ML13176A004
| ML13176A004 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 06/24/2013 |
| From: | Siva Lingam Plant Licensing Branch II |
| To: | Frehafer K Florida Power & Light Co |
| References | |
| TAC MF1888, TAC MF1889 | |
| Download: ML13176A004 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Lingam, Siva Sent:
Monday, June 24, 2013 1:21 PM To:
Frehafer, Ken (Ken.Frehafer@fpl.com)
Cc:
Quichocho, Jessie; Rodriguez, Rafael; Huang, Tai; Grover, Ravinder; Katzman, Eric (Eric.Katzman@fpl.com)
Subject:
St. Lucie 1 and 2 LAR Acceptance Review - Modify Moderator Temperature Coefficient Surveillance Requirements per TSTF-486, Rev. 2 (TAC Nos. MF1888 and MF1889)
By letter dated May 21, 2013, Florida Power and Light Company submitted a license amendment request for St. Lucie Plant Units 1 and 2. The license amendment proposes to modify the Technical Specifications moderator temperature coefficient surveillance requirements associated with the implementation of WCAP-16011-P-A, Startup Test Activity Reduction (STAR) Program. The changes are consistent with the Nuclear Regulatory Commission (NRC)-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change TSTF-486, Revision 2 as included in NUREG-1432, Revision 4.0, Standard Technical Specifications - Combustion Engineering Plants. The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant St. Lucie Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
728 Mail Envelope Properties (Siva.Lingam@nrc.gov20130624132000)
Subject:
St. Lucie 1 and 2 LAR Acceptance Review - Modify Moderator Temperature Coefficient Surveillance Requirements per TSTF-486, Rev. 2 (TAC Nos. MF1888 and MF1889)
Sent Date:
6/24/2013 1:20:45 PM Received Date:
6/24/2013 1:20:00 PM From:
Lingam, Siva Created By:
Siva.Lingam@nrc.gov Recipients:
"Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Rodriguez, Rafael" <Rafael.Rodriguez@nrc.gov>
Tracking Status: None "Huang, Tai" <Tai.Huang@nrc.gov>
Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>
Tracking Status: None "Katzman, Eric (Eric.Katzman@fpl.com)" <Eric.Katzman@fpl.com>
Tracking Status: None "Frehafer, Ken (Ken.Frehafer@fpl.com)" <Ken.Frehafer@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2315 6/24/2013 1:20:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: