ML13149A082
| ML13149A082 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 03/11/2013 |
| From: | Youman B Exelon Generation Co, Exelon Nuclear |
| To: | Casto C NRC/RGN-III |
| Shared Package | |
| ML11354A426 | List: |
| References | |
| LTR 2013-0026 50-454/13-301, 50-455/13-301 | |
| Download: ML13149A082 (2) | |
Text
Exelon Generation Company, LLC Byron Station 4450 North German Church Road Byron, IL 61010-9794 March 11, 2013 www.exeloncorp.com L TR:
BYRON 2013-0026 File:
1.10.0101 Chuck Casto Regional Administrator-Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Exelon.
Nuclear Subject Submittal of Integrated Initial License Training Examination Materials
Dear Mr. Casto:
Enclosed are the examination materials Byron Station is submitting in support of the initial license exam scheduled April 29-May 10, 2013 at Byron Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures and Integrated Plant Operation Scenario guides.
These examination materials have been developed in accordance with NUREG-1 021, Revision 9, Supplement 1 "Operator Licensing Examination Standards." Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the integrated Examination Outlines in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1 021, Revision 9, Supplement 1, "Operator Licensing Examination Standards."
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG-1 021, Revision 9, Supplement 1, Section E-201, please ensure these materials are withheld from public disclosure until after the examinations are complete.
March 11, 2013 U.S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact David T. Gudger, Regulatory Assurance Manager, at 815-406-2800. For questions concerning examination materials, please contact William F. Hochstetler at 815-406-2043.
Respectfully,
~*
Benjamin P. You~
Plant Manager Byron Nuclear Generating Station BPY JWFH/TLH/cy Enclosures listed below will be hand delivered to Mike Bielby, Chief Examiner, NRC Region Ill RO I SRO Composite Examination with references attached Control Room systems and Facility Walk-Through Job Performance Measures with references attached cc:
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector, Byron