ML13149A102
| ML13149A102 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/22/2013 |
| From: | Blasioli P Dominion Resources Services |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML13149A102 (2) | |
Text
Dominion Resources Services, Inc.
.m 1 lnsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 22, 2013 United States Nuclear Regulatory Commission Serial No.:
12-418B Attention: Document Control Desk NLOS/vlh Washington, DC 20555 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
SURRY POWER STATION UNITS I & 2 NRC REGULATORY ISSUE
SUMMARY
2012-07 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS NRC Regulatory Issue Summary 2012-07, dated June 8, 2012, requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs) for 2014 through 2017. Dominion provided this information on NRC Form 536 in a letter dated August 14, 2012, Serial No.12-418.
This letter is to notify the NRC of a change to the information previously provided for Surry Power Station, and to request the associated changes in examination scheduling.
Please find an updated NRC Form 536 for Surry Power Station as an attachment to this letter. If you have any questions concerning this information, please contact Mr. Richard Philpot at 757-365-2647.
Very truly yours, P. A. Blasioli Director in Charge Nuclear Support Services Director Nuclear Protection Services and Emergency Preparedness Attachment cc:
U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Surry Power Station
- 00. 3
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 0913012014 (09-2011*"'iEshmsl hxden per rebmspos tc aniy an th I#is vukrtaY iffmynsim ai)chm us 1
hour Ths inrTmrrni mllechn is used to b*a lu s ad resore for cpfa eeninofrioi SadCME eepd~isdr bidnetinm illia t the lifanii
~ Saas Bad, OPERATOR LICENSING (r-5F5, u.s &t ayomw s
vR tvn.,655,Vrboo1, r-.
EXAMINATION DATA nrl to I r i*ruezg
, and to Desk Orfl, Orfce d lrimnrim ad RieguAffiAN N-l (31M0131), O*e Nf a
uagenl and Bue Vlhir DC 20503.
If a me susd to inrpose anir irmabonl&a
- l mdoesnr dsplW a aiuiy
%aid afciomb nrrber', ble IRC mynotondu dor sp or ada Mapeso is nt m red to rrodtcp theirfvman msui FACILITY NRC REGION Surry Power Station 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS 8
8 8
8 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 3
2 2
2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1
1 2
2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 07/28/2014 09/21/2015 09/19/2016 09/18/2017 ALTERNATE DATE 08/04/2014 09/28/2015 09/26/2016 09/25/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2014 cY 2015 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 10 CANDIDATES NRC FORM 536 (09-2011)