George H. Gellrich Vice President CENG a joint venture of 0Coristegain 4191 Ene0gy

,,eDF CALVERT CLIFFS NUCLEAR POWER PLANT Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax September 24, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Report, Revision 46 Enclosed for your use is one copy (CD) of our Updated Final Safety Analysis Report (UFSAR),

Revision 46. This revision is submitted within six months after the latest refueling outage in accordance with 10 CFR 50.7 1(e).

The List of Effective pages are included. This electronic copy is a complete revision.

Attachment (1) provides a description of changes to commitments made to the Nuclear Regulatory Commission.

There are no new regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

Very truly yours, Ao~s

Document Control Desk September 24, 2013 Page 2 CERTIFICATION:

I, George H. Gelirich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant, LLC, and that the information contained in this submittal accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.

GHG/BJD/bjd

Attachment:

(1)

Changes to Commitments Made to the Nuclear Regulatory Commission

Enclosure:

Updated Final Safety Analysis Report, Revision 46 (CD) cc:

NRC Project Manager, Calvert Cliffs (Without Enclosure)

NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Gray, MD-DNR

ATTACHMENT (1)

CHANGES TO COMMITMENTS MADE TO THE NUCLEAR REGULATORY COMMISSION Calvert Cliffs Nuclear Power Plant, LLC September 24, 2013

ATTACHMENT (1)

CHANGES TO COMMITMENTS MADE TO THE NUCLEAR REGULATORY COMMISSION Calvert Cliffs (NRC):

Commitment:

Change:

Justification:

has changed the following commitments made to the Nuclear Regulatory Commission Line items 201 and 210 provide for inclusion of refueling water tank penetrations and associated welds as locations to be walked down by MN-1-319, System and Structure Walkdowns and the Age-Related Degradation Inspection Programs to manage effects of aging during the period of extended operations.

Calvert Cliffs Nuclear Power Plant will not be crediting periodic walkdowns performed as part of the MN-1-319, System and Structure Walkdowns and the Age-Related Degradation Inspection Program to management effects of aging on subject structures, systems, and components.

Engineering study performed by Design Engineering concluded that periodic inspections of refueling water tank penetrations and associated welds performed as part of the Boric Acid Corrosion Inspection Program will be sufficient to manage effects of aging on subject structures, systems, and components, as outlined on Line Item 204 on Updated Final Safety Analysis Report Table 16-2.

Visual Inspection of Graylor clamps on Reactor Vessel Level Monitoring System flanges.

Commitment is no longer required.

The Graylor clamps were removed when the Reactor Vessel Head was replaced. New Quickloc stalks have no license renewal commitments.

Commitment:

Change:

Justification: