ML13128A060

From kanterella
Jump to navigation Jump to search
Transmittal of 2012 Annual Radioactive Effluent Release Report
ML13128A060
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/25/2013
From: Wunderly B
Duke Energy Florida, Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0413-03
Download: ML13128A060 (1)


Text

PDuke OrEnergy.

Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.36a(a)(2)

ITS 5.7.1.1(c)

April 25, 2013 3F0413-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - 2012 Annual Radioactive Effluent Release Report

Dear Sir:

Florida Power Corporation hereby submits the 2012 Radioactive Effluent Release Report for Crystal River Unit 3 (CR-3) in accordance with 10 CFR 50.36a(a)(2) and the CR-3 Improved Technical Specifications (ITS), Section 5.7.1.1(c). The subject report (Attachment A) includes a summary of the quantities of radioactive liquid and gaseous effluents, and solid waste released from the CR-3 site during 2012. The material provided is consistent with the objectives outlined in the Off-Site Dose Calculation Manual (ODCM) and the Process Control Program (PCP), and is in conformance with 10 CFR 50, Appendix I, Section IV.B. 1.

The CR-3 ITS, Section 5.6.2.3, requires submittal of licensee initiated changes to the ODCM as part of the Radioactive Effluent Release Report for the period of the report in which any changes were made. The ODCM was revised twice during 2012 and both revisions are included in this submittal as Attachment B (Revision 33) and Attachment C (Revision 34). The PCP was not revised in 2012.

No new regulatory commitments are made in this letter.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Licensing Supervisor at (352) 563-4796.

Blair P. Wunderly Plant Manager Crystal River Nuclear Plant BPW/ff Attachments:

A. Annual Radioactive Effluent Release Report 2012 B. Off-Site Dose Calculation Manual, Revision 33 C. Off-Site Dose Calculation Manual, Revision 34 xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager A006 Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428