Category:E-Mail
MONTHYEARML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans 2024-09-10
[Table view] |
Text
WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Thursday, June 27, 2013 1:18 PM To: Hon, Andrew; Epperson, Dan; Quichocho, Jessie; Poole, Justin Cc: Arent, Gordon; Hamill, Carol L; Boyd, Desiree L
Subject:
TVA letter to NRC_06-27-2013_Potential Instrumentation Line Slope Issue -Final Report Attachments: 06-27-2013_Potential Instrumentation Line Slope Issue -Final Report_Final.pdf Please see attached TVA letter that was sent to the NRC today.
Thank You Désireé L. Boyd WBN Unit 2 Licensing EQB 1-B (Trailer NP70) dlboyd@tva.gov 423-365-8764 NOTICE: This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in civil penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have receive this communication in error, please notify me immediately by e-mail and delete the original message.
1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 819 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF474287A1)
Subject:
TVA letter to NRC-_06-27-2013_Potential Instrumentation Line Slope Issue
-Final Report Sent Date: 6/27/2013 1:17:49 PM Received Date: 6/27/2013 1:17:53 PM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 746 6/27/2013 1:17:53 PM 06-27-2013_Potential Instrumentation Line Slope Issue -Final Report_Final.pdf 95587 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received:
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 June 27, 2013 CDR-50-391/2013-02 10 CFR 50.55(e)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - CONSTRUCTION DEFICIENCY REPORT 50-391/2013 INSTRUMENT SENSE LINE SLOPE ISSUE - FINAL REPORT
Reference:
TVA letter to NRC dated April 29, 2013, Watts Bar Nuclear Plant (WBN) Unit 2 -
Construction Deficiency report 50-391/2013 Instrument Sense Line Slope Issue - Interim Report The purpose of this letter is to provide a final report for Construction Deficiency Report (CDR) 391/2013-02 regarding a condition that TVA has identified as a significant (programmatic) breakdown in the instrument sense line installation program and, thus, a significant breakdown in a portion of TVAs quality assurance program. Walkdowns have been completed and have not identified examples where instrument line slopes as installed would have prevented the associated instruments from performing their intended safety function(s).
Therefore, no substantial safety hazards have been identified. Initial notification was made on April 1, 2013, via Event Notification No. 48871.
The apparent cause of this condition involved a misinterpretation of construction procedure 25402-000-GPP-0000-N3401, Instrument and Instrument Line Installation, which lacked proper detail to define the boundary of the sense line from the panel isolation valve to process connection including the root valve. Further details of this condition can be found in the CDR 391/2013-02 provided in the enclosure.
There are no new commitments contained in this letter.
U.S. Nuclear Regulatory Commission Page 3 June 27, 2013 bcc (Enclosure):
Jessie Quichocho U.S. Nuclear Regulatory Commission MS 08G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Fred Brown, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 REGARDING INSTRUMENT SENSE LINE SLOPE CONDITION 10 CFR 50.55(e) CONSTRUCTION DEFICIENCY REPORT (CDR) 50-391/2013-02 FINAL REPORT DESCRIPTION OF DEFICIENCY TVA has identified a condition that was a significant (programmatic) breakdown in the instrument sense line installation program and, thus, a significant breakdown in a portion of TVAs quality assurance program. Specifically, TVA determined that a condition existed where certain portions of the instrument line installations in multiple systems have not been completely inspected to ensure that proper slope requirements (1/4 inch per foot) were met. Inadequate sense line slope could result in the degradation of the associated safety-related instrument due to the effects of air entrapment which could adversely affect the accuracy or time response of the instrument or cause noise.
Walkdowns have been completed for those systems that contained the identified issue.
Inspection results did not identify examples where instrument line slopes as installed would have prevented the associated instruments from performing their intended safety function(s). Therefore, no substantial safety hazards have been identified. Since this condition had the potential to be a significant (programmatic) breakdown in the instrument sense line installation program and, thus, a potential breakdown in TVAs quality assurance program, this condition was conservatively reported previously in accordance with 10 CFR 50.55(e). Initial notification was made on April 1, 2013, via Event Notification No. 48871.
The issues documented in CDR 50-391/2013-02 were captured in TVAs corrective action program as Problem Evaluation Report (PER) 680826.
CAUSE OF THE DEFICIENCY The apparent cause for PER 680826 involved a misinterpretation of construction procedure 25402-000-GPP-0000-N3401, Instrument and Instrument Line Installation.
The construction procedure lacked proper detail to define the boundary of the sense line from the panel isolation valve to the process connection including the root valve.
The standard Engineering Document Construction Release (EDCR) work scope statement for defining the sense line boundary is Sense line connection from the process connection (e.g. root valve) to the panel isolation valve. However, the manner in which construction procedure 25402-000-GPP-0000-N3401 was written could be interpreted to mean that the required slope inspection did not include the root valve.
TVA believes the misinterpretation was a more recent condition rather than a historical one. Early in the project, work was performed by Knowledge, Skill and Rule-based personnel. The Knowledge was developed through design review meetings that were conducted for the EDCRs prior to issuance. These meetings provided the expectations and level of detail needed to resolve the issues related to the Instrument Line corrective action plan through extensive walkdowns involving construction and design personnel.
As the project progressed, the Skill and Rule base traits have remained. However, the Knowledge base has been diminished given the length of time that elapses between the issuance of design packages and the work that takes place to complete their implementation.
E-1
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 REGARDING INSTRUMENT SENSE LINE SLOPE CONDITION 10 CFR 50.55(e) CONSTRUCTION DEFICIENCY REPORT (CDR) 50-391/2013-02 FINAL REPORT SAFETY IMPLICATIONS Walkdowns have been completed for those systems which contained the issue.
Inspection results did not identify examples where instrument line slopes as installed would have prevented the associated instruments from performing their intended safety function(s). Therefore, no substantial safety hazards have been identified.
CORRECTIVE ACTIONS
- 1. Procedure 25402-000-GPP-0000-N3401, Instrument and Instrument Line Installation, has been revised to identify the sense line boundary from the process connection through the root valve to the panel isolation valve.
- 2. Training to the above revised procedure has been provided to applicable Field Engineers, Planners, and Design personnel to eliminate any Knowledge gap.
- 3. The standard statement in the EDCRs discussed above has been removed from each EDCR through approved procedures for revising EDCRs.
- 4. TVA has revalidated instrument line slopes for the affected systems and has subsequently prepared and processed Field Change Requests to document changes requiring correction found during these walkdowns. None of these changes would have resulted in a substantial safety hazard had they remained uncorrected. For the remaining systems yet to be completed, TVA has corrected the program as described above to complete those systems as intended from this time forward.
E-2