ML13095A017

From kanterella
Jump to navigation Jump to search
Containment Penetration Conductor Overcurrent Protective Devices
ML13095A017
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/19/2013
From: Beaver B
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
DUK130780065
Download: ML13095A017 (58)


Text

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 03/19/13 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK130780065

1) 02546 WC LIBRARY - MG01WC
2) 03044 MCG DOC CNTRL MISC MAN MG05DM
3) 03379 DE CALDWELL MG01MM Duke Energy QA CONDITION [: Yes
  • No DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED N Yes
4) 03447 HARRY J SLOAN MG01RP IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 03614 MCG OPS PROCEDURE GP MG01OP ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
6) 03744 OPS TRNG MGR. MG03OT REFERENCE
7) 03759 US NUC REG WASHINGTON, DC MCGUIRE NUCLEAR STATION Duke Energy
8) 04809 MCG PLANT ENG. LIBR. MG05SE McGuire
9) 09460 W C SPENCER MG01RP DCRM MGO2DM RECORD RETENTION # 581188
10) 09665 JON HTHOMPSON, USNRC 13225 Hagers Ferry Road Huntersville, N.C. 28078 SELECTED LICENSEE COMMITMENTS MANUAL (SLC)

Rec'd By Page 2 of 2 Date DOCUMENT NO QA COND REV #/ DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL SLC 16.8.1 NA 131 02/18/13 MADM-03A vi x V1 V1 V1 V2 V1 V1 V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

B C BEAVER MG01RC BCB/TLC

Containment Penetration Conductor Overcurrent Protective Devices 16.8.1 I .2 ELECTRICAL POWER SYSTEMS 16.8.1 Containment Penetration Conductor Overcurrent Protective Devices COMMITMENT All containment penetration conductor overcurrent protective devices shown in Table 16.8.1-1 and Table 16.8.1-2 shall be OPERABLE.

APPLICABILITY: Modes 1, 2, 3, and 4.

REMEDIAL ACTIONS


NOTES---------------------------------

1. Separate Condition entry is allowed for each penetration circuit.
2. Enter applicable Conditions and Required Actions for systems made inoperable by containment penetration conductor overcurrent devices.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A. 1.1 De-energize the circuit(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> containment penetration by tripping the associated overcurrent protection redundant circuit breaker or device(s) inoperable, removing the redundant fuse(s).

AND A.1.2 Verify the associated Once per 31 days redundant protective device(s) to be tripped or removed.

OR A.2.1 De-energize the circuit(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by racking out the inoperable circuit breaker or removing the inoperable protective device(s).

AND A.2.2 Verify the inoperable Once per 31 days device(s) are racked out or removed.

(continued)

McGuire Units 1 and 2 16.8.1-1 Revision 131

Containment Penetration Conductor Overcurrent Protective Devices 16.8.1 REMEDIAL ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B-1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> TESTING REQUIREMENTS


-- NOTE--

1. All containment penetration conductor overcurrent protective devices in Table 16.8.1-1 and Table 16.8.1-2 shall be demonstrated OPERABLE by performance of the following Testing Requirements.
2. TR 16.8.1.1, 16.8.1.2, and 16.8.1.3 are only required to be performed for 10% of the circuit breakers within each voltage level on a rotating basis during each surveillance interval.

TEST FREQUENCY TR 16.8.1.1 Perform a CHANNEL CALIBRATION of associated 18 months protective relays for medium voltage circuits (4 - 15 kV).

TR 16.8.1.2 -- -NOTE For each circuit breaker found inoperable during functional tests, an additional representative sample of 10% of the defective type shall be functionally tested until no more failures are found, or all of that type have been functionally tested.

Perform an integrated system functional test on each 18 months medium voltage (4 -15 kV) circuit breaker which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and control circuits function as designed.

(continued)

McGuire Units 1 and 2 16.8.1-2 Revision 131

Containment Penetration Conductor Overcurrent Protective Devices 16.8.1 TESTING REQUIREMENTS (continued)

TEST FREQUENCY I

TR 16.8.1.3 ---------------- NOTES------------

1. Circuit breakers selected for functional testing shall be selected on a rotating basis.
2. For each circuit breaker found inoperable during functional tests, an additional representative sample of 10% of all the defective type shall be functionally tested until no more failures are found or all of that type have been functionally tested.
3. Lower voltage circuit breakers found inoperable during functional testing shall be restored to OPERABLE status prior to resuming operation.

Perform a functional test of lower voltage circuit breakers 18 months using the nominal trip setpoint and response time values in Table16.8.1-1 and Table 16.8.1-2.

TR 16.8.1.4 Perform fuse inspection and maintenance program. 18 months TR 16.8.1.5 Perform inspection and preventive maintenance on each 60 months circuit breaker in accordance with manufacturer's recommendations.

BASES The tables listed in this commitment were relocated from the McGuire Technical Specifications with the approval of the U.S. Nuclear Regulatory Commission. Any additions, deletions, or revisions to the table are considered a change in a commitment, can only be changed using the 10 CFR 50.59 process, and shall be performed pursuant to applicable procedure.

Containment electrical penetrations and penetration conductors are protected by either de-energizing circuits not required during reactor operation or by demonstrating the

- OPERABILITY of Primary and Backup overcurrent protection devices during periodic surveillance. Primary and Backup overcurrent protection devices are redundant to each other.

McGuire Units 1 and 2 16.8.1-3 Revision 131

Containment Penetration Conductor Overcurrent Protective Devices 16.8.1 BASES (continued)

Electrical penetrations serve a mechanical integrity function in forming part of the containment pressure boundary. Redundant protective devices provide a means of maintaining this mechanical integrity, which ensures proper protection assuming a single random failure of one of the protective devices. In the event a Containment Penetration Conductor Overcurrent Protective device becomes inoperable, the affected electrical penetration must be de-energized. The method of de-energization must include the use of at least one protective device that cannot be adversely affected by a single active failure.

Acceptable methods of de-energization the circuit(s) are tripping the associated redundant circuit breaker, removing the associated redundant fuses, racking out the inoperable circuit breaker, or removing the inoperable circuit breaker or fuse. Opening the inoperable circuit breaker and verifying all phases are open is not an acceptable means of de-energizing the circuit based on concerns with internal breaker integrity after interrupting a rated fault current.

The 31 day Completion Time to reverify that devices are removed or tripped in inoperable circuits is acceptable considering the fact that the devices are operated under administrative control and the probability of misalignment is low.

The Surveillance Requirements applicable to lower voltage circuit breakers provide assurance of breaker reliability by testing at least one representative sample of each manufacturer's brand of circuit breaker. Testing of these circuit breakers consists of injecting a current in excess of the breaker's nominal setpoint and measuring the response time. The measured response time is compared to the manufacturer's data to ensure that it is less than or equal to a value specified by the manufacturer. Each manufacturer's molded case and metal clad circuit breakers are grouped into representative samples which are then tested on a rotating basis to ensure that all breakers are tested. If a wide variety exists within any manufacturer's brand of circuit breakers, it is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of breaker for surveillance purposes.

Fuse testing is in accordance with IEEE Standard 242-1975. This program will detect any significant degradation of the fuses or improperly sized fuses. Safety is further assured by the "fail safe" nature of fuses, that is, if the fuse fails, the circuit will deenergize.

REFERENCES

1. IEEE Standard 242-1975 McGuire Units 1 and 2 16.8.1-4 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED

1. 6900 VAC-Swgr Primary Bkr-RCP1A 5.0 15.4 @ 25A Reactor Coolant Pump 1A Backup Bkr-1TA-5 5.0 16.5 @ 20A Primary Bkr RCPIB 5.0 15.4 @ 25A Reactor Coolant Pump 1B Backup Bkr-ITB-5 5.0 16.5 @ 20A Primary Bkr RCP1C 5.0 15.4 @ 25A Reactor Coolant Pump lC Backup Bkr-1TC-5 5.0 16.5 @ 20A Primary Bkr RCP1D 5.0 15.4 @ 25A Reactor Coolant Pump 1D Backup Bkr-ITD-5 5.0 16.5 @ 20A
2. 600 VAC-MCC 1EMXA-2 1D Primary Bkr 20 45 or 70 @ 60A
  • NC Pump 1C Thermal Barrier Backup Fuse 20 NA Outlet Auto Isol VIv 1KC345A 1EMXA-2 1E Primary Bkr 20 45 or 70 @ 60A
  • NC Pump 1A Thermal Barrier Backup Fuse 20 NA Outlet Auto Isol VIv I KC394A 1EMXA-2 2A Primary Bkr 20 45 or 70 @ 60A
  • Cont Air Return Fan 1A Backup Fuse 20 NA Damper I RAF-D-2 1EMXA-2 2B Primary Bkr 20 45 or 70 @ 60A
  • N2 to Prt Cont Isol Inside Viv Backup Fuse 20 NA 1NC54A 1EMXA-2 2C Primary Bkr 20 45 or 70 @ 60A
  • RCP Mtg Brg Oil Fill Isol VIv Backup Fuse 20 NA 1NC196A 1EMXA-2 3A Primary Bkr 30 45 or 70 @ 90A
  • Accumulator 1A Disch Isol VIv Backup Fuse 30 NA 1N154A 1EMXA-2 3B Primary Bkr 30 45 or 70 @ 90A
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-5 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXA-2 3C Primary Bkr 20 45 or 70 @M60A

  • Test Hdr Inside Cont Isol VIv Backup Fuse 20 NA 1N195A 1EMXA-2 4B Primary Bkr 20 45 or 70 @ 60A
  • PALS Pnl Smple Ret to Cont.

Backup Fuse 20 NA Isol VIv 1WL-1302A 1EMXA-2 4C Primary Bkr 20 45 or 70 @ 60A

  • Accum 1A Vent to 1NC34 for Backup Fuse 20 NA Blkout VIv 1N1430A 1EMXA-2 5A Primary Bkr 20 45 or 70 L 60A
  • RN Containment Isolation VIv Backup Fuse 20 NA 1RN253A 1EMXA-2 5B Primary Bkr 20 45 or 70 @ 60A
  • RN Containment Isolation VIv Backup Fuse 20 NA I RN276A 1EMXA-2 7A Primary Bkr 20 45 or 70 @ 60A
  • S/G 1A Upper Shell Sample Backup Fuse 20 NA Cont Isol Vlv I NM1 87A iEMXA-2 7B Primary Bkr 20 45 or 70 @ 60A
  • S/G 1A Blowdown Line Backup Fuse 20 NA Sample Cont Isol Vlv 1NM190A I EMXA-2 7C Primary Bkr 20 45 or 70 Q 60A
  • SG IC Upper Shell Sample Backup Fuse 20 NA Cont Isol VIv 1NM207A 1EMXA-2 8A Primary Bkr 20 45 or 70 @ 60A
  • SG IC Blowdown Line Line Sample Cont Isol VIv Backup Fuse 20 NA 1NM210A 1EMXA-3 2C Primary Bkr 20 45 or 70 @ 60A
  • RV Containment Isolation VIv Backup Fuse 20 NA 1 RV76A 1EMXA-3 3A Primary Bkr 20 45 or 70 @ 60A
  • H2 Purge Exhaust Cont Backup Fuse 20 NA Vessel Isol VIv 1VE5A

_________I ______ I______ I. __________

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-6 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXA-3 4A Primary Bkr 20 45 or 70 @ 60A

  • H2 Skimmer Fan 1A Suction Backup Fuse 20 NA Isol VIv 1VXIA 1EMXA-3 5B1 Primary Bkr 20 45 or 70 @ 60A
  • RCDT Pump Disch Cont Isol Backup Fuse 20 NA Vlv 1WL2A 1EMXA-3 5C Primary Bkr 20 45 or 70 @ 60A
  • RCDT Vent Cont Isol VIv Backup Fuse 20 NA 1WL39A I EMXA-3 6A Primary Bkr 20 45 or 70 @ 60A
  • RB Sump Pump Disch Cont Backup Fuse 20 NA Isol Vlv 1WL64A 1EMXA-3 6B Primary Bkr 20 45 or 70 @ 60A
  • Cont Vent Unit Condensate Backup Fuse 20 NA Cont Isol Vlv 1WL321A 1EMXA-4 1B Primary Bkr 20 45 or 70 @ 60A
  • NC Pump Seal Return Cont Backup Fuse 20 NA VIv 1NV94AC 1 EMXA-4 3C Primary Bkr 30 45 or 70 @ 90A
  • NC Loop IC Discharge to ND Backup Fuse 30 NA System Cont Isol VIv IND2AC
  • IEMXA-5 1B Primary Bkr 20 45 or 70 Q 60A
  • Pzr Liquid Sample Line Inside Backup Fuse 20 NA Cont Isol VIv 1NM3A, C 1EMXA-5 2C Primary Bkr 20 45 or 70 @ 60A
  • Pzr Steam Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 1NM6A,C 1EMXA-5 2D1 Primary Bkr 20 45 or 70 @ 60A
  • NC Hotleg 1D Sample Line Backup Fuse 20 NA Cont Isol VIv 1NM25A,C 1EMXA-5 3B Primary Bkr 20 45 or 70 @ 60A
  • NC Hotleg 1A Sample Line Backup Fuse 20 NA Cont Isol VIv 1NM22A,C
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-7 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXB-4 IB Primary Bkr 20 45 or 70 @ 60A

  • NC Pump 1 B Thermal Barrier Backup Fuse 20 NA Outlet Auto Isol VIv 1KC364B 1EMXB-4 1C Primary Bkr 20 45 or 70 @ 60A
  • NC Pump 1D Thermal Barrier Backup Fuse 20 NA Auto Isol VIv 1KC413B 1EMXB-4 2A Primary Bkr 20 45 or 70 M 60A
  • NC Pumps Return Hdr Pend Backup Fuse 20 NA Inside Isol VIv 1 KC424B 1EMXB-4 2B1 Primary Bkr 20 45 or 70 @ 60A
  • Reactor Bldg Drn Hdr Inside Backup Fuse 20 NA Cont Isol VIv 1KC429B 1EMXB-4 2C Primary Bkr 30 45 or 70 @ 90A
  • Accumulator 1B Disch Isol VIv Backup Fuse 30 NA 1N165B 1EMXB-4 3D Primary Bkr 30 45 or 70 @ 90A
  • Accumulator 1D Disch Isol Backup Fuse 30 NA VIv 1N188B IEMXB-4 3E Primary Bkr 20 45 or 70M 60A
  • Hotleg Inj Check 1NI124, Backup Fuse 20 NA 1N1128 Test Isol VIv 1NI122B 1EMXB-4 4A Primary Bkr 20 45 or 70 @ 60A
  • Cont Air Return Fan 1B Backup Fuse 20 NA Damper 1RAF-D-4 1EMXB-4 4C Primary Bkr 20 45 or 70 @ 60A
  • NI Accum 1A Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 1NM72B 1EMXB-4 5A Primary Bkr 20 45 or 70 @ 60A
  • NI Accum 1 B Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 1NM75B 1EMXB-4 5B_

Primary Bkr 20 45 or 70 @ 60A

  • NI Accum IC Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 1NM78B
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-8 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXB-4 5C Primary Bkr 20 45 or 70 @ 60A

  • Accum 1B Vent to 1NC32 for Backup Fuse 20 NA Blkout VIv 1N1431 B 1EMXB-4 6A Primary Bkr 20 45 or 70 @ 60A
  • NI Accum 1D Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 1 NM81 B 1EMXB-4 6B1 Primary Bkr 20 45 or 70 @ 60A
  • SG 1B Upper Shell Sample Backup Fuse 20 NA Cont Isol VIv INM197B 1EMXB-4 6C Primary Bkr 20 45 or 70 a 60A
  • SG 1B Bowdown Line Sample Backup Fuse 20 NA Cont Isol VIv 1NM200B 1EMXB-4 7B Primary Bkr 20 45 or 70 @ 60A
  • SG 1 D Upper Shell Sample Backup Fuse 20 NA Cont Isol Vlv 1NM217B 1EMXB-4 7C Primary Bkr 20 45 or 70 @ 60A
  • SG 1D Blowdown Line Smple Backup Fuse 20 NA Cont Isol VIv 1 NM220B 1EMXB-5 1B Primary Bkr 20 45 or 70 @ 60A RV Containment Isolation VIv Backup Fuse 20 NA 1RV33B 1EMXB-5 1C Primary Bkr 20 45 or 70 @ 60A H2 Skimmer Fan 1 B Suction Backup Fuse 20 NA Isol VIv 1VX2B 1EMXC-1A Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 1A (Normal Source) 1EMXC-2A Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 1C (Normal Source) 1EMXC-3B_

Primary Bkr 30 45 or 70 @ 90A Pzr Cavity Booster Fan 1A Backup Fuse 30 NA (Normal Source)

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-9 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXC-3C Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan No. 1A (Normal Source)

Backup Fuse 100 NA 1EMXC-3D Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan Backup Fuse 100 NA No. 1C (Normal Source) 1EMXC-4C Primary Bkr 90 110 or 125 @ 270A* Containment Air Return Fan Backup Fuse 90 NA No. 1A (CARF-1A) 1EMXC-4D Primary Bkr 90 110 or 125 @ 270A* Hydrogen Recombiner No. 1A Backup Fuse 90 NA 1EMXC-6A Primary Bkr 40 45 or 70 @ 120A* Containment Pipe Tunnel Backup Fuse 40 NA Booster Fan CPT-BF-1A 1EMXC-6B Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air Backup Fuse 30 NA Handling Unit 1A 1 EMXC-6C Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air HdIg Backup Fuse 30 NA Unit iC 1 EMXC-6D Primary Bkr 90 110 or 125 @ 270A* Hydrogen Skimmer Fan No.

Backup Fuse 90 NA 1A 1EMXC-7C Primary Bkr 30 45 or 70 @ 90A* Upper Cont Return Air Fan Backup Fuse 30 NA No. 1C 1EMXC-7D Primary Bkr 20 45 or 70 @ 60A* Pzr Pwr Oper Relief Isol VIv Backup Fuse 20 NA 1NC33A 1EMXC-8C Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air Backup Fuse 20 NA HdIg Unit 1A (Normal Source)

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-10 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXC-8D Primary Bkr 20 45 or 70 Q 60A* Upper Containment Return Backup Fuse 20 NA Air Fan No. 1A 1EMXD-1A Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 1B (Normal Source) 1EMXD-2A Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. ID (Normal Source)

IEMXD-3B_

Primary Bkr 40 45 or 70 @ 120A* Containment Pipe Tunnel Backup Fuse 40 NA Booster Fan CPT-BF-1 B 1EMXD-3C Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan Backup Fuse 100 NA No. 1B (Normal Source) 1EMXD-3D Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan Backup Fuse 100 NA No. 1D (Normal Source) 1EMXD-4C Primary Bkr 90 110 or 125 Q 270A* Containment Air Return Fan Backup Fuse 90 NA No. 1B (CAR F-1 B) 1EMXD-4D Primary Bkr 90 110 or 125 @ 270A* Hydrogen Recombiner No. 1B Backup Fuse 90 NA 1EMXD-6C Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air HdIg Backup Fuse 30 NA Unit No. 1B 1EMXD-6D Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air Hdlg Backup Fuse 30 NA Unit No. 1D IEMXD-6E Primary Bkr 90 110 or 125 @ 270* Hydrogen Skimmer Fan No.

Backup Fuse 90 NA 1B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-11 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1EMXD-7B Pdrmary Bkr 30 45 or 70 @ 90A* Upper Cont Return Air Fan Backup Fuse 30 NA No. ID 1EMXD-7C Primary Bkr 20 45 or 70 @ 60A* Pzr No. 1 Pwr Oper Safety Backup Fuse 20 NA Relief Isol VIv 1 NC31 B I EMXD-7D Primary Bkr 20 45 or 70 @ 60A* Pzr No. 1 Pwr Oper Safety Backup Fuse 20 NA Relief Isol VIv 1NC35B 1EMXD-8A Primary Bkr 30 45 or 70 @ 90A* PZR Cavity Booster Fan 1B Backup Fuse 30 NA (Normal Source) 1EMXD-8B Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air Backup Fuse 20 NA Hdlg Unit 1B (Normal Source) 1EMXD-8C Primary Bkr 20 45 or 70 @ 60A* Upper Containment Return Backup Fuse 20 NA Air Fan 11B 1EMXD-8D Primary Bkr 30 45 or 70 @ 90A* NC Loop 1C Disch to ND Backup Fuse 30 NA System Cont Isol VIv 1NDIB 1MXM-F1A Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 1LR14 Backup Fuse 40 NA 1MXM-FIB Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 1LR15 Backup Fuse 40 NA 1MXM-F1C Primary Bkr 30 45 or 70 Q 90A* S/G Compt. Fan IC Backup Fuse 30 NA 1MXM-FID Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1Al Blower A Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-12 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXM-F1E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A2 Blower A Backup Fuse 20 NA 1MXM-F2A Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 1LR16 Backup Fuse 40 NA IMXM-F2B Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd ILR17 Backup Fuse 40 NA I MXM-F2C Primary Bkr 25 45 or 70 @ 75A* Reactor Bldg Equip Hdlg 5 Backup Fuse 25 NA Ton Jib Crane 1MXM-F2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A3 Blower A Backup Fuse 20 NA 1MXM-F2E Primary Bkr 20 45 or 70 @ 60A* Ice Cont AHU 1A4 Blower A Backup Fuse 20 NA 1MXM-F3A Primary Bkr 20 45 or 70 @ 60A* Ice Cont AHU 1A5 Blower A Backup Fuse 20 NA 1MXM-F3B Primary Bkr 20 45 or 70 @ 60A* Ice Cont AHU 1A6 Blower A Backup Fuse 20 NA 1MXM-F3C Primary Bkr 20 45 or 70 @ 60A* Incore Inst Room Sump Backup Fuse 20 