ML13190A331

From kanterella
Jump to navigation Jump to search
License Renewal Application Review
ML13190A331
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/09/2013
From: Melanie Wong
Division of License Renewal
To: Haaker A
State of IL, Historic Preservation Agency
Melanie Wong 301-415-2432
References
Download: ML13190A331 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2013 Ms. Anne E. Haaker Deputy State Historic Preservation Officer Preservation Services Division Illinois Historic Preservation Agency 1 Old State Capitol Plaza Springfield, Illinois 62701-1507 SU B..I ECT:

BYRON STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Ms. Haaker:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Bryron Station, Units 1 and 2 (Byron). Byron is located in Ogle County, Illinois, approximately 145 miles northwest of Chicago, and 27 mile southwest of Rockford, Illinois. Please find a 50-mile site area map, a 6-mile site area map, and a site map of Byron enclosed. Byron is operated by Exelon Generation Company, LLC (Exelon). The application for renewal was submitted by Exelon in a letter dated May 29,2013, pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54). Under NRC regulations, the original operating license for a nuclear power plant is issued for up to 40 years, and the license may be renewed for up to 20 years.

The NRC has established that, as part of the staffs review of any nuclear power plant license renewal application, a site-specific Supplemental Environmental Impact Statement (SEIS) to its "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," NUREG 1437, will be prepared under 10 CFR Part 51, the NRC's regulation that implements the National Environment Policy Act of 1969, as amended (NEPA). Through this letter, the NRC is initiating consultation under Section 106 of the National Historic Preservation Act (NHPA) with the Illinois Historic Preservation Agency. In accordance with 36 CFR 800.8(c), the NRC will comply with the obligations required under Section 106 of the NHPA through its NEPA process.

The final SEIS will include analyses of pertinent environmental issues, and in accordance with 36 CFR 800.8(c), analyses of potential impact to historic properties and other cultural resources.

In the context of NHPA, NRC staff has determined that the area of potential effects (APE) for a license renewal action IS the area at the power plant site and its immediate environs that may be impacted by post-license renewal land-disturbing operations or prOjected refurbishment activities associated with the proposed action. The APE may extend beyond the immediate environs in those instances where post-license renewal land-disturbing operations or projected refurbishment activities specifically related to license renewal may potentially have an effect on known or proposed historic sites. This determination is made irrespective of ownership or control of the lands of interest.

A. Haaker

- 2 Please submit any comments that you may have on the scope of the environmental review by September 27,2013. Written comments should be submitted by mail to:

Chief, Rules, Announcements, and Directives Branch Division of Administrative Services Office of Administration Mailstop 3WFN - 06A44MP U.S. Nuclear Regulatory Commission Washington, DC 20555 Electronic comments may be submitted to the NRC by accessing www.regulations.gov and searching for docket 10 NRC-2013-0169.

The Byron license renewal application is available at:

http://www.nrc.gov/reactors/operatingllicensing/renewallapplications/byron-braidwood.html The NRC plans to hold two public environmental scoping meetings on August 20, 2013, at Byron Forest Preserve District, 7993 N River Rd., Byron, Illinois 61010. The first meeting will convene at 2:00 p.m. and will continue until 4:00 p.m., as necessary; the second meeting will convene at 6:00 p.m. and will continue until 8:00 p.m., as necessary. The NRC expects to publish the draft SEIS on February 10, 2014. A copy of the document will be sent to you for your review and comment. After consideration of public comments received, the NRC will prepare a final SEIS, which is scheduled to be issued on September 30,2014.

If you have any questions concerning the NRC's review of this license renewal application, please contact Emily Larson, social scientist, at 301-415-1151 or bye-mail at Emily.Larson@nrc.gov.

Sincerely,

. ~

~,~

Melanie C. Wong, Chief ~

Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-454 and 50-455

Enclosures:

As stated cc: Listserv

ML13190A331 OFFICE LA:DLR:RPB2*

PM:DLR:RPB2 RERB Technical Staff Member BC:DLR:RERB NAME YEdmonds LJames ELarson MWong For W. Ford DATE 7/11/13 8/9/13 8/8/13 8/9/13

Letter to A. Haaker from M. Wong date August 9, 2013 SLlBJECT:

BYRON NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW HARD COPY:

DLRRF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRsrg Resource VMitlyng, Rill PChandrathil, Rill ABarker, Rill HLogaras, Rill EDuncan, Rill RNg, Rill TDaun, Rill BBoston, Rill JMcGhee, Rill JRobbins, Rill TRay, Rill W(Billy) Dickson, Rill SBurnell, OPA DMclntyre, OPA MYough,OGC AGhosh,OGC CEngland, OGC JWiebe, NRR MMahoney, NRR JBowen, NRR