ML13168A417

From kanterella
Jump to navigation Jump to search
Cover Letter - PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16
ML13168A417
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/12/2013
From: Lacal M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
102-06714-MLL/TNW/DFH
Download: ML13168A417 (2)


Text

ENCLOSURE(S) CONTAIN(S) 10 CFR 50.54(p)

SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED MARIA L. LACAL Qaps Vice President, Office Support Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072 102-06714-MLL/TNW/DFH Tel 623 393 6491 June 12, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and 72-44 License No. NPF-41; NPF-51; NPF-74 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16

Dear Sirs:

Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 16 of the PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (hereafter the Plan). This revision incorporates changes made to PVNGS's security owner controlled personnel access entry point, the site drawing and the terminology used identifying certain armed security officers.

APS has evaluated the Plan changes in accordance with 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in the effectiveness of the Plan.

No commitments are being made to the NRC by this letter.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Charles Coles, Department Leader, Security Operations at 623-393-5947.

  • ince rely,

%L6TNW/DFH A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak - Diablo Canyon e Palo Verde

  • San Onofre
  • Wolf Creek ENCLOSURE(S) CONTAIN(S)

SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

ENCLOSURE(S) CONTAIN(S)

SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 102-06714-MLL/TNW/DFH June 12, 2013 U.S. Nuclear Regulatory Commission PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 Page 2

Enclosures:

1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16
2) 10 CFR 50.54(p) Table of Changes cc: (cover letter only)

A. T. Howell III. NRC Region IV Regional Administrator J. K. Rankin NRC NRR Project Manager [electronic / paper]

M. L. Chambers Sr. Physical Security Inspector, RIV/DRS/PSB M. A. Brown NRC Senior Resident Inspector for PVNGS ENCLOSURE(S) CONTAIN(S)

SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED