|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) ML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc 2024-09-08
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241350, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Fitness for Duty Exemption2024-11-0707 November 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Fitness for Duty Exemption PMNS20241383, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22024-11-0707 November 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20241312, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specification 3.4.14 Related to Reactor Coolant System Pressure Isolation Valve Leakage2024-11-0606 November 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specification 3.4.14 Related to Reactor Coolant System Pressure Isolation Valve Leakage PMNS20241229, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22024-10-0303 October 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20241083, Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.12024-08-27027 August 2024 Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.1 PMNS20241102, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a2024-08-21021 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a PMNS20240978, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System2024-08-13013 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant and Watts Bar Nuclear Plant License Amendment Request to Revise Technical Specs 3.5.2, Note 1 Related to the Residual Heat Removal System PMNS20241006, Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Inservice Testing of Thermal Relief Valves2024-08-0606 August 2024 Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Inservice Testing of Thermal Relief Valves PMNS20241000, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-08-0606 August 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program PMNS20240795, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling Accident Analys2024-06-26026 June 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling Accident Analysis PMNS20240831, Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program2024-06-24024 June 2024 Meeting with Tennessee Valley Authority to Discuss Proposed Changes to the Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing PMNS20240663, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-05-0909 May 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240568, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications2024-04-24024 April 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specifications PMNS20240551, Regulatory Conference with Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant2024-04-17017 April 2024 Regulatory Conference with Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant PMNS20240298, Meeting with Tennessee Valley Authority to Discuss the Meteorological Aspects of a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Tim2024-03-13013 March 2024 Meeting with Tennessee Valley Authority to Discuss the Meteorological Aspects of a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Time PMNS20240350, Annual Assessment Virtual Public Meeting2024-03-11011 March 2024 Annual Assessment Virtual Public Meeting PMNS20240344, Annual Assessment Public Poster Session and Open House Meeting2024-03-0707 March 2024 Annual Assessment Public Poster Session and Open House Meeting PMNS20240113, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Time2024-02-21021 February 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Revise the Fuel Handling Accident Analysis and Outage Related Fuel Decay Time ML24051A2042024-02-20020 February 2024 Tennessee Valley Authority Pre-Sub Meeting Presentation 2-22-2024 Pmns 20240113 ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications2024-01-30030 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications PMNS20240067, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Delete Surveillance Requirement 3.8.1.8 from the Technical Specifications2024-01-19019 January 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Delete Surveillance Requirement 3.8.1.8 from the Technical Specifications PMNS20231329, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-11-28028 November 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20231126, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 22023-10-18018 October 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 PMNS20231024, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-09-18018 September 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230916, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-08-31031 August 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230795, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 22023-06-30030 June 2023 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for the Watts Bar Nuclear Plant, Units 1 and 2 PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants2023-06-12012 June 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period2023-04-25025 April 2023 Annual Assessment Virtual Meeting for the 2022 Assessment Period PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting2023-04-17017 April 2023 Annual Assessment Public Poster Session and Openhouse Meeting PMNS20230127, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods2023-02-13013 February 2023 Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Increase the Allowable Number of Tritium Producing Burnable Absorber Rods PMNS20221292, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2023-01-11011 January 2023 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request PMNS20221152, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 22022-11-0303 November 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220956, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request2022-09-20020 September 2022 Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML22201A0292022-07-20020 July 2022 Pre-Submittal Teleconference Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request for Sequoyah Nuclear Plant, Unit 1 PMNS20220531, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants2022-05-19019 May 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220379, Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 22022-04-0808 April 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 PMNS20220314, Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants2022-03-31031 March 2022 Meeting with Tennessee Valley Authority to Discuss a Proposed Alternative Request for Sequoyah and Watts Bar Nuclear Plants PMNS20220285, Annual Assessment Meeting2022-03-29029 March 2022 Annual Assessment Meeting PMNS20220079, Public Meeting with the Tennessee Valley Authority (TVA)2022-02-0404 February 2022 Public Meeting with the Tennessee Valley Authority (TVA) PMNS20211575, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request2022-01-18018 January 2022 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, Proposed License Amendment Request PMNS20211571, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods2022-01-0606 January 2022 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Units 1 and 2, Tritium Producing Burnable Absorption Rods PMNS20211507, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal2021-12-0101 December 2021 Pre-Submittal Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2, Capsule Withdrawal PMNS20211347, Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request for Modifications to the Approved 10 CFR 50.69 Categorization Process2021-10-27027 October 2021 Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request for Modifications to the Approved 10 CFR 50.69 Categorization Process PMNS20211308, Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant Unit 2 Alternative Method for the Repair of a through-wall Defect in a Reactor Coolant Pump2021-10-0606 October 2021 Notice of Meeting with the Tennessee Valley Authority (TVA) Regarding a Potential Future Sequoyah Nuclear Plant Unit 2 Alternative Method for the Repair of a through-wall Defect in a Reactor Coolant Pump PMNS20211154, Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request2021-09-21021 September 2021 Meeting with Tennessee Valley Authority Regarding a Proposed Fleet Amendment Request PMNS20211126, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-09-0808 September 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 PMNS20211085, Notice of Meeting with the Tennessee Valley Authority (TVA) - pre-application Meeting Regarding a Future Sequoyah Nuclear Plant License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip2021-09-0303 September 2021 Notice of Meeting with the Tennessee Valley Authority (TVA) - pre-application Meeting Regarding a Future Sequoyah Nuclear Plant License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip PMNS20210945, Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 22021-08-0606 August 2021 Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 2 2024-08-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2013 EA-13-018 EA-13-023 EA-13-045 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING:
REGULATORY/PREDECISIONAL ENFORCEMENT CONFERENCE WATTS BAR NUCLEAR PLANT - DOCKET NOS. 50-390 SEQUOYAH NUCLEAR PLANT - DOCKET NOS. 50-327, 50-328
Dear Mr. Shea:
This letter confirms the telephone conversation between you and Richard Croteau of this office on April 3, 2013, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for April 22, 2013, at 8:00 a.m. Eastern Daylight Time. The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the preliminary inspection findings documented in Inspection Report Nos: 05000390/2012009, 05000327/328/2013009, and 05000327/328/2013010. These findings are summarized as follows:
Watts Bar 05000390/2012009-01: Inadequate Abnormal Condition Procedure for Flood Mitigation Strategy Prior to Installation of flood barriers which was preliminarily identified as Yellow, e.g. an issue having substantial safety significance.
Watts Bar 05000390/2012009-02: Failure to Report Unanalyzed Condition Related to External Flooding (Traditional Enforcement Violation)
Watts Bar 05000390/2012009-03: Failure to Maintain an Adequate Abnormal Condition Procedure to Implement the Flood Mitigation Strategy which was preliminarily identified as Yellow.
Watts Bar 05000390/2012009-04: Failure to Adequately Protect Safety-Related Equipment During Flood Mode Preparation which was preliminarily identified as White, e.g. an issue having low to moderate increased importance to safety.
J. Shea 2 Sequoyah 05000327, 328/2013009-01: Inadequate Abnormal Operating Procedure for Flood Mitigation Strategy Prior to Installation of flood barriers which was preliminarily Yellow.
