Text

2013 BRAIDWOOD STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BRAIDWOOD STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Braidwood Station for December 2014.

In response, we have scheduled an initial licensing examination for the weeks of January 5 and 12, 2015, at the Braidwood Station. On-site validation of this examination is tentatively scheduled to occur December 15, 2014. We note that you were previously scheduled for an initial operator licensing exam the weeks of March 25 and April 1, 2013.

These dates have not changed. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ

M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via ListServ DISTRIBUTION:

RidsNrrDoriLpl3-2 Resource Daniel Merzke RidsNrrPMBraidwood Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRS III Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak DOCUMENT NAME: R:\LTRS TO LICENSEES\EXELON\BRAI\BRAI 2011\BRA 060111 DRS OL.DOCX D Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a copy of this document, indicate in the box: *c* =Copy without attachmenVenclosure "E" =Copy with attach menUenclosure "N" =No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DATE 05/13/2011 06/01/2011 OFFICIAL RECORD COPY

Kweiser, Janet From: Olteanu, Carmen Sent: Monday, June 13,2011 3:19PM To: RidsNrrDorllpl3-2 Resource; Merzke, Daniel; RidsNrrPMBraidwood Resource; RidsNrrDirslrib Resource; Pederson, Cynthia; Orth, Steven; Heck, Jared; Barker, Allan; DRPIII; DRSIII; Ariana, Carole; Linn, Linda; Buckley, Patricia; Tomczak, Tammy

Subject:

Braidwood Letter ReConfirmation of Initial Operator License Examinations Attachments: BRA 060111 DRS OL.docx The subject document has been completed and has been submitted to DPC to be declared in ADAMS. A Word copy of the document has. been attached and the document has been assigned Accession

  1. ML11158A157.

1

www.exeloncorp.com Exelon Exelon Generation 4300 Winfield Road Nuclear Warrenville, IL 60555 RS-10-130 July 28, 2010 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-27&

Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

y. t *c., z, tt c.*~ c..*-

AUG 2- 2010

July 28, 2010 U.S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations," dated June 28, 2010 The referenced Regulatory Issue Summary (RIS} requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630} 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station -Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0- Completed NRC Form 536 for Three Mile Island Nuclear Station- Unit 1

Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-:Z008)

Estimated burden per res~onse to comply w1th this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments rfrdln~ burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or bY. Internet e-mail to in ocollects@nrc8ov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or seonsor, and a person is not required to respond to, the information collect on.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 D A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR 0 8 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 12 6 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 4/8/2013 1/5/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315().()131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments rerarding burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or b~ internet e-mail to in ocollects@nrc.gov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-1 0202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR 2 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 6 6 6

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 I 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED OATES PRIMARY DATE 1/23/2012 1/21/2013 1/27/2014 1/19/2015 ALTERNATE DATE 1/16/2012 1/28/2013 1/20/2014 l/26/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ------

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1C>-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments r1fardin~ burden OPERATOR LICENSING l estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

Nuclear Re?,ulatory Commission, Washington, DC 20555-000 , or ~ Internet e-mail to in ocollects@nrc-gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Alfairs. NE B-10202, (3150-0131), Office of Management and Budget, Washtngton, DC 20503. If a means used to impose an mformation collection does not display a currently valid OMB control number, the NRC may not conduct or sr,onsor, and a person is not required to respond to, the information collect on.

FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 Ill NRC Docket NO. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER cv2o12

- CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS cv2ou cv2ot3 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 0

OPERA TORS - INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE N/A 08/19/13 N/A 08117/15 ALTERNATE DATE N/A 08/26/13 N/A 08/24115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 4 E"elon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1

,..RC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES; 10/3112011 (2~20081 Estimated burden fer res~onn to comply wfth this voluntary Information collection request: hOIJr. hie informaUon collecfun is used to plan budgets and resources for operator examlnaUons. Send comments rG~ardln~ burden OPERATOR LICENSING j eatlmate to the Records end FOIA/Prtvacy Services Branch -5 F 3), U.S.

NuClear R~ulatory Commission, Washington, DC 2055~00 , or blc Internet

&-mail to In ocoilects@nrc.crev, and to the Desk Officer, Olllce of In ormation EXAMINATION DATA and Regulato:r, Alfalni, NE 8*10202, (3150-0131), Oll1ce of Management and Budget, Wash ngton, DC 20503. II a means usad to impose an information collection does not display a currenUy 'llllld OMS ccnlrol number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the informabon COllection.

F.ACilllY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 20t:z CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 l 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012

-- cvzou cy20I4 cv201s NUMBER OF REACTOR OPERATORS s 4 0 4 NUMBER OF SENIOR REACTOR 7 7 0 7 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 1 0 OPERATORS-UPGRADE 0 I NUMBER OF SENIOR REACTOR 0 0 OPERATORS* LIMITED 0 0 PROPOSED DATES PRIMARY DATE 8/6/12 10/14/13 N/A 3/2/15 ALTERNATE DATE 8/20/ll 10/28/13 N/A 3/23/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ""-""'-

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 12 CANDIDATES NRC FORM 535 ( 10.2008) PRINTeD ON REcYCLeD PAPER

Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardine burden estimate to the Records and FOIA/Privacy Services Branch ( -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission. Washington, DC 20555-0001, or b1, internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION LaSalle County Station, Units l and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 9/24/2012 N/A 10/13/2014 N/A ALTERNATE DATE 10/1/2012 N/A 10/20/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- -----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection Is used to plan budgets and resources for operator examinations. Send comments ~rdin~ burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or b{. internet e-mail to in ocollects@nrc'8ov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150..0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the Information collection.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 1 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED t 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 0 6 0 7

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10/1512012 N/A 10/13/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ---- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.0131 EXPIRES: 1013112011 (10.2008) Estimated burden per res~onse to comply with this voluntary tnformat1011 collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information colleclton is used to plan budgela and resources for operator examinations. Sand comments r~ardl~ burden OPERATOR LICENSING estimate to the Records and FOIAIPrlvacy Services Branch -5 F 3), U.S.

Nuclear R=toty CommiSsion. Washtngton, DC 20555-000

  • or ::Yc internal llects@nrc.8t. and to the Desk Officer. Office of In onnatlon EXAMINATION DATA a-mall to In and RegulaiOry Affairs. NE 8-10202. (3150-0131), Office of Management and Budgll. Washtnglon, DC 20503. If a means used to ompoae an information collection does not display a currently valicl OMB control number, lha NRC may not conduct or sponsor, and a person is not required to respond to, the information coltectoon.

FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy20U

- CY 2013

- CY 2014 CY 2015 LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012

- cv2ou CY 2014 CY 2015 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 2 0 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE :z 0 5 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0 PROPOSED DATES PRIMARY DATE 05/29/2012 N/A 06/02/2014 N/A ALTERNATE DATE 06/0412012 N/A 06/09/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYClED PAPER

Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1Q-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments rfarding burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3). U.S.

OPERATOR LICENSING Nuclear R:;rjulatory Commission, Washington, DC 20555-000 , or b{c internet e-mail to in ocollects@nrc.sov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washtngton, DC 20503. If a means used to impose an lnfonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 l 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 6 OPERATORS 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR *See LGS OPERATORS- LIMITED *See LGS *See LGS *See LGS PROPOSED DATES PRIMARY DATE N/A 2/ll/2013 N/A 2/9/2015 ALTERNATE DATE N/A 3/25/2013 NIA 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ----- -----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments rerrding burden estimate to the Records and FOIA!Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or br, internet e-mail to in ocollects@nrc.Sov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 l 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 4 5 0 5 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 9

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 3/26/2012 9/23/2013 N/A 2/9/2015 ALTERNATE DATE 4/23/2012 10/14/2013 N/A 2/23/2015

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 to 0 0 0 0 0 10 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-Q131 EXPIRES: 10/31/2011 (10-:2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is usad to plan budgets and resources for operator examinations. Send comments r1rarding burden estimate to the Records and FOIA!Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or br. internet e-mail to in ocollects@nrc.gov, and to the Desk Offrcer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-Q131). Office of Management and Budget, Washrngton, DC 20503. If a means usad to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectron.

FACILITY NRC REGION TJJree Mile Island Nuclear Station, Unit I Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I I 1 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2012 cy20l3 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 4 5 4 6 OPERATORS NUMBER OF SENIOR REACTOR 5 5 5 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS -LIMITED 0

PROPOSED DATES PRIMARY DATE 02/6/2012 6/10/2013 6/16/2014 6/15/2015 ALTERNATE DATE 02/13/2012 6/17/2013 6/23/2014 6/22/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ------ ----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 0 0 9 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-1 09), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882),

Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924),

Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 201 0-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region Ill Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:

Station 2010 2011 2012 2013 2014 Braidwood N/R 06/20 N/R 03/25 N/R Byron 9/27 N/R 01/16 01/14 01/27 Clinton 11/1 8/22 N/R 8/19 N/R Dresden 03/08 03/07 3/05 3/04 N/R LaSalle 09/13 N/R 09/24 N/R N/R Quad Cities N/R 5/30 3/26 TBD N/R N/R - None Requested TBD -To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ

C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OL.doc To rece1ve

. a copJ of this document, indicate in the box "C" =Copy w/o attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE NAME RIII:DRS JKweiser:co r RIII:DRS I RIII:DRS I 1 DMcNeil HPeterson DATE 01/25/10 02/17/10 02/19/10 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION:

RidsNrrDoriLp13-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMCiinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DR Pill DR Sill Carole Ariana Linda Linn Patricia Buckley Tammy Tomczak

.. .J Exelon Nuclear wwwexe loncorp.corn 4300 Winfield Road Nuclear warrenv1lle, IL 6osss RS-09-109 August 13, 2009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 7 'I cJZ, 0 I~

Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 1 7 2009

August13,2009 U. S. Nuclear Regulatory Commission Page2

Subject:

Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

ger- Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0- Completed NRC Form 536 for Three Mile Island Nuclear Station- Unit 1

Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to lhe Records and FOINPrlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or blc internet e-mail to in ocoilects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202. (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information coilectton.

FACILITY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. lNITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 cv2ou CY 2012 cv2ol3 PROPOSED NUMBER NUMBER OF REACTOR 0 7 0 5 OPERATORS NUMBER OF SENIOR REACTOR 0 12 0 12 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0

PROPOSED DATES PRIMARY DATE N/A 06/20/2011 N/A 03/24/2013 AlTERNATE DATE N/A 07/11/2011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 0 0 0 19 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator e~aminations. Send comments re~arding burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or brc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Byron Stadon, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 Ill NRC Docket Nos. STN S0-454 and STN S0-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 2011 CY2012 CY 2013 PROPOSED NUMBER NUMBER OF REACTOR 8 0 0 6 OPERATORS NUMBER OF SENIOR REACTOR 8 6 6 6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/26/2011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/03/2011 10/01/2012 10/07/2013

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRCFORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0813112008 (8-200S) EaUmated burden /'r.r rea~nH to comply wtth thll voluntary Information collection requell: hour.

  • Information collection
  • ueed to pllln budgeta and resourcee lor operator examlnatlona. Send commenl8 ~rdln~ bur<len eallmate to the Recorda and FOIA/Privacy Sarvlcet B111nch -6 F 3). U.S.

