3/14/2013 - Summary of Meeting with Florida Power & Light Co., to Discuss Insights About the Performance of the Steam Generators at St. Lucie Plant, Unit No. 2 After Three Operating Cycles
ML13095A347
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/11/2013
From: Siva Lingam
Plant Licensing Branch II
To:
Lingam S NRR/DORL/LPL2-2
Shared Package
ML13094A174 List:
References
TAC ME9534
Download: ML13095A347 (4)


Text

REGlI<..,

UNITED STATES

)-o'jl.L NUCLEAR REGULATORY COMMISSION (1

WASHINGTON, D.C. 20555-0001 o ;:

~!

April 11, 2013

~o

        • 1' LICENSEE:

Florida Power & Light Co.

FACILITY:

S1. Lucie Plant, Unit No.2

SUBJECT:

SUMMARY

OF MARCH 14,2013, MEETING WITH FLORIDA POWER & LIGHT COMPANY TO DISCUSS INSIGHTS ABOUT THE PERFORMANCE OF THE STEAM GENERATORS AT S1. LUCIE PLANT, UNIT NO.2 AFTER THREE OPERATING CYCLES (TAC NO. ME9534)

On March 14, 2013, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company (FPL) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss inSights obtained by FPL about the performance of the replacement steam generators at S1. Lucie Plant, Unit No.2 after three operating cycles. A list of attendees is provided as Enclosure 1 and a summary of the meeting is included as.

The licensee presented information during the meeting, which has been included in the Agencywide Documents Access and Management System under Accession No. ML13094A174.

Members of the public were not in attendance. One member of the media participated via conference call. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or Siva.Lingam@nrc.gov.

~~'~

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389

Enclosures:

1. List of Attendees
2. Summary of the meeting cc w/encls: Distribution via Listserv

LIST OF ATTENDEES MARCH 14.2013. MEETING WITH FLORIDA POWER & LIGHT CO.

TO DISCUSS INSIGHTS ABOUT PERFORMANCE OF STEAM GENERATORS AT ST. LUCIE PLANT, UNIT NO.2 AFTER THREE OPERATING CYCLES Organization Name I

Tracy J. Ort NRC Kenneth J. Karwoski NRC I

Emmett L Murphy NRC Andrew Johnson NRC NRC Rafael L Rodriguez NRC John D. Monninger NRC Jessie F. Quichocho NRC Weidong Wang AREVA Alan Brown Intertek Russell Cipolla FPL Rudy Gil FPL Eric Katzman FPL Edward Korkowski Scripps Newspapers Jerry Shaw AREVA Michel Bioulac

SUMMARY

OF MARCH 14, 2013, MEETING WITH FLORIDA POWER & LIGHT CO.

TO DISCUSS INSIGHTS ABOUT THE PERFORMANCE OF REPLACEMENT STEAM GENERATORS AT ST. LUCIE PLANT. UNIT NO.2, AFTER THREE OPERATING CYCLES DOCKET NO. 50-389 Representatives of Florida Power & Light Co. (the licensee) met with representatives of the U.S. Nuclear Regulatory Commission (NRC) to discuss insights obtained regarding the performance of the steam generators at Sf. Lucie Plant, Unit No.2 after three operating cycles.

During the meeting, the following information was clarified/discussed between the NRC staff and the licensee:

The licensee clarified that the same probe types were used for the non-destructive examinations during the three refueling outages.

  • The NRC staff asked questions regarding the probability of burst calculated for the steam generator (SG) tubes and the licensee clarified that the probability shown was the probability of exceeding the technical specification performance criteria.
  • The licensee performed conservative and realistic operational assessments to bound the range of possible wear growth rates during the next operating cycle, which will be the first operating cycle with an approved extended power uprate.
  • The licensee had a second (independent) operational assessment performed and the contractor presented the results, which supported the first operational assessment.

The SG tubes have not been stabilized prior to plugging, but this is a long term issue.

  • The length distributions are based on a sample of wear indications rather than profiling all the wear indications. The length of the anti-vibration bar (A VB) wear indications is typically the thickness of the AVB (not shorter), so applying the sampling strategy for determining the length distributions was considered to be reasonable by the licensee.
  • There was some discussion on whether the tube wear from the appui (also referred to as V-shaped support pads and support positioning devices) posed any long term concerns, since the appui position the AVB support structure.
  • The differences in the number of indications in SGs A and B were reviewed by the licensee, and attributed to the amount of distortion of the AVBs.
  • The power uprate was not expected to result in a significant increase in the number of wear indications in the SGs.
  • The next scheduled inspection is in Refueling Outage 20, which is scheduled for March of 2014.

April 11, 2013 LICENSEE:

Florida Power & Light Co.

FACILITY:

St. Lucie Plant, Unit No.2

SUBJECT:

SUMMARY

OF MARCH 14,2013, MEETING WITH FLORIDA POWER &LIGHT COMPANY TO DISCUSS INSIGHTS ABOUT THE PERFORMANCE OF THE STEAM GENERATORS AT ST. LUCIE PLANT, UNIT NO.2 AFTER THREE OPERATING CYCLES (TAC NO. ME9534)

On March 14, 2013, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company (FPL) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss insights obtained by FPL about the performance of the replacement steam generators at St. Lucie Plant, Unit No.2 after three operating cycles. A list of attendees is provided as Enclosure 1 and a summary of the meeting is included as.

The licensee presented information during the meeting, which has been included in the Agencywide Documents Access and Management System under Accession No. ML13094A174.

Members of the public were not in attendance. One member of the media participated via conference call. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or Siva.Lingam@nrc.gov.

IRA!

Siva P. Lingam, Project Manager Plant Licensing Branch 1/-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389

Enclosures:

1. List of Attendees
2. Summary of the meeting cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 2-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMStLucie Resource W. Wang, ACRS RidsRgn2MailCenter Resource T. Wertz, NRR RidsNrrDeEsgb Resource RidsNrrLABClayton Resource E. Murphy, NRR A. Johnson, NRR K. Karwoski, NRR J. Cassidy, EDO ADAMS Accession No. PKG ML13094A174; Meeting Notice ML13059A552; Meeting Handouts ML13094A181; ML13094A193; ML13094A191' Meeti Summa ML13095A347 FICE E

DORULPL2-2/PM DORULPL2-2/PM DORULPL2-2/LA DORULPL2-2/BC DORULPL2-2 RRodriguez SLingam BClayton JQuichocho SLingam 04/10113 04/10/13 04/10113 04/10/13 04111/13 OFFICIAL RECORD COpy