ML13164A129

From kanterella
Jump to navigation Jump to search
OL - TVA Letter to Nrc_System 33 Completion Letter
ML13164A129
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/02/2013
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML13164A129 (5)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Thursday, May 02, 2013 1:37 PM To:

Hon, Andrew; Epperson, Dan; Quichocho, Jessie; Poole, Justin Cc:

Arent, Gordon; Hamill, Carol L; Boyd, Desiree L

Subject:

TVA letter to NRC_System 33 Completion Letter Attachments:

05-02-2013_System 33 Completion Letter_Final.pdf Please see attached TVA letter that was sent to the NRC today.

Thank You

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 NOTICE: This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in civil penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have receive this communication in error, please notify me immediately by e-mail and delete the original message.

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

809 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF42283A52)

Subject:

TVA letter to NRC_System 33 Completion Letter Sent Date:

5/2/2013 1:37:01 PM Received Date:

5/2/2013 1:37:19 PM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 754 5/2/2013 1:37:19 PM 05-02-2013_System 33 Completion Letter_Final.pdf 85494 Options Priority:

Standard Return Notification:

No Reply Requested:

Yes Sensitivity:

Normal Expiration Date:

Recipients Received:

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 May 2, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) UNIT 2, SERVICE AIR SYSTEM (SYSTEM 033) TRANSITION FROM ASME SECTION III TO ASME SECTION XI This letter provides notification that all ASME Section III work has been completed for WBN Unit 2 Service Air System (System 033). The ASME Section III Final N-5 Code Data Report has been signed by the N-Certificate Holder Having Overall Responsibility (Bechtel Power Corporation), and the ASME nameplates have been stamped and attached to the piping. From this point until the ASME N-3 Code Data Report is signed for the overall plant, in accordance with ASME Code Interpretation III-1-83-61, the ASME portions of the system will be maintained under the provisions of ASME Section XI.

The WBN Unit 2 ASME Section XI Repair and Replacement (R&R) activities will be controlled under WBN Unit 2 procedure NC PP-15, ASME Section XI and OM Code. The activities will meet the ASME Section XI requirements of NPG-SPP-09.1, ASME Code and Augmented Programs, Part D (Attachment 4); TI-100.014, ASME Section XI Repairs and Replacements; TI-100.010, System Pressure Testing; and MMDP-10, Controlling Welding, Brazing, and Soldering Processes. ASME Section XI R&R activities performed prior to Unit 2 licensing shall be performed to the current WBN Unit 1 Section XI Code of Record (i.e., 2001 Edition through 2003 addenda). The ASME Section XI work will be planned in accordance with WBN Unit 2 procedure NC PP-36, Nuclear Construction Work Control.

TVA will notify the Lead Authorized Nuclear Inservice Inspector and the Nuclear Regulatory Commission Unit 2 Senior Resident Inspector prior to performing Unit 2 ASME Section XI R&R work.

U.S. Nuclear Regulatory Commission Page 3 May 2, 2013 bcc: Jessie Quichocho U.S. Nuclear Regulatory Commission MS 08G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Fred Brown, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257