OPERATOR LICENSING Nudear R~ulalofy Commi11ion, Waahington, DC 20655-000

  • or ~ Internet 4H!laN to In ocoHecteOnrcS:, and to the Calk Oflk:er. Olllce oil ormation EXAMINATION DATA end Regul=Affairs, NE *10202, (3150-0131), 011101 of Management end Budget, Walll gton, DC 20503. If a meana uiad to lmpoea an inl'ormation collection doea not diapllly a amen11y valid OMB confiOI number, the NRC may not conduct o~oneor, and a peraon Is not required to '"pond to, the Information col n.

FACIUTY NRC ReGION Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2010 CY2011 CY2012 CY2013 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6 0 OPERATORS 6 6 NUMBER OF SENIOR REACTOR 4 0 4 OPERATORS -INSTANT 0

NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMfTED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 12/05/2011 N/A 08/19/2013 ALTERNATE DATE 11/01/2010 12/11/2011 N/A 08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES NRC FORM~ (WOO!!) PRINTED ON RECYCLED PAPER

Attachment 4 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardlng burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or b(, Internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office or Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currenlly valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Ill NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 cy2o11 CY 2012 CY 2013 PROPOSED NUMBER NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 9 9 9 6

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1 OPERATORS-UPGRADE 1 1 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 03/08/2010 03/07/2011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations. Send comments r~arding burden estimate to the Records and FOIA/Prlvacy Services Branch~ -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re?.ulatory Commission, Washington, DC 20555-000 , or b(. internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulate~ Affairs, NE B-10202, (3150.0131), Office of Management and Budget. Wash ngton, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information collect1on.

FACILITY NRC REGION LaSalle County Station, Units land 2 Facility Operating License Nos. NPF-11 and NPF-18 Ill NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2ou

- CY 2012

- cv2ou NUMBER OF REACTOR 3 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09/21/2010 N/A 10/0l/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 6 Response to RIS 2009-11 Page 1 of 2 iNflC FORM 531 U.S.. NUCLEAR REGULATORY COMIIIIIIICMf APPRO\IEO BY OMS: NO. 311!0-G131 EXPIRES: 1013112011 10.2001)

&tirn818d burdetl f: r~lnfumllllon CCIIIecllon IWqUIIIt hour.

to comply with IIIIa YOiuntlfy lllformatlon CIOIIfctalt .. ....., 11:1 piM ~

OPERATOR LICENSING 8 l l d - for Cll*ftlt -***!lola Send

.....,.. 1o the Rec:ordli 8lld FOI~

~'*lLburiMn s.n.tc. ar.nctl ~ F ). U.S.

~ ~i, W-'*'llll!n. DC

~* 8lld ID 1M Delli Olllolr, Olllct ~I~

,<< :Z,.Iiitlm.c EXAMINATION DATA __,. 11:1

... ~ ...

~W 00 10202. t3t50-0131). 0111ce ~Mii:CC::,

201103. If 8 - uled ID ~.,

~ doN nat dlijii8y

  • c:unwlty IIWicl Ot.e -*"1 numbw, 1118 HAC 1i18Y lbi not condu~10r, Mel
  • perwon Ia not requlnld to lnfann811on *

,..pond to, !hi FACILITY NRC REGION Llmertell Geaendlia Statlo11, Ualta 1 aad 1 F*llty Oper*tbll Lleeate Not. NPF-39 ud NPF-85 I NRC Docket Not. 50-351 aad 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 1010 CY 20t:Z CY 2013 PROPOSED NUMBER

- CY 2111 ESTIMATED NUMSER OF UCENSEE-PREPARED 1 0 1 G EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0 8 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2011 cy2011 cy20ll

- cvzou NUMBER OF REACTOR 6 0 11 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 5 0 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 0 2 0 OPERATORS* UPGRADE 5 NUMBER OF SENIOR REACTOR OPERATORS

  • UMITED *

NUMBER MARCH JUNE ~EPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES

' 0 0 0 0 16 0 0 NRC FOflM !131 (11).21108) PRIHf!D ON RECYCI.ED PAP!R

Attachment 6 Response to RIS 2009-11 Page 2 of 2 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments re(tardln~ burden estimate to the Records and FOIA/Privacy Services Branch \ -5 F 3), U.S.

