June 12, 2013
Oscar A. Limpias
Vice President - Nuclear and Chief
Nuclear Officer
Cooper Nuclear Station
P.O. Box 98
Brownville, NE 68321-0098
SUBJECT:
RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION
REPORT 0500298/2013009
Dear Mr. Limpias:
On May 9, 2013, the NRC cited Nebraska Public Power District for Cooper Nuclear Stations
failure to correctly translate design basis requirements associated with the standby liquid control
system test tank into plant procedures as required by 10 CFR 50, Appendix B, Criterion III,
Design Control. The Notice of Violation, enclosed with Inspection Report 05000298/2013009
(ML13130A037), required you to respond in writing within 30 days. You responded by letter
dated June 6, 2013 (ML13162A400).
After reviewing the information you provided in your response to the Notice, we have concluded
that your completed and proposed actions appear to adequately address the regulatory
noncompliance described in the Notice of Violation. We will review your implementation of
these corrective actions during a future inspection to determine whether full compliance has
been restored and whether compliance will be maintained.
Sincerely,
/RA/
Ray L. Kellar, P.E., Chief
Technical Support Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
cc: Electronic Distribution
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
June 12, 2013
Oscar A. Limpias
Vice President - Nuclear and Chief
Nuclear Officer
Cooper Nuclear Station
P.O. Box 98
Brownville, NE 68321-0098
SUBJECT:
RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION
REPORT 0500298/2013009
Dear Mr. Limpias:
On May 9, 2013, the NRC cited Nebraska Public Power District for Cooper Nuclear Stations
failure to correctly translate design basis requirements associated with the standby liquid control
system test tank into plant procedures as required by 10 CFR 50, Appendix B, Criterion III,
Design Control. The Notice of Violation, enclosed with Inspection Report 05000298/2013009
(ML13130A037), required you to respond in writing within 30 days. You responded by letter
dated June 6, 2013 (ML13162A400).
After reviewing the information you provided in your response to the Notice, we have concluded
that your completed and proposed actions appear to adequately address the regulatory
noncompliance described in the Notice of Violation. We will review your implementation of
these corrective actions during a future inspection to determine whether full compliance has
been restored and whether compliance will be maintained.
Sincerely,
Ray L. Kellar, P.E., Chief
Technical Support Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
cc: Electronic Distribution
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
S:\\DRS\\REPORTS\\Reports Drafts\\CNS 2013009 Acknowledgement of NOV response.docx ML13163A200
SUNSI Rev Compl.
Yes No
Yes No
Reviewer Initials
EAR
Publicly Avail.
Yes No
Sensitive
Yes No
Sens. Type Initials
EAR
DRS/TSB
C:DRS/TSB
EARuesch
RLKellar
/RA/
/RA/
6/12/2013
6/12/13
OFFICIAL RECORD COPY