ML13266A156
| ML13266A156 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/23/2013 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Koehl D South Texas |
| laura hurley | |
| References | |
| 50-498/13-301, 50-499/13-301 | |
| Download: ML13266A156 (3) | |
See also: IR 05000498/2013301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
September 23, 2013
Mr. Dennis L Koehl
President &CEO/CNO
STP Nuclear Operating Company
P.O. Box 289
VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000498/2013301;
Dear Mr. Koehl:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at South Texas Project Electric Generating Station.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. K. Struble,
Operations Training Supervisor. Note that any examination waivers and application denials
have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on September 26, 2013. The NRC
staff will administer the operating tests during the week of September 30, 2013. This
examination has undergone extensive review by my staff and representatives responsible for
licensed operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at
your facility. If you determine that this examination is not appropriate for licensing operators at
your facility, do not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
V;lufA) b/f~Jn
Vincent Gaddy, ~.~;e~r
Operations Branch
Division of Reactor Safety
UNITED STATES
NUCLEAR REGULATORY COMMISSION
Mr. Dennis L Koehl
President & CEO/CNO
STP Nuclear Operating Company
P.O. Box 289
VVadsworth, TX 77483
REGION IV
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
September 23, 2013
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000498/2013301;
Dear Mr. Koehl:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at South Texas Project Electric Generating Station.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. K. Struble,
Operations Training Supervisor. Note that any examination waivers and application denials
have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on September 26, 2013. The NRC
staff will administer the operating tests during the week of September 30, 2013. This
examination has undergone extensive review by my staff and representatives responsible for
licensed operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at
your facility. If you determine that this examination is not appropriate for licensing operators at
your facility, do not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
V;lufA) b/f~Jn
Vincent Gaddy, ~.~;e~r
Operations Branch
Division of Reactor Safety
STP Nuclear Operating Company
- 2
Dockets: 50-498; 50-499
Enclosure: ES-201-4
cc w/enclosure:
Ken Struble, Supervisor
Operations Training
N4007
STP Nuclear Operating Company
P.O. Box 289
VVadsworth, TX 77483
cc wlo enclosure:
Distribution via ListServ for South Texas Project
STP Nuclear Operating Company
Dockets: 50-498; 50-499
Enclosure: ES-201-4
cc w/enclosure:
Ken Struble, Supervisor
Operations Training
N4007
STP Nuclear Operating Company
P.O. Box 289
VVadsworth, TX 77483
cc wlo enclosure:
- 2 -
Distribution via ListServ for South Texas Project
STP Nuclear Operating Company
- 3
Electronic distribution by RIV:
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
DRP Director (Kriss. Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Acting Resident Inspector (David.You@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor. Dricks@nrc.gov)
Public Affairs Officer (Lara.Useldil1g@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRSITSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement. Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (DanieI.Rich@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
OFFICIAL RECORD COPY
T=Telephone
E=E-mail
F=Fax
STP Nuclear Operating Company
- 3 -
Electronic distribution by RIV:
Acting Regional Administrator (Steven.Reynolds@nrc.gov)
Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)
DRP Director (Kriss. Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Acting Resident Inspector (David.You@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor. Dricks@nrc.gov)
Public Affairs Officer (Lara.Useldil1g@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRSITSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement. Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (DanieI.Rich@nrc.gov)
Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)
OFFICIAL RECORD COPY
T=Telephone
E=E-mail
F=Fax