lPacific Gas and Electric Company' Barry S. Allen Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 September 16, 2013 Fax: 805.545.6445 PG&E Letter DCL-1 3-092 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Technical Specification Bases, Revision 8
Dear Commissioners and Staff:
Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program,"
Pacific Gas and Electric Company (PG&E) hereby submits Revision 8 of the DCPP TS Bases. DCPP TS Bases, Revision 8, includes changes made to the DCPP TS Bases from October 13, 2011, through August 28, 2013, and replaces Revision 7 in its entirety. Changes are noted by revision bars in the right margin of the affected TS Bases.
PG&E is submitting the DCPP TS Bases, Revision 8, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 8," dated September 2013. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Regional Administrator, Region IV, the DCPP NRR Project Manager, and the DCPP NRC Senior Resident Inspector.
The CD contains the following file:
File Name File Size (Mb) 01 DCPP TS Bases R8.pdf 1.4 PG&E makes no new or revised regulatory commitments as defined by NEI 99-04, "Guidelines for Managing NRC Commitment Changes," dated July 1999, in this submittal.
If you have any questions regarding this submittal, please contact Mr. Tom Baldwin at (805) 545-4720.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway - Comanche Peak - Diabto Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
Document Control Desk September 16, 2013 Page 2 PG&E Letter DCL-13-092 Sincerely, Barry S. Allen Site Vice President Enclosure cc:
Diablo Distribution cc/enc:
Thomas R. Hipschman, NRC Senior Resident Inspector Jennivine K. Rankin, NRR Project Manager Steven A. Reynolds, Acting NRC Region IV Administrator A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas Project
- Wolf Creek
PG&E Letter DCL-13-092 Enclosure Diablo Canyon - Units I and 2 Technical Specification Bases Revision 8, September 2013 (Revision 8 replaces Revision 7 in its entirety)
PG&E Letter DCL-13-092 Enclosure Diablo Canyon - Units 1 and 2 Technical Specification Bases Revision 8, September 2013 (Revision 8 replaces Revision 7 in its entirety)
- anyon POW' fil,.......
- ij