EN-13-029, Issuance of Final Significance Determination and Notice of Violation, Browns Ferry (EA-13-118)
ML13233A128
Person / Time
Site: Browns Ferry 
Issue date: 08/21/2013
From: Nick Hilton
NRC/OE
To:
Casey L
References
EA-13-118 EN-13-029
Download: ML13233A128 (2)


Text

August 21, 2013 EN 13-029 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

Tennessee Valley Authority EA-13-118 Browns Ferry Nuclear Plant, Unit 2 Docket No.: 50-260

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about August 23, 2013, to Tennessee Valley Authority (TVA) for a violation associated with a White Significance Determination Process finding identified during an inspection of the Browns Ferry Nuclear Plant, Unit 2. This White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections. It involves the failure of Browns Ferry personnel to properly implement procedure 2-OI-99, Reactor Protection System (RPS), which resulted in a failure to reenergize the 2B RPS Bus and an inappropriate action to de-energize the 2A RPS bus. This caused a Unit 2 reactor SCRAM and main steam isolation valve (MSIV) closure. Specifically, while performing procedure 2-OI-99, step 5.1[3], an operator incorrectly opened the RPS motor generator set tie to battery board 2 Breaker on the A RPS bus motor generator set while attempting to start the B RPS bus motor generator set.

A Notice of Violation is included based on TVAs failure to meet Technical Specification Section 5.4.1, which requires, in part, that written procedures be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 4 addresses Procedures for Startup, Operation, and Shutdown of Safety-Related Boiling Water Reactor Systems and lists item y, Reactor Protection System, as a system for which instructions should be prepared, as appropriate, for energizing, filling, venting, draining, startup, shutdown, and changing modes of operation. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.

TVA attended a Regulatory Conference on July 24, 2013, and presented its assessment of the significance of the finding. After reviewing the information developed during the inspection, and the information provided by TVA, the staff concluded that the finding is appropriately characterized as White.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination August 23, 2013 Telephone Notification of Licensee August 23, 2013 The State of Tennessee will be notified.

CONTACTS: Lauren Casey, OE, (301) 415-1038 Nick Hilton, OE, (301) 415-2741

Distribution: EN-13-029, August 21, 2013 OWFN Chair. Macfarlane Comm. Svinicki Comm. Apostolakis Comm. Magwood Comm. Ostendorff SECY OCA OPA OIP OWFN EDO DEDR DEDMRT OE OGC NRR OI OIG TWFN OCFO OP CENTER OIS FSME RES ACRS RES 3WFN NMSS NSIR Regional Offices RI RII RIII RIV MAIL Public OE staff Electronic DISTRIBUTION: