ML13176A386

From kanterella
Jump to navigation Jump to search
Security Inspection Public Report 2013403 Rev 1
ML13176A386
Person / Time
Site: Robinson 
(DPR-023)
Issue date: 06/25/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: William Gideon
Progress Energy Co
Linda K. Gruhler 404-997-4633
References
Download: ML13176A386 (4)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s),

this transmittal document is decontrolled LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION June 25, 2013 Mr. William R. Gideon Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2013403

Dear Mr. Gideon:

On June 6, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H. B. Robinson Nuclear Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results that were discussed with Mr. R. M. Glover and other members of your staff.

This inspection examined activities conducted under your license as they relate to security, and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during the inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the Enclosure, and in accordance with 10 CFR 2.390, a copy of this letters Enclosure will not be available for public inspection.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION W. Gideon 2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy A. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-261 License No. DPR-23

Enclosure:

Inspection Report 05000261/2013403 w/Attachment Supp. Info. (OUO) cc: (See page 3

ML13176A386 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/DRP SIGNATURE AXR2 RLP5 via e-mail JCS3 via e-mail BBD JSD for GTH1 NAME A. Richardson R. Patterson J. Shehee B. Desai G. Hopper DATE 6/ 18 /2013 6/ 18 /2013 6/ 24 /2013 6/ 21 /2013 6/ 21 /2013 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION W. Gideon 3

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION cc:

Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550 Richard Hightower, Supervisor Licensing/Regulatory Programs Progress Energy H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 William R. Gideon, Vice President H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550 Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550 Joseph W. Donahue Vice President Nuclear Oversight Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601 Edward T. O'Neil, Director Nuclear Protective Serv and Emergency Preparedness Progress Energy TPP-15 3581 West Entrance Rd.

Hartsville, SC 29550 Progress Energy 3581 West Entrance Rd.

Hartsville, SC 29550