ML13226A176

From kanterella
Jump to navigation Jump to search
Email J. Poehler to J. Kim, Draft Follow-Up RAI for Core Plate Bolt Analysis
ML13226A176
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/11/2012
From: Jeffrey Poehler
NRC/NRR/DE/EVIB
To: James Kim
Plant Licensing Branch 1
References
FOIA/PA-2013-0139
Download: ML13226A176 (1)


Text

Poehler, Jeffrey 2

From:

Poehler, Jeffrey i0(Z,.

Sent:

Wednesday, Janury 11, 2012 1:43 PM To:

Kim, James

Subject:

RE: Draft Follow-Up RAI for Core Plate Bolt Analysis (ME6248)

Jim.

2 heduled to be working at home Tuesday - I can come in if necessary -)6 b)(6)Ibut I expect I should be able to make it in by afternoon. Or I can call in-from home if you have a

1) 1ine,.

Jeffrey C. Poehler Sr. Materials Engineer NRR/DE/EVIB (301) 415-8353 Prom:. Kim, James Sent: Wednesday, JA Ir 11, 2012 9:23 AM To; Poehler, Jeffrey

Subject:

RE: Draft Follow-Up RAI for Core Plate Bolt Analysis (ME6248)

Jeff.

Vermont Yankee wants to have a phone call to discuss your RAI on next Tuesday (1117/12) afternoon. Please let me know whether you can support the phone call.

Thanks Jim Kim From: Poehler, Jeffrey Sent: Wednesday, December 28, 2011 4:32 PM To: Kim, James Cc: Gonzalez, Hipollto

Subject:

Draft Follow-Up RAI for Core Plate Bolt Analysis (ME6248)

Jim, Here is a draft of the follow-up RAI we discussed by phone last week. The RAI is currently in the concurrence process and I expect to be able to get the final to you by 1/5/12.

Maybe it would be prudent to arrange a conference call with the licensee to discuss the draft RAI.

Jeffrey C. Poehler Sr. Materials Engineer NRR/DE/EVIB (301) 415-8353 27