ML13189A321

From kanterella
Jump to navigation Jump to search
Notification of NRC Retake Operator Licensing Examination 05000483/13-302
ML13189A321
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/03/2013
From: Vincent Gaddy
Division of Reactor Safety IV
To: Heflin A
Union Electric Co
References
50-483/13-302
Download: ML13189A321 (3)


See also: IR 05000483/2013302

Text

July 3, 2013

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT - NOTIFICATION OF NRC RETAKE OPERATOR

LICENSING EXAMINATION 05000483/2013302

Dear Mr. Heflin:

In a telephone conversation on July 3, 2013, between Mr. R. Morgan, Exam Group Leader,

and Mr. K. Clayton, Chief Examiner, arrangements were made for the administration of a retake

licensing examination at Callaway Plant during the week of August 26, 2013.

As agreed during the telephone conversation, your staff will prepare the retake examination

(Administrative Job Performance Measures only for one instant senior reactor operator

applicant) based on the guidelines in NUREG-1021, Operator Licensing Examination

Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and

Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs

regional office will discuss with your staff any changes that might be necessary before the

examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by July 12, 2013. The Administrative Job Performance Measures (JPMs) portion of the

operating test and supporting reference materials identified in Attachment 3 to ES-201 will be

due by August 5, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal

Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall

approve the outlines and operating test JPMs before they are submitted to the NRC for review

and approval. All materials shall be complete and ready to use. We request that any personal,

proprietary, sensitive unclassified, or safeguards information in your response be contained in a

separate enclosure and appropriately marked. Any delay in receiving the required operating

tests and the associated reference materials, or the submittal of inadequate or incomplete

materials, may cause the examination to be rescheduled. In addition, your support for on-site

validation of the examination is required during the week of August 26, 2013.

In order to conduct the requested examination, it will be necessary for your staff to provide

adequate space and accommodations in accordance with ES-402. Appendix E to

NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while

the operating test is being administered.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

A. Heflin

- 2 -

To permit timely NRC review and evaluation, your staff should submit the preliminary

senior operator license application (Office of Management and Budget (OMB) approval

number 3150-0090), medical certification (OMB approval number 3150-0024), and associated

waiver requests (OMB approval number 3150-0090) on August 5, 2013. The signed application

certifying that all training (both initial and remedial) has been completed should be submitted by

August 19, 2013. If the final applications are not received by this date, a postponement may be

necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Morgan has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself at 817-200-

1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

cc: Electronic Distribution for Callaway Plant

ML13189A321

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: KDC

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

SOE: DRS/OB

C:DRS/OB

KDC

VGG

/RA/

/RA/

07/3/13

07/3/13