Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24008A2482024-01-0808 January 2024 NAC International, Response to Apparent Violations (a and B) in NRC Inspection Report 72-1031/2023-201; EA-2023-069 ML23283A2382023-12-0707 December 2023 NAC International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 72-1031/2023-201 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23250A3242023-09-12012 September 2023 1. Transmittal Letter Magnastor Issuance of Amendment Nos 11 and 12 and Revision of Amendment Nos 0 Through 9 ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML23074A2522023-03-29029 March 2023 Application for Amendment No. 13 to the Model No. Magnastor Storage Cask Request for Additional Information ML23076A2272023-03-17017 March 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX165 and AMZDFX166 and Vertical Concrete Cask Identification Numbers ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 ML23005A2572023-01-0505 January 2023 Request to Withdraw Administrative Controls for Adverse Weather Events During Operations from Magnastor Amendment 12 Supplement ML22349A4682022-12-19019 December 2022 Amendment No. 10 to Certificate of Compliance No. 1031 for the Magnastor Storage System IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22340A5902022-12-0808 December 2022 Acknowledgement Letter - Magnastor Amendment 13 ML22327A2252022-11-23023 November 2022 NAC International - Magnastor Cask System Users CoC Amendment 12 Supplement and Intent to Adopt Letters ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22321A2682022-11-17017 November 2022 Supplement to the Submission of an Amendment Request for the NAC International Magnastor Cask System, Amendment No. 13 IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 ML22308A1942022-11-0909 November 2022 NAC International, Inc. - U.S. Nuclear Regulatory Commission Report No. 72-1031/2022-201 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22287A0382022-10-13013 October 2022 Supplement to the Submission of an Amendment Request for the NAC International Magnastor Cask System, Amendment No. 13 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22257A2562022-09-14014 September 2022 Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX170 and AMZDFX174 and Vertical Concrete Cask Identification Numbers AMZDNE170 and AMZDNE174 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi 2024-02-02
[Table view] |
Text
Kelvin Henderson DUKE Vice President OENERGY, Nuclear Station atawba 803-701-4251 Duke Energy CNO1VP I 4800 Concord Rd.
York, SC 29745 June 24, 2013 10 CFR 72.212 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
Catawba Nuclear Station, Units 1 and 2 Facility Operating License Numbers NPF-35 and NPF-52 Docket Numbers 50-413 and 50-414 Independent Spent Fuel Storage Installation (ISFSI)
ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Cask Catawba Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model Number MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 2. In accordance with 10 CFR 72.212(bX2), Duke Energy hereby registers the use of Cask Identification Number CN-VCC-74. Loading of this cask was completed and the cask was placed on the ISFSI pad on June 12, 2013.
There are no NRC commitments contained in this letter.
Please direct questions on this matter to L.J. Rudy, Catawba Regulatory Affairs, at (803) 701-3084.
Very truly yours, Kelvin Henderson LJR/s Am~
www.duke-energy.com
Document Control Desk Page 2 June 24, 2013 xc:
V.M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, III, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station J.S. Kim, Project Manager (addressee only)
U.S. Nuclear Regulatory Commission Mail Stop 8 C2 Washington, D.C. 20555 M.D. Waters (addressee only)
U.S. Nuclear Regulatory Commission Mail Stop E3 D2M Washington, D.C. 20555