Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 April 19, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Watts Bar Nuclear Plant (WBN) Unit I - Cycle 11 Steam Generator Tube Inspection Report In accordance with the requirements of WBN Technical Specification (TS) 5.9.9, "Steam Generator Tube Inspection Report," the Enclosure provides the 180 Day Steam Generator Inspection Report for Unit 1 Cycle 11. This report is required to be submitted within 180 days after the initial entry into MODE 4 following the completion of an inspection performed in accordance with TS 5.7.2.12, "Steam Generator (SG) Program." The report provides the complete results of the tube inspections.
There are no regulatory commitments in this submittal. Please direct any questions concerning this matter to Tommy Morgan, WBN Site Licensing, at 423-365-1401.
Respectully, WV. Shea ce President Nuclear Licensing
Enclosure:
Watts Bar Nuclear Plant U1 R1 1 Steam Generator Tube Inspection Report cc: See Page 2
U.S. Nuclear Regulatory Commission Page 2 April 19, 2013 Enclosure cc (Enclosure):
NRC Regional Administrator - Region II NRC Project Manager - Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1
Enclosure Watts Bar Nuclear Plant U1 RlI Steam Generator Tube Inspection Report