.AUG 1 1980 Docket Nos.:
50-361/362 APPLICANTS:
Southern California Edison Company (SCE)
San Diego Gas and Electric Company (SDG&E)
FACILITY:
San Onofre Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS CONTROL ROOM DESIGN REVIEW PROGRAI On July 2, 1980, members of the NRC staff met with the applicant (SCE) and its contractors in Bethesda, Maryland to discuss the above subject.
Attendees at the meeting are given in 3nclosure 1.
At the meeting the applicant presented the control room design review program that it plans to conduct. Major milestones for the program are given in Enclosure 2. At the meeting the staff indicated that it would like to visit the plant control room and discuss plant operation with the plant operators. The site visit was scheduled for the week of August 4, 1980. The staff requested that to facilitate the site visit, the applicant should have available for staff review at the site visit (or, if possible, submit prior to the visit) the following items:
(1) a set of drawings of the control room and panel layouts (2)
Jhotographs of the control room panels (3) selected emergency procedures;.specificially:
- a. LOCA
- b. Steam generator tube rupture
- c. Feedwater lia break
- d. Loss of feedwater The staff indicated that a summary report of the results of the control room site visit would be issued within about two weeks after the visit is completed.
H. Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
A sts)ted.
DL:LB. #3.......
DL: L1 #3.................................
SURNAME
).t
.HRood iec....
ASchwencer...
cc: Se next page RDATE NRC.M.0240.......GOVERNMENT.PRINTING.O NRC FORM 318 (9-76) NRCM 0240
- U.S.
GOVERNMENT PRINTING OFFICE: 1979-289-369
MEETING
SUMMARY
DISTRIBUTION AUG 11980 Docket File J. Stolz NRC POR S. Hanauer Local PDR P. Collins TIC D. Vassallo NSIC D. Ziemann Branch File R. Mattson H. Denton R. Schroeder E. Case K. Kniel D. Eisenhut D. Skovholt R. Purole G. Kniqhton T. Novak M. Ernst S. Varga R. Baer T. Ippolito C. Berlinger R. A. Clark S. Israel R. Reid ACRS (16)
R. Tedesco Attorney, OELD J. Youngblood OIE (3)
A. Schwencer 050 (7)
Chief, Licensing Branch #3 Project Manager H. Rood J. R. Miller i lle Licensing Assistant _J.
Lee G. Lainas Receotionist D. Crutchfield TERA Chief, Systemic Evaluation Program Branch J. LeDoux, I&E Chief, Operating Reactors Assessment Branch D. Tondi R. Vollmer I&E Headouarters R. Bosnak I&E Region I F. Schauer I&E Reaion II R. E. Jackson I&E Region III G. Lear I&E Region IV V. Noonan I&E Region V S. Pawlicki V. Benaroya NRC Particioants:
Z. Rosztoczy J. Stampelos - ACRS D. Muller R. Rroelich R. Ballard W. Thompson W. Regan.
T. Loomis W.
ReganD.
Scaletti J. 0. Saltzman D. Key D. Ross G. Kelly P. Check H. Price R. Satterfield
- 0. Parr bcc:
Aoplicant & Service List F. Rosa W. Butler W. Kreger R. W. Houston T. Murphy W. Gammill L. Rubenstein T. Sneis Chief, Core Performance Branch
AUG 1980 Docket Nos.:
50-361/362 APPLICANTS:
Southern California Edison Company (SCE)
San Diego Gas and Electric Company (SDG&E)
FACILITY:
San Onofre Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMHARY OF MEETING TO DISCUSS CONTROL. ROOi DESIGN REVIEW PROGRAM On July 2, 1980, members of the NRC staff miet with the applicant (SCE) and its contractors in Bethesda, Maryland to discuss the above subject.
Attendees at the eeting are given in 3nclosure 1.
At the meeting the applicant presented the control room design review program that it plans to conduct.
Major milestones for the program are given in Enclosure 2. At the meeting the staff indicated that it would like to visit the plant control room and discuss plant operation with the plant operators.
The site visit was scheduled for the week of August 4, 1980.
The staff requested that to facilitate the site visit, the applicant should have available for staff review at the site visit (or, if possible, submit prior to the visit) the following items:
(1) a set of drawings of the control room and panel layouts (2) dhotographs of the control room panels (3) selected emergency procedures; specificially:
- a.
