ML13263A355
| ML13263A355 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/19/2013 |
| From: | Thompson B South Carolina Electric & Gas Co |
| To: | Robert Williams NRC/RGN-II |
| References | |
| Download: ML13263A355 (1) | |
Text
Bruce L. Thompson Manager, Nuclear Licensing 803.931.5042 September 19, 2013 A SCANA COMPANY U. S. Nuclear Regulatory Commission, Region II Attn: Robert E. Williams 245 Peachtree CenterAvenue NE, Suite 1200 Atlanta, GA 30303-1257
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (UNIT 1)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 NRC REQUEST FOR INFORMATION ULTIMATE HEAT SINK INSPECTION SEPTEMBER 30-OCTOBER 4, 2013
References:
Steven J. Vias, NRC Chief, letter to Thomas D. Gatlin, August 7, 2013 Notification of Inspection and Request for Information for NRC Inspection Procedure (IP) 71111.07 (dated 7/06/2010) "Heat Sink Performance" As requested in the referenced letter, the Virgil C. Summer Nuclear Station (VCSNS) hereby submits the requested information required to support the Ultimate Heat Sink Inspection scheduled for September 30 through October 4, 2013. The requested items, a through u, under section A.1 have been organized and provided on the enclosed disk.
Should you have any questions, please contact Ms. Beth Quattlebaum at (803) 345-4723.
Very truly yours, Bruce L. Thompson BJQ/BLT/wt Enclosure (1 Disk - VCSNS 2013 UHSI Phase A) c:(without enclosure unless noted)
R. E. Martin Document Control Desk S. J. Vias R. E. Williams Jr.(with attachment)
NRC Resident Inspector RTS (CR-1 3-03257)
File (5_Inspections-UHSI 2013)
DMS (RC-1 3-0146)
Virgil C. Summer Station -Post Office Box 88. Jenkinsville, SC
( 29065
- F (803) 941-9776