ML13176A069

From kanterella
Jump to navigation Jump to search
Response to NRC Notice of Violation and NRC Inspection Report 05000528/2013002, 05000529/2013002, 05000530/2013002
ML13176A069
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/24/2013
From: Allen D
NRC/RGN-IV/DRP/RPB-E
To: Edington R
Arizona Public Service Co
Allen D
References
EA-13-024 IR-13-002
Download: ML13176A069 (2)


See also: IR 05000528/2013002

Text

June 24, 2013

EA-13-024

Randall K. Edington,

Executive Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT:

RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000528/2013002, 05000529/2013002, 05000530/2013002

Dear Mr. Edington:

On May 14, 2013, the NRC cited Palo Verde Nuclear Generating Station Units 1, 2, and 3 for

failure to periodically update the Updated Final Safety Analysis Report associated with the

Liquid Radwaste System and Old Steam Generator Storage Facility as required by 10 CFR

50.71(e). The Notice of Violation enclosed with Inspection Report 05000528/2013002,

05000529/2013002, and 05000530/2013002 (ML13134A352), required you to respond in writing

within 30 days. You responded by letter dated June 13, 2013 (ML13169A254).

After reviewing the information you provided in your response to the Notice, we have concluded

that your completed and proposed actions appear to adequately address the regulatory

noncompliance described in the Notice of Violation. We will review your implementation of

these corrective actions during a future inspection to determine whether full compliance has

been restored and whether compliance will be maintained.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Don Allen, Chief

Project Branch E

Division of Reactor Projects

Docket Nos.: 50-528; 50-529; 50-530

License Nos.: NPF-41; NPF-51; NPF-74

U N IT E D S TA TE S

NUC LEAR RE GULATOR Y C OM MI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 76011- 4511

R. Edington

-2-

Electronic distribution by RIV:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Tony.Brown@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

Administrative Assistant (Revonna.Stuart@nrc.gov)

Branch Chief, DRP/E (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Project Engineer, DRP/E (Dan.Bradley@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)

R:Reactors\\_PV\\2013\\PV Ack Response to NOV EA-13-024.docx

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: DA

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

C:DRS/PSB2

ORA/ACES

C:DRP/PBE

JDrake

RBrowder

DAllen

/RA/

/RA/

/RA/

6/24/13

6/24/13

6/24/13

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax