTRIC COMPANY (SDG&E)
FACILITY:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3
SUBJECT:
SUMMARY
OF SAN ONOFRE MEETINGS OF AUGUST 12-15, 1980 On August 12 through 15, 1980, members of the NRC Staff met with the applicants and their contractors, Combustion Engineering and Bechtel, in Bethesda, Maryland, to discuss the non-TMI-related open items.
Most of these items were previously identified in the NRC letter of March 15, 1979, "SER OPEN ITEMS LIST," Robert L. Baer to James H. Drake and B. W. Gilman. Enclosure 1 gives the agenda and attendees at the meetings. is a list of the open items discussed at the meetings, the current status of each item (open or resolved), and the organization responsible for the next action. At the meeting, the staff indicated that for dose calculations, 8 gph is a more appropriate leak rate than 50 gpm for leakage from ESF equipment.
At the meeting, the applicants committed to install the 3rd auxiliary feedwater pump prior to exceeding 5% power.
H. Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosure:
As Stated
Mr. Robert Dietch Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Mr. S. W. Gilman Sencr Vice President -
Operations San Diego Gas & Electric Company 101 Ash Street P. O. Box 1831 San Diego, California 92112 cc:
Charles R. Kocher, Esq.
James A. Becletto, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Chickering & Gregory ATTN:
David R. Pigott, Esq.
Counsel for San Diego Gas & Electric Company Southern California Edison Company 3 Embarcadero Center - 23rd Floor San Francisco, California 94112 Mr. George Caravalho City Manager City of San Clemente 100 Avenido Presidio San Clemente, California 92672 Alan R. Watts, Esq.
Rourke & Woodruff Suite 1020 1055 North Nain Street Santa Ana, California 92701 Lawrence Q. Garcia, Esq.
California Public Utilities Commission 5065 State Building San Francisco, California 94102 Mr. V. C. Hall Combustion Engineering, Incorporated 1000 Prosoect Hill Road Windsor, Connecticut 06095
Mr. Robert Dietch 2
Mr.
B. W. Gilman cc:
Mr. P. Dragolovich Bechtel Power Corporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Mr. Mark Medford Southern California Edison Company 2244 Walnut Grove Avenue P. 0.'Box 800 Rosemead, California 91770 Henry Peters San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Ms.
Lyn Harris Hicks Advocate for GUARD 3908 Calle Ariana San Clemente, California 92672 Richard J. Wharton, Esq.
Wharton & Pogalies Suite 106 2667 Camino Del Rio South San Diego, California 92108 Phyllis M. Gallagher, Esq.
Suite 222 1695 West Crescent Avenue Anaheim, California 92701 Mr. A. S. Carstens 2071 Caminito Circulo Norte Mt. La Jolla, California 92037 Resident Inspector, San Onofre/NPS co U. S. Nuclear Regulatory Commission P. 0. Box AA Oceanside, California 92054
ENCLOSURE 1 ATTENDEES AND AGENDA MEETINGS TO DISCUSS NON-TMI-RELATED OPEN ITEMS SAN ONOFRE 2 AND 3 DATE TIME NRC BRANCH NAME ORGANIZATION 8-12-80 8:00 AM MTEB D. Bessette NRC-ACRS R. Gamble NRC-MTEB J.M. Grant NRC-MTEB H. Rood NRC-LB3 M. Medford SCE R.L. Phelps SCE H. Peters SDG&E J. Ely C-E A.B. Spinell, Jr.
C-E 8-12-80 1:00 PM CPB-FUELS G. Alberthal NRC-RSB W.V. Johnston NRC-CPB D. Powers NRC-CPB H. Rood NRC-LB3 M. Medford SCE R.L. Phelps SCE A.B. Spinell, Jr.
C-E 8-13-80 9:00 AM AEB H. Schierling NRC-AEB H. Rood NRC-LB3 M. Medford SCE R. L. Phelps SCE H. Peters SDG&E A.B. Spinell, Jr.
C-E J.B. Hosmer BECHTEL E. Richardson BECHTEL 8-13-80 1:30 PM ASB B. Mann NRC-ASB
C-E G.J. Tobin C-E J.B. Hosmer BECHTEL E. Richardson BECHTEL
-2 DATE TIME NRC BRANCH NAME ORGANIZATION 8-14-80 8:00 AM MEB A.J. Cappucci NRC-MEB H. Rood NRC-LB3 H.R. Fleck ETEC M. Medford SCE R.L. Phelps SCE H. Peters SDG&E A.B. Spinell, Jr.
C-E T.E. Natan C-E E. Richardson BECHTEL 8-14-80 10:00 AM ICSB C.R. Kramer NRC-ICSB B. Mann NRC-ASB H. Rood NRC-LB3 M. Srinivasan NRC-ICSB D. Thatcher NRC-ICSB J. Wermiel NRC-ASB M. Medford SCE R.L. Phelps SCE A.B. Spinell, Jr. C-E E. Richardson BECHTEL 8-15-80 8:00 AM RSB J. Carter NRC-RSB C. Liang NRC-RSB B. Mann NRC-ASB
- 0. Parr NRC-ASB H. Rood NRC-LB3 B. Sheron NRC-RSB M. Tokar NRC-CPB M. Medford SCE R.L. Phelps SCE H. Peters SDG&E D. Earles C-E A.B. Spinell, Jr. C-E S. Lelewer BECHTEL E. Richardson BECHTEL 8-15-80 1:00 PM CSB P. Hearn NRC-CSB H. Rood NRC-LB3 C. Tinkler NRC-CSB M. Medford SCE R.L. Phelps SCE W.G. Dove, Jr.
