RA-13-090, Issuance of the Core Operating Limits Report for Cycle 24, Revision 9

From kanterella
(Redirected from ML13262A278)
Jump to navigation Jump to search
Issuance of the Core Operating Limits Report for Cycle 24, Revision 9
ML13262A278
Person / Time
Site: Oyster Creek
Issue date: 09/10/2013
From: Mckenna M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-13-090
Download: ML13262A278 (2)


Text

Exelon Generation.

Oyster Creek Generating Station www.exeloncorp.com Route 9 South PO Box 388 Forked River, NJ 08731 F

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 10 CFR 2.390(a)(4)

OCNGS TS 6.9.1.f. 4 RA-13-090 September 10, 2013 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

Issuance of the Core Operating Limits Report for Cycle 24, Revision 9 Enclosed is a copy of the Core Operating Limits Report (COLR) for Oyster Creek Nuclear Generating Station (OCNGS), Cycle 24, Revision 9. Revision 9 of this report incorporates one bypass valve out of service operating limitations.

This COLR is being submitted to the NRC in accordance with OCNGS Technical Specifications (TS) Section 6.9.1.f. 4 contains information proprietary to Global Nuclear Fuel. Global Nuclear Fuel requests that the document be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). An affidavit supporting this request is also contained in Attachment 1. contains a non-proprietary version of the Global Nuclear Fuel document.

Should you have any questions concerning this letter, please contact Jeff Chrisley at (609) 971-4469.

Respectfully, Mike McKen na Regulatory Assurance Manager Oyster Creek Nuclear Generating Station Attachment I transmitted herewith contains Proprietary Information. When separated from attachments, this document Is decontrolled OCNGS Issuance of the Core Operating Limits

Report for Cycle 24, Revision 9 September 10, 2013 Page 2 Attachments: 1) Core Operating Limits Report for Cycle 24, Revision 9 -

Affidavit and Proprietary Version

2) Core Operating Limits Report for Cycle 24, Revision 9 -

Non-Proprietary Version cc:

Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, OCNGS USNRC Project Manager, OCNGS