ML12234A096
| ML12234A096 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Kewaunee, Surry, North Anna (DPR-032, DPR-037, DPR-043, DPR-065, NPF-004, NPF-007, NPF-049) |
| Issue date: | 08/14/2012 |
| From: | Hartz L Dominion Resources Services, Dominion, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 12-418, RIS-12-007 | |
| Download: ML12234A096 (7) | |
Text
Dominion Resources Services, Inc.
v la...
h.
Innsbrook Technical Center A000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 August 14, 2012 United States Nuclear Regulatory Commission Serial No.:
12-418 Attention: Document Control Desk NLOS/vlh Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK)
DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
NPF-4/7 KEWAUNEE POWER STATION DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS I & 2 SURRY POWER STATION UNITS I & 2 NRC REGULATORY ISSUE
SUMMARY
2012-07 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2012-07, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.
Very truly yours, Leslie N. Hartz L 044,4.
Vice President - Nuclear Support Services Attachments cc:
U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257
)\\0o5
SN 12-418 Scheduling of Operator Licensing Examinations Page 2 of 2 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. J. S. Kim NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. K. D. Feintuch NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 H-4A 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Kewaunee 3
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY 2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 0
8 0
6 OPERATORS NUMBER OF SENIOR REACTOR 0
5 0
4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
3 0
2 NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/03/2015 09/04/2017 ALTERNATE DATE 08/17/2015 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE DECEMBER MARCH JUNE SEPT fAC JN EPTEMBER~ DEEBR MRH JN EPEMBER~ DECEMBER ESTIMATED NUMBER OF 13 CANDIDATES NRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 E9-201) simatedi burden per response to cconty wi this volut / ina* nion coection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Ths kIfonnaton colection is used to plan budgets and resoumces for operator examiafons. Send comments regardirig burden estkrate to the Infonration Servdces Branch OPERATOR LICENSING (r-5 F53), U.S. Nuclear Regulatory Cmrntusm. Washington, DC 20555.000., or by internet -
EXAMINATION DATA r*naltoet
.*ern-@nr.go, andI the Desk Offi, Ofc of I,,orroan and EXAMNATIN DAAegulaloy Affirfs. NEOB1020, (315D-0131), Office of Managernent and Budget Washington.
DC 20503.
If a means used to Impose an information coledion does not display a currently vald 0MB contol nur*ter. the NRC my not conduct or sponsor, and a person is not required to respond to. the fornation collection.
FACILITY NRC REGION Millstone Unit 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY2015 CY2016 CY 2017 NUMBER OF REACTOR 6
0 6
6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3
0 3
NUMBER OF SENIOR REACTOR 3
0 3
3 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 07/21/2014 03/21/2016 12/04/2017 ALTERNATE DATE 08/04/2014 03/28/2016 12/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM&%3 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING IT-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Millstone Unit 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 0
6 0
6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
3 0
3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0
3 0
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 09/07/2015 09/18/2017 ALTERNATE DATE 09/14/2015 09/25/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-S F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by interet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION North Anna 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY 2017 NUMBER OF REACTOR 8
0 8
0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2
0 4
0 NUMBER OF SENIOR REACTOR 3
0 3
0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/16/2014 06/20/2016 ALTERNATE DATE 06/23/2014 06/27/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 12 CANDIDATES NRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31500131 EXPIRES: 0813112008 (8-20)
Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regardng burden estimate to the Records and FOAIAPrvacy Services Branch (T-5 F53). U.S.
OPERATOR LICENSING Nuclear Regulatory Commission. Washington, DC 20555-0001, orb Internet e-mail to infocollects@nrc.gov. and to the Desk Officer. Office of Infrmation EXAMINATION DATA and Regulator7 Affairs, NEOB-10202, (3150-0131). Office of Management and Budget, Wash ngton DC 20503.
If a means used to Impose an nformation collection does not dlsplay a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.
FACIUTY NRC REGION Surry Power Station 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR 6
OPERATORS NUMBER OF SENIOR REACTOR 3
2 2
2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1
1 1
1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 07/2812014 07127/2015 07125/2016 07/24/2017 ALTERNATE DATE 0810412014 0810312015 08/01/2016 07/3112017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 8
D CANDIDATES NR OR 3 (5205 PRITEIO RCYLE"=P NRC FORM 538 (8-2005)
PRINTED ON RECYCLED PAPER