ML13127A152

From kanterella
Jump to navigation Jump to search
Notification of Ti 186 Inspection (NRC Inspection Report 05000382-13-405)and Request for Information
ML13127A152
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/07/2013
From: Vincent Gaddy
Operations Branch IV
To: Jacobs D
Entergy Operations
References
50-332/13-405, TI-186
Download: ML13127A152 (4)


See also: IR 05000382/2013405

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

May 7, 2013

Donna Jacobs

Vice President, Operations

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

TI-186 INSPECTION (NRC INSPECTION REPORT 05000382/2013405) AND

REQUEST FOR INFORMATION

Dear Ms. Jacobs:

From July 29 to July 31, 2013, inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will perform the Temporary Instruction (TI)-186, Inspection of Procedures and

Processes for Responding to Potential Aircraft Threats. In order to minimize the impact to your

onsite resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. It is important that all of these documents are up to date

and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection. Also, in order to demonstrate

compliance with TI-186, we ask that you have the necessary staff members available to the

inspection team to assist in any plant walk-throughs, interviews, and simulator demonstrations.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Jim Pollock, Licensing Coordinator.

If there are any questions about this inspection or the material requested, please contact

Chris Steely, lead inspector, at (817) 200-1432 (chris.steely@nrc.gov) or Thomas Farina at

(817) 200-1117 (thomas.farina@nrc.gov).

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

D. Jacobs -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Waterford Steam Electric Station, Unit 3

ML13127A152

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS

Publicly Available Non-Sensitive

Category A. Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

OE:OB C:OB

CSteely VGaddy

VGG for /RA/

5/7/2013 5/7/2013

TI-186 INSPECTION DOCUMENT REQUEST

TO: Jim Pollock

Licensing Coordinator, Waterford Steam Electric Station, Unit 3

504-739-6561

FROM: Chris Steely

Operations Engineer, NRC RIV

817-200-1432

SUBJECT: INFORMATION REQUEST TO SUPPORT JULY, 29-31, 2013, TI-186

INSPECTION, INSPECTION OF PROCEDURES AND PROCESSES FOR

RESPONDING TO POTENTIAL AIRCRAFT THREATS.

The following information is requested in order to support inspection preparation

activities. Requested materials should be sent either electronically or hardcopy in

order to arrive at the Region IV office no later than June 17, 2013.

  • Electronically: TO: Chris.Steely@nrc.gov

cc: Thomas.Farina@nrc.gov

  • Hardcopy: TO: U.S. Nuclear Regulatory Commission, Region IV

ATTN: Chris Steely

1600 E. Lamar Blvd

Arlington, TX 76011

Document Request:

  • Procedure(s) that describe actions taken to address potential aircraft threat

notifications onsite. This may include procedures that operations, security,

emergency preparedness, and health physics staff use.

  • Plant specific analyses prepared to support the designed actions you have taken to

address this issue in your procedures. Such analyses were described for support of

site actions in the topical Regulatory Guide 1.214 (dated January 2009).

  • Training materials used to train the various affected groups when contacted with a

potential aircraft threat (licensed operators, operators in training for a license, non-

licensed operators, security, EP, HP, fire brigade, and other support staff, as

examples).

  • If the site has conducted exercises or drills to evaluate the ability of staff to

implement these procedures in the past, provide any documentation summarizing

the results of these events. If any condition reports came out of the exercises/drills,

provide those as well.

-1- Enclosure