Page 1 of 1 PUBLIC SUBMISSION As of: April 26, 2013 Received: April 24, 2013 Status: PendingPost Tracking No. ljx-84yh-j4c4 Comments Due: May 16, 2013 Submission Type: Web Docket: NRC-2013-0070 Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards Consideration Determination Comment On: NRC-2013-0070-0001 Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards Consideration Determination; San Onofre Nuclear Generating Station, Unit 2 Document: NRC-2013-0070-DRAFT-0006 Comment on FR Doc # 2013-08888 Submitter Information Name: Alicia

-?

Address:

Huntington Beach, General Comment Re-opening the power plant without ensuring it is up to the correct safety standards jeopardizes the health of at least 8 million Southern California residents. It is an irresponsible gamble on our safety and I do not consent. If the plant is reopened prematurely, while repairs still need to be made and the pipes are already showing signs of heavy wear, it is likely that the plant will continue to experience frequent problems and safety hazards. It is better to take the time needed to administer proper repairs to ensure that the plant will function properly on a long-term basis.

SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= e. ýý6b/

https ://www.fdms.gov/fdms-web-agency/component/contentstreamer?obj ectld=0900006481I2a6l1b7&for...