OPERATOR LICENSING Nuclear Ra~ulatory Commission, Washington, DC 20555-000 , or b~ Internet e-mail to in ocollects@nrc.gov, and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget. Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or siconsor. and a person is not required to respond to, the information collec on.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos, NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMfNATIONS CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 8 PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2011 (10*2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources ror operator eMaminations. Send comments rer.rdine burden estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or brc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatoili Affairs, NE B-10202, (3150..0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sr,onsor, and a person Is not required to respond to, the information collect on.

FACILITY NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 cv2o11 cv2012 CY 2013 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 8 0 7

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 1 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE OS/17/2010 07/11/2011 OS/28/2012 N/A ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re?.ulatory Commission, Washington. DC 20555-000

  • or b~ internet e-mail to in ocollects@nrc-sov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulato:Yr Affairs, NE B-10202, (3150-0131), omce of Management and Budget, Wash ngton, DC 20503. If a means usad to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or ;rconsor, and a person is not required to respond to, the 1nformation colla on.

FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 2011 CY 2012 cy2otJ PROPOSED NUMBER NUMBER OF REACTOR 0 6 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 10 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 2 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED

  • PROPOSED DATES PRIMARY DATE
  • 01131/2011 N/A 02/11/2013 ALTERNATE DATE

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

  • See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates

Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131/2011 (1().2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments ref.rdlng burden estimate to the Records and FOINPrivacy Services Branch -5 F 3). U.S.

OPERATOR LICENSING Nuclear Re?.ulatory Commission. Washington. DC 20555-000

  • or b1r internet e-mail to in ocollects@nrc-gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 I 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 20ll CY 2012 cy2ou PROPOSED NUMBER NUMBER OF REACTOR 0 6 4 3 OPERATORS NUMBER OF SENIOR REACTOR 0 11 10 10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1 1 OPERATORS-UPGRADE 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/12/2012 04/15/2013 ALTERNATE DATE N/A 06/13/2011 03/26/2012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 20ll PROPOSED -- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM 538 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRCFORM531 U.S. NUCLeAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 1013112011 (10.2001) Eatlmated bun:tan par raa~naa to comply with thla voluntary information collecllon requell: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Ia lnfonnatlon coKedlon Ia ulllld to plan budgetJ and 1'8110Un:ea lot operator eiCIII'nlnatlona. Send comment. r~d~ bwdef'l eatlmate to the Recorda and FOIA/Prfvacy Servlc:ea Branch -5 F 3), U.s.

OPERATOR LICENSING Nuclear R~llltory Commlulon, Washington, DC 20fi55.000 , or ~Internet e-mail to In coll~nrc~, and lo the Oellk Olflcer, Oflloa of I rmatlon EXAMINATION DATA and Regu'= Afl'lllr'l, NE 10202, (3150-0131), Oflloa of M1111~1 and Budget, W ngton, DC 20503. If a means uMd to lmpouo an formation colleCtion doel not dlaplay a cunwnUy Ylllld OMB oonrrol number, the NRC may not conduct o~naor, and a person is not raqulred to respond to. the Information col

  • FACIUTY NRC REGION Three Mile Island Nuclear Station, Unit 1 FacWty Operadnc License no. DPR-50 I

NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 cv2o12 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRc-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 cvzon CY2012 PROPOSED NUMBER

- - - cvzou NUMBER OF REACTOR 1 10 0 9 OPERATORS NUMBER OF SENIOR REACTOR 1 10 0 8 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 1 0 I OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 01/:U/2010 09/12/2011 N/A 09/09/2013 ALTERNATE DATE 01/2811010 09/19/2011 N/A 09/16/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY .2010 CY 20ll PROPOSED ---*-*- -*--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (10-2001) PRINTED ON REC'I'Cl.EO PAPER