- b.
Steam generator tube rupture
- c.
Feedwater liNe break
- d.
Loss of feedwater The staff indicated that a summary report of the results of the control room site visit would be issued within about two weeks after the visit is completed.
H. Rood, roject lanager Licensin branch No. 3 Division of Licensing T o te OL:.LB #3...
3.....................
u
.. HRood;mec ASchwercer CC*
e next page Sra.M r.e....io.r7/
/.
ov7/
80 an....
JZc FII II (l
1 18
- 1)
IC 1\\ '
"10
,-)~fv IIIII ~N I
C cC 1
y,.
UNITED STATES 4?
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 op AUG i 1980 Docket Nos.: 50-361/362 APPLICANTS:
Southern California Edison Company (SCE)
San Diego Gas and Electric Company (SDG&E)
FACILITY:
San Onofre Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS CONTROL ROOM DESIGN REVIEW PROGRAM On July 2, 1980, members of the NRC staff met with the applicant (SCE) and its contractors in Bethesda, Maryland to discuss the above subject.
Attendees at the meeting are given in Enclosure 1.
At the meeting the applicant presented the control room design review program that it plans to conduct. Major milestones for the program are given in Enclosure 2. At the meeting the staff indicated that it would like to visit the plant control room and discuss plant operation with the plant operators. The site visit was scheduled for the week of August 4, 1980. The staff requested that to facilitate the site visit, the applicant should have available for staff review at the site visit (or, if possible, submit prior to the visit) the following items:
(1) a set of drawings of the control room and panel layouts (2) photographs of the control room panels (3) selected emergency procedures; specificially:
- a. LOCA
- b. Steam generator tube rupture
- c. Feedwater line break
- d. Loss of feedwater The staff indicated that a summary report of the results of the control room site visit would be issued within about two weeks after the visit is completed.
H. Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc:
See next page
Mr. Robert Dietch Vice President Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Mr. S. W. Gilman Senior Vice President - Operations San Diego Gas.&
Electric Company 101 Ash Street P. 0. Box 1831 San Diego, California 92112 cc:
Charles R. Kocher, Esq.
James A. Beoletto, Esq.
Southern CaTifornia Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Chickering & Gregory ATTN:
David R. Pigott, Esq.
Counsel for San Diego Gas & Electric Company Southern California Edison Company 3 Embarcadero Center -
23rd Floor San Francisco, California 94112 Mr. George Caravalho City Manager City of San Clemente 100 Avenido Presidio San Clemente, California 92672 Alan R. Watts, Esq.
Rourke & Woodruff Suite 1020 1055 North Main Street Santa Ana, California 92701 Lawrence Q. Garcia, Esq.
California Public Utilities Commission 5066 State Building San Francisco, California 94102 Mr. V. C. Hall Combustion Engineering, Incorporated 1000 Prospect Hill Road Windsor, Connecticut 06095
Mr. Robert Dietch
- 2 Mr. B. W. Gilman cc:
Mr. P. Dragolovich Bechtel Power Gorporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Mr. Mark Medford Southern California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Henry Peters San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Ms. Lyn Harris Hicks Advocate for GUARD 3908 Calle Ariana San Clemente, California 92672 Richard J. Wharton, Esq.
Wharton & Pogalies Suite 106 2667 Camino Del Rio South San Diego, California 92108 Phyllis M. Gallagher, Esq.
Suite 222 1695 West Crescent Avenue Anaheim, Calif6rnia 92701 Mr. A. S. Carstens 2071 Caminito Circulo Norte Mt. La Jolla, California 92037 Resident Inspector, San Onofre/NPS c/o U. S. Nuclear Regulatory Commission P. 0. Box AA Oceanside, California 92054
ENCLOSURE 1 ATTENDEES SAN ONOFRE 2 AND 3 MEETING ON CONTROL ROOM DESIGN REVIEW JULY 2, 1980 SCE NRC H. L. Richter J. Stampelos M. Medford R. W. Froelich W. N. Thompson T. Loomis Bechtel D. Scaletti G. Kelly J. Roberts H. Price R. L. Rogers H. Rood T. E. Richardson C-E A. Spinell
N.7
- )
49
- 'J4
'k4 4I14
'44