Sequoyah 05000327, 328/2013009-02: Failure to Report Unanalyzed Condition Related to External Flooding (Traditional Enforcement Violation)
In addition, the conference will also address the apparent violations associated with these inspection findings.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Should you have any questions concerning this conference, please contact me at 404-997-4521.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-327, 50-328, 50-390 License Nos.: DRP-77, DPR-79, NPF-90
Enclosure:
As stated cc w/encl: (See page 3)
_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JDH /RA/ SMS /RA/
NAME JHamman SShaeffer DATE 04/09/2013 04/09/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 cc: David H. Gronek J. T. Carlin Plant Manager Site Vice President Watts Bar Nuclear Plant Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution Electronic Mail Distribution Donna K. Guinn P. R. Simmons Manager, Site Licensing Plant Manager Watts Bar Nuclear Plant Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution Electronic Mail Distribution Terry E. Cribbe J. W. Proffitt Manager, Corporate Licensing Manager, Site Licensing Tennessee Valley Authority Sequoyah Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution Gordon P. Arent C. D. Mackaman Senior Manager, Licensing WBN Unit 2 Program Manager, Corporate Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority Electronic Mail Distribution Electronic Mail Distribution Edward J. Vigluicci County Mayor Associate General Counsel, Nuclear P.O. Box 156 Tennessee Valley Authority Decatur, TN 37322 Electronic Mail Distribution County Executive County Mayor 375 Church Street 208 Courthouse Suite 215 625 Georgia Avenue Dayton, TN 37321 Chattanooga, TN 37402-2801 Tennessee Department of Environment &
Tennessee Department of Environment & Conservation Conservation Division of Radiological Health Division of Radiological Health 401 Church Street 401 Church Street Nashville, TN 37243 Nashville, TN 37243 Ann Harris 341 Swing Loop Rockwood, TN 37854 Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
J. Shea 4 Letter to Joseph W. Shea from Scott M. Shaeffer dated April 9, 2013
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING:
REGULATORY/PREDECISIONAL ENFORCEMENT CONFERENCE WATTS BAR NUCLEAR PLANT - DOCKET NOS. 50-390 SEQUOYAH NUCLEAR PLANT - DOCKET NOS. 50-327, 50-328 Distribution w/encl:
OEMAIL OEWEB PMNS Region II Regional Coordinator NRR Enforcement Coordinator Enforcement Officer and Regional Counsel, RII Public Affairs Officer, RII State Liaison, RII Chief, Resource Management Branch, RII Region II Administrator's Secretary DRP Division Secretary Region II Division Directors and Deputies Region II Receptionist Headquarters Operations Officer NRR DISP/PIPB RIDSNRRPMWattsBar RIDSNRRPMSequoyah L. Douglas, RII C. Evans, RII PUBLIC
SUBJECT:
REGULATORY/PREDECISIONAL ENFORCEMENT CONFERENCE FACILITY: Sequoyah and Watts Bar Nuclear Plants DOCKETS: 50-327, 50-328, and 50-390 DATE & TIME: Monday April 22, 2013 8:00 am to 12:00 pm (EDT)
LOCATION: Marriott Marquis Hotel Room A601 265 Peachtree Center Ave NE Atlanta, GA 30303 PURPOSE: The purpose of this meeting is to discuss four findings and the associated apparent violations for the Watts Bar nuclear plant (ref inspection report 05000390/2012009 (ML13071A289)), and three findings and the associated apparent violations for the Sequoyah nuclear plant (ref.
inspection reports 05000327/2013009, 05000328/2013009 (ML13071A253) and 05000327/2013010, 05000328/2013010 (ML13077A240))
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002 applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding visitors and security.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC OFFICE PARTICIPATING: Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (Partial List)
V. McCree, Regional Administrator, RII R Croteau. Director of Reactor Projects W. Jones, Deputy Director of Reactor Projects S. Shaeffer, Chief, Reactor Projects Branch 6 Enclosure
2 LICENSEE (Partial List)
P. Swafford, Chief Nuclear Office and Executive Vice President, Nuclear Power Group D. Jernigan, Senior Vice President, Nuclear Operations J. Shea, Vice President Nuclear Licensing J. Carlin, Site Vice President Sequoyah Nuclear Plant T. Cleary, Site Vice President Watts Bar Nuclear Plant MEETING CONTACT: Jeff Hamman, NRC, RII 404-997-4747 jeffrey.hamman@nrc.gov AUDIO TELE-CONFERENCING: Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information.
VIDEO TELE-CONFERENCING: Not available Enclosure