C-E A.B. Spinell, Jr. C-E S. Lelewer BECHTEL E. Richardson BECHTEL
-3 DATE TIME NRC BRANCH NAME ORGANIZATION 8-15-80 3:00 PM CPB-TH L. Phillips NRC-CPB H. Rood NRC-LB #3 M. Medford SCE R.L. Phelps SCE A.B. Spinell, Jr. C-E E. Richardson BECHTEL
ENCLOSURE 2 STATUS OF NON-TMI-RELATED OPEN ITEMS ITEM NO.
NAME OF ITEM NRC Q's STATUS ACTION MTEB 1 Appendix G compliance 121.18.22,.25 OPEN Applicant MTEB 2 Appendix H compliance 121.24 OPEN Applicant MTEB 3 ISI 121.16,.17,.27 OPEN Applicant MTEB 4 P-T limit curves 121.23 OPEN Applicant MTEB 5 RCP flywheel integrity 121.26 OPEN Applicant CPB 1 LOCA & SSE loads on grids 231.26 OPEN Applicant CPB 2 EOL fuel rod pressure 231.25 RESOLVED Staff (Powers)
CPB 3 CEA guide tube wear 231.32 OPEN Applicant CPB 4 Spent fuel surveillance 231.31 RESOLVED Staff (Powers)
CPB 5 Clad swelling OPEN Applicant AAB 1 Explosion hazards 312.42 OPEN Staff (Campe)
AAB 2 Gas pipeline hazards 312.36 OPEN Staff (Campe)
AAB 3 Control room isolation 312.37 RESOLVED Staff (Schierling AAB 4 ESF leakage 312.39 OPEN Staff (Schierling AAB 5 Boron plugging of ESF lines 312.40 RESOLVED Staff (Schierling AAB 6 Spent fuel pool pressure 312.38 OPEN Staff (Schierling ASB 1 Flood protection 010.63 OPEN Staff (Gonzales)
ASB 2 High energy line break 112.2 OPEN Staff (Mann)
ASB 3 Storage of Unit 1 fuel 010.62 OPEN Staff (Mann, Kopp ASB 4 Fuel pool makeup system 010.64 OPEN Staff (Mann)
ASB 5 RCP tests without CCW 010.58 OPEN Applicant
-2 ITEM NO.
NAME OF ITEM NRC Q's STATUS ACTION ASB 6 Condensate storage 010.65 OPEN Applicant capacity ASB 7 Aux. bldg. ventilation 010.60 RESOLVED Staff (Mann) system ASB 8 Fire protection 010.15 OPEN Staff (Harrison)
ASB 9 PORV capability 010.66 RESOLVED Staff (Mann)
ASB 10 3RD AFW pump OPEN Applicant MEB 1 Reactor intervals 112.8 OPEN Staff (Cappucci) analysis MEB 2 SQRT audit OPEN Staff (Chen)
MEB 3 Shutdown equipment review 112.35-.40 OPEN Staff (Cappucci)
MEB 4 Load combination methods 112.34 RESOLVED Staff (Cappucci)
MEB 5 Independent piping 112.39 OPEN Staff (Cappucci) analysis ICSB 1 Site electrical visit OPEN Staff (Thatcher, Fitzpatrick)
ICSB 2 PPS power supply inde-032.32 RESOLVED Staff (Thatcher) pendence ICSB 3 Bypass of RPS channel OPEN Staff (Thatcher)
ICSB 4 Seismic qualification 032.4,.6 OPEN Staff (Hofmayer)
ICSB 5 Environmental quali-032.5,.28 OPEN Staff (Ashe) fication RSB 1 RHR position 212.157 OPEN Applicant RSB 2 SDCS pipe break 212.155 RESOLVED Staff (Carter)
RSB 3 LPSI valve position 212.156 RESOLVED Staff (Carter) indication RSB 4 Small break LOCA analysis 212.151 RESOLVED Staff (Carter)
RSB 5 HPSI pump reliability 212.153 RESOLVED Staff (Liang)
RSB 6 3RD HPSI pump leak 212.147 RESOLVED Staff (Liang) detection
-3 ITEM NO.
NAME OF ITEM NRC O's STATUS ACTION RSB 7 Sump vortex test report 212.127 OPEN Applicant RSB 8 Amount of fuel failures 212.148,.150 RESOLVED Staff (Liang)
RSB 9 Boron dilution 212.152 OPEN Applicant RSB 10 RCP shaft break 212.154 RESOLVED Staff (Liang)
RSB 11 Missiles inside contain-212.158 OPEN Applicant ment RSB 12 Hot leg injection 212.145 RESOLVED Staff (Carter CSB 1 Thermal environment 022.60 RESOLVED Staff (Hearn)
CSB 2 Subcompartment nodali-022.59,.65 OPEN Applicant zation CSB 3 Mass release thru purge 022.61 RESOLVED Staff (Hearn) lines CSB 4 Purge line debris screens 022.62,.63 OPEN Applicant CSB 5 AFW runout flow 022.64 OPEN Applicant AB 1 CPC 221.18 OPEN Applicant AB 2 Loose parts monitor 221.17 RESOLVED Staff (McCoy)
AB 3 DNBR testing of new FEA 221.19 OPEN Staff (Phillips)
AB 4 SLB & FLB analyses 222.27-.40 OPEN Staff (Liang, Phillips)