Apr 30, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Robert Frcek 961 Amherst Ave Los Angeles, CA 90049-5801
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
John Ishvaradas Abdallah PO Box 6175 San Pedro, CA 90734-6175
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Brian Dowling 15320 Casino Dr Hacienda Heights, CA 91745-6172
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Richard Ramirez 118 N Annin Ave Fullerton, CA 92831-4006
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Phaedra Cheydleur 15 Paloma Ave
- Venice, CA 90291-8711
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Alison Pitale 20702 El Toro Rd Apt 299 Lake Forest, CA 92630-6126
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Theodore Snyder 12726 Daryl Ave Granada Hills, CA 91344-1062
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Sandrine Marten 4104 Magna Carta Rd Calabasas, CA 91302-5723
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Glenn Britton 1915 W 43rd St Los Angeles, CA 90062-1450
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Pamela Bunning 3831 Clayton Ave Los Angeles, CA 90027-4719
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Ofiofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Angeles Chapter CA 91748-3344
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Rhonda Weir 18819 Towne Ave Carson, CA 90746-2162
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Nanette Johns PO Box 1670
- Topanga, CA 90290-1670
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
David Moorman 8111 Pennington Dr Huntington Beach, CA 92646-6737
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and operý review process.
Thank you for your attention to these concerns.
Jim Belsley 3993 Black Bird Way Calabasas, CA 91302-1883
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Diane Villard 32371 Alipaz St San Juan Capistrano, CA 92675-4122
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Carol Peterson 711 Diamond St Redondo Beach, CA 90277-2911
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Jena Ardell 5455 Zelzah Ave
- Encino, CA 91316-2272
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Noel Park 6715 El Rodeo Rd Rancho Palos Verdes, CA 90275-4603
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Bella Seppell PO Box 453 Los Anqeles, CA 90078-0453
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Natalie Epstein 3348 James M Wood Blvd Apt 5 Los Angeles, CA 90006-1224
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review Of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns, Tippi and Neal Dobrofsky Santa Monica, Ca 90403 Thank you for your attention to these concerns.
Tippi Dobrofsky
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Eric Von Brink 108 W 2nd St Los Angeles, CA 90012-1586
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on -the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
James Odling 5170 0 Sullivan Dr Los Angeles, CA 90032-4051
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Clara Levy 1037 S Shenandoah St Los Angeles, CA 90035-2114
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Maxane Goldstein City Industry, CA 91745
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Bey Kelly, Ph.D.
248 La Verne Ave Long Beach, CA 90803-3515
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Amanda Smith 831 1/2 Kodak Dr Los Angeles, CA 90026-6618
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
James Hamilton 2412 Palos Verdes Dr W Apt B Palos Verdes Estates, CA 90274-2768
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Dan Beard 16804 Sausalito Dr Whittier, CA 90603-1746
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Robert Burk 611 Woodruff Ave Los Angeles, CA 90024-2544
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
G Hauser 1382 Chamberlain Rd
- Pasadena, CA 91103-2310
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Curtis Hedges 501 Morris Pl Montebello, CA 90640-2337
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Jeff Lambeth CA
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Leopoldo Arguello 2243 S Towner St Santa Ana, CA 92707-3141
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Valerie Gaster 7952 W 79th St Playa Del Rey, CA 90293-7958
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Linda Joeth 420 Mendoza Ter Corona Del Mar, CA 92625-2611
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Sandi Miller 1346 E Chestnut Ave
- Oranqe, CA 92867-3837
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Stephanie Larro 5230 Weller Dr Woodland Hills, CA 91367-6048
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Carl Mellinger PO Box 1135 Pacific Palisades, CA 90272-1135
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Jayne Sutton 900 E Harrison Ave Apt C15
- Pomona, CA 91767-2087
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Blythe Wheaton 2888 Bernard Ct Laguna Beach, CA 92651-2076
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Dale Evilsizer 42424 62nd St W Quartz Hill, CA 93536-4522
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Carol Locatell 4153 Woodman Ave Sherman Oaks, CA 91423-4331
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Gale Goldsberry 22772 Bayfront Ln Lake Forest, CA 92630-3004
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Alison Lakoff CA
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Brenda Howell 1638 Avenida Selva Fullerton, CA 92833-1533
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Karen Rocchio 607 N Harper Ave Los Angeles, CA 90048-2224
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive.water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Hildy Meyers 201 20th St Huntington Beach, CA 92648-3913
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Pladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Wesley. Keebler 15442 La Maida St Sherman Oaks, CA 91403-1043
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Jason Cara 340 S Lemon Ave
- Walnut, CA 91789-2706
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Ute Watson 2322 Calle Adriana San Dimas, CA 91773-3982
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
They have been saying for years that plant is safe that turned out to be untrue they have an agenda...
done open it early please..Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Rachel Matteson 4246 Rutgers Ave Long Beach, CA 90808-1628
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Zav Hershfield Santa Cruz, CA 95062
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the'San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Gregory Alper 707 Jacon Way Pacific Palisades, CA 90272-2830
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which-could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Tracey Arnold 4235 Pickney Dr Calabasas, CA 91302-4819
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Christine Sirias 318 La France Ave Apt B
- Alhambra, CA 91801-6555
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Irene Kraus 26531 Baronet Mission Viejo, CA 92692-4100
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Jeff Lovell 1215 E 4th St Long Beach, CA 90802-7518
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555%0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
D. Lancon
- Tujunga, CA 91042-2849
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Oscar Banda 25132 Oceanknoll Dana Point, CA 92629-2669
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Michael Rha 1942 Euclid St Santa Monica, CA 90404-4652
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Megan Rice 21516 Encina Rd
- Topanga, CA 90290-3522
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
D Phew Hilgard Ave Los Angeles, CA 90095-1301
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comrients that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation' of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Joe Wolcott 3127 Belden Dr Hollywood, CA 90068-1947
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San. Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Dianne Sax 826 Commonwealth Ave
- Venice, CA 90291-2806
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Elizabeth Duncan 1400 California Ave Apt 307 Santa Monica, CA 90403-4396
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Sullivan Carter 13168 Boca De Canon Ln Los Angeles, CA 90049-2220
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power, plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
As I live close to the San Onofre plant I have been anxious and worried about any restart.
It should be closed permanently. Please consider my request for a permanent shutdown.
Thank you for your attention to these concerns.
Elizabeth Rudrigues 1211 Avenida Buena Suerte San Clemente, CA 92672-2349
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Stephen Blake 8122 Munster Dr Huntington Beach, CA 92646-5025
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Kelly Ireland 6566 De Longpre Ave Los Angeles, CA 90028-7803
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Thomas Drescher 443 N Harper Ave Los Angeles, CA 90048-2220
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
We had the hottest and longest record of temperatures over 100 degrees last summer and we DID NOT NEED the SONGS reactor.
Conservation works in California.
There is no need to risk the public with a company that cannot be trusted to conduct themselves honestly.
It would only take 1 accident to destroy most of Southern California.
I don't need to remind you that California (particularly the southern part) is one of the biggest economies in the world.
Any kind of accident at SONGS could cripple the US and world economies instantly.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at SONGS before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed SONGS generators at this time, and to conduct a comprehensive and open review process.
I would even go beyond the Sierra Club and say we should decommission the plant.
It is close to its life expectancy and not worth the risk.
This is especially true considering the track record of SCE.
Thank you for your attention to these concerns.
Chris Felicijan 18902 E Appletree Ln
- Orange, CA 92869-3030
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Virginia Krasney 1317 Peppertree Cir West Covina, CA 91792-1465
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Mary J 9931 Newcastle Ln Cypress, CA 90630-3631
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant Are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Gary Van Zandt 1704 Haynes Ln Redondo Beach, CA 90278-4721
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Kyle Mccauley 1512 Berkeley St Apt C Santa Monica, CA 90404-3258
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Manford Samuelsen 1050 W 10th St San Pedro, CA 90731-3517
May 1, 2013 Ms Cindy Bladey U.S. Nuclear. Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Timothy Hanson 223 Strand St Apt F Santa Monica, CA 90405-3428
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Irma & Eugene Strantz 1930 Homewood Dr
- Altadena, CA 91001-2840
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Vincent De Stefano 580 N Sierra Madre Blvd
- Pasadena, CA 91107-2727
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.WHY WOULD YOU EVEN TAKE A RISK????????
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive.....
and it must be COMPREHENSIVE...
and OPEN review process.
Thank you for your attention to these concerns.
Betty Murphy 35 Linden Ave Apt 310 Long Beach, CA 90802-5059
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Mary Ellen Digiacomo 1249 N Holliston Ave
- Pasadena, CA 91104-3019
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Maureen Toth 11206 Laurie Dr Studio City, CA 91604-3877
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Anne Kelly 1101 W Macarthur Blvd Unit 170 Santa Aria, CA 92707-4517
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
John Chatsworth 8300 Outland View Dr Sun Valley, CA 91352-3615
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Kathy Mesch 12 Via Destino San Clemente, CA 92673-7013
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of.the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Susan Mclaughlin 86 Carriage Dr Foothill Ranch, CA 92610-2429
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Elias R Torres 618.
1/2 N Garfield Ave Montebello, CA 90640-1639
May 1, 2013 Ms Cindy Bladey U.S.
Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Ron Weinberg 14445 San Feliciano Dr La Mirada, CA 90638-4341
May 1, 2013 Ms Cindy Bladey U.S.
Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Orson Rheinfurth 4542 Katherine Ave Sherman Oaks, CA 91423-2709
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Julio Otto & Lucia Madrigal 11001 Garden Dr Garden Grove, CA 92840-1033
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Linda Lapetino 3271 Sawtelle Blvd Apt 107 Los Angeles, CA 90066-2411
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Gonzalo Villalobos 1826 Cerritos Ave Apt B Long Beach, CA 90806-5151
J.
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Darren Swift 6266 Westminster Blvd Westminster, CA 92683-3524
May 1, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Hayim and Joy Zadaca 203 W Stewart Way Long Beach, CA 90807-1927
May 2, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Roy Mims 317 South Grand Ave.
Los Angeles, CA 90007
May 2, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works
,Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Ashley Trigg 343 N Avenue 53 Los Angeles, CA 90042-3305
May 2, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S. Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Nicolas Carr 11539 Laurelcrest Dr Studio City, CA 91604-3875
May 3, 2013 Ms Cindy Bladey U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Ms Bladey,
The comments that follow are regarding Docket ID NRC20130070.
We ask that the Nuclear Regulatory Commission (NRC) take no action that could lead to a restart of the San Onofre nuclear power plant before the Commission completes a comprehensive investigation and provides full opportunity for public participation and independent expert testimony.
Southern California Edison (SCE) is attempting to shortcut the license review process by calling on the NRC to make a fast-track restart decision. We and other environmental groups have joined with U.S.
Senator Boxer and U.S.
Representative Markey in urging the NRC not to follow such a course.
We were deeply disturbed when on April 10 the NRC staff disregarded numerous statements of concern and announced a "preliminary finding" that a San Onofre restart at 70% power posed no significant safety risk.
We join a wide range of concerned citizens and public officials in believing that a full and transparent review of the failed San Onofre generators is essential before the NRC considers any potential restart at either partial or full power of the failed generator.
We support Senator Boxer, Chair of the Environment and Public Works Committee, who stated on April 10, 2013: "The NRC staff
- proposal, which could pave the way for the restart of the San Onofre nuclear power plant before the investigations of the crippled plant are completed, is dangerous and premature."
Given the recent failure of tubes that carry radioactive water, speeding restart of San Onofre through a so-called "license amendment" that shortcuts procedures is totally inappropriate.
SCE's request to weaken its license requirements was made despite evidence showing that there could be a significant hazard from the operation of the deficient steam generators.
Given the troubled history and current condition of the plant and the raised level of public concern, the public deserves a full review by the NRC of conditions at San Onofre before it considers a restart of either failed generator.
I support the call by the Sierra Club for the NRC to block any restart of the failed San Onofre generators at this time, and to conduct a comprehensive and open review process.
Thank you for your attention to these concerns.
Brandon Boutros 28221 Stanley Ct Canyon Cntry, CA 91351-3818