Issue date: 08/28/2013
From: Gatlin T
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, RC-13-0117
Download: ML13242A272 (5)


Text

Thomas D. Gatlin Vice President,Nuclear Operations (803) 345-4342 A SCANA COMPANY August 28, 2013 RC-13-0117 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 SOUTH CAROLINA ELECTRIC & GAS COMPANY (SCE&G) 6-MONTH STATUS REPORT OF ORDER EA-12-051, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION

References:

1. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012

[ML12054A682]

2. SCE&G's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2013.

RC-13-0031 [ML13063A099]

On March 12, 2012, the Nuclear Regulatory Commission issued an order (Reference 1) to South Carolina Electric & Gas Company (SCE&G). Reference 1 was immediately effective and directs SCE&G to have a reliable indication of the water level in associated spent fuel storage pools.

Reference 1 requires submission of a 6-month status report following the submittal of the Overall Integrated Plan (Reference 2). The purpose of this letter is to provide the 6-month status report pursuant to Section IV, Condition C.2, of Reference 1. SCE&G developed an Overall Integrated Plan (Reference 2), documenting the requirements to install reliable spent fuel pool level instrumentation, in response to Reference 1. Attachment I provides the 6-month status report of milestone accomplishments since the submittal of the Overall Integrated Plan.

This update includes any changes to the compliance method, schedule, or need for relief/relaxation and the basis.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Bruce L. Thompson at (803) 931-5042.

Virgil C.Summer Station , Post Office Box 88- Jenkinsville, SC. 29065, F(803) 941-9776 Ac c

Document Control Desk CR-12-01070 RC-13-0117 Page 2 of 2 I certify under penalty of perjury that the foregoing is true and correct.

Executed on Thomas D. Gat in BQ/TDG/ts

Attachment:

I. South Carolina Electric & Gas (SCE&G)'s Six Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton J. W. Williams W. M. Cherry E. J. Leeds V. M. McCree (w/attachment)

R. E. Martin (w/attachment)

NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-01070)

File (815.07)

PRSF (RC-13-0117)

Document Control Desk CR-12-01070 RC-13-0117 Attachment I Page 1 of 3 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT I ATTACHMENT I SOUTH CAROLINA ELECTRIC & GAS COMPANY (SCE&G) 6-MONTH STATUS REPORT OF ORDER EA-12-051, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION

1. Introduction SCE&G developed an Overall Integrated Plan (Reference 2), documenting the requirements to install reliable spent fuel pool level instrumentation (SFPLI), in response to Reference 1. This attachment provides an update of milestone accomplishments since submittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
2. Milestone Accomplishments The following milestone(s) in section 3 have been completed since the development of the Overall Integrated Plan (Reference 2), and are current as of August 28, 2013.

Prepared SCE&G's Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1173).

3. Milestone Schedule Status The following provides an update to milestone schedule to support the Overall Integrated Plan.

This section provides the activity status of each item, and the expected completion date. The dates are planning dates subject to change as design and implementation details are developed.

The revised milestone target completion dates do not impact the order implementation date.

Revised Target Activity Target Milestone Completion Status Completion Date Date Submit 60 Day Status Report Oct 2012 Complete Submit Overall Integrated Plan Feb 2013 Complete Submit Response to RAIs for Overall Aug 2013 Complete

Document Control Desk CR-12-01097 RC-13-0117 Attachment I Page 2 of 3 Revised Target Activity Target Milestone Completion Status Completion DateDate Integrated Plan Submit 6 Month Updates:

Update 1 Aug 2013 Complete Update 2 Feb 2014 Not Started Update 3 Aug 2014 Not Started Update 4 Feb 2015 Not Started Update 5 Aug 2015 Not Started Update 6 Feb 2016 Not Started Modifications:

Modification Development Jan 2014 Not Started Complete Procurement of Inspltr Proumetto tPcaeJun 2013 In Progress Instrumentation Package Nov 2013 Complete Engineering and Design Jul 2014 Not Started Commence Implementation Oct 2014 Not Started Unit 1 Implementation Outage Oct 2015 Not Started Procedures:

Complete Procedures Development Feb 2015 Not Started Training:

Develop Training Plan Feb 2015 Not Started Training Complete Aug 2015 Not Started

4. Changes to Compliance Method There is one change to the compliance method as documented in the Overall Integrated Plan (OIP) (Reference 1). The backup channel of the spent fuel pool level monitoring system will be

Document Control Desk CR-1 2-01070 RC-13-0117 Attachment I Page 3 of 3 a permanently installed channel instead of the portable channel described in the OIP. The details of this change are provided in the station response to the Request for Additional Information (References 3 and 4).

5. Need for Relief/Relaxation and Basis for the Relief/Relaxation SCE&G expects to comply with the order implementation date and no relief/relaxation is required at this time.
6. Open Items from Overall Integrated Plan and Draft Safety Evaluation None.
7. Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time.
8. References The following references support the updates to the Overall Integrated Plan described in this attachment.
1. NRC Order Number EA-1 2-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012.
2. SCE&G's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2013. (RC-13-0031)
3. Robert E. Martin to Thomas D. Gatlin Letter: Virgil C. Summer Nuclear Station, Unit 1-Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1 173) dated July 29, 2013
4. Virgil C. Summer Nuclear Station, Unit 1 Response to - Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1 173) Dated August 28, 2013 (RC-13-0119)