July 3, 2013
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT - NOTIFICATION OF NRC RETAKE OPERATOR
LICENSING EXAMINATION 05000483/2013302
Dear Mr. Heflin:
In a telephone conversation on July 3, 2013, between Mr. R. Morgan, Exam Group Leader,
and Mr. K. Clayton, Chief Examiner, arrangements were made for the administration of a retake
licensing examination at Callaway Plant during the week of August 26, 2013.
As agreed during the telephone conversation, your staff will prepare the retake examination
(Administrative Job Performance Measures only for one instant senior reactor operator
applicant) based on the guidelines in NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and
Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs
regional office will discuss with your staff any changes that might be necessary before the
examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by July 12, 2013. The Administrative Job Performance Measures (JPMs) portion of the
operating test and supporting reference materials identified in Attachment 3 to ES-201 will be
due by August 5, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal
Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall
approve the outlines and operating test JPMs before they are submitted to the NRC for review
and approval. All materials shall be complete and ready to use. We request that any personal,
proprietary, sensitive unclassified, or safeguards information in your response be contained in a
separate enclosure and appropriately marked. Any delay in receiving the required operating
tests and the associated reference materials, or the submittal of inadequate or incomplete
materials, may cause the examination to be rescheduled. In addition, your support for on-site
validation of the examination is required during the week of August 26, 2013.
In order to conduct the requested examination, it will be necessary for your staff to provide
adequate space and accommodations in accordance with ES-402. Appendix E to
NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while
the operating test is being administered.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
A. Heflin
- 2 -
To permit timely NRC review and evaluation, your staff should submit the preliminary
senior operator license application (Office of Management and Budget (OMB) approval
number 3150-0090), medical certification (OMB approval number 3150-0024), and associated
waiver requests (OMB approval number 3150-0090) on August 5, 2013. The signed application
certifying that all training (both initial and remedial) has been completed should be submitted by
August 19, 2013. If the final applications are not received by this date, a postponement may be
necessary.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Morgan has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself at 817-200-
1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-483
License: NPF-30
cc: Electronic Distribution for Callaway Plant
ADAMS: No Yes
SUNSI Review Complete
Reviewer Initials: KDC
Publicly Available
Non-Sensitive
Non-publicly Available
Sensitive
SOE: DRS/OB
C:DRS/OB
KDC
VGG
/RA/
/RA/
07/3/13
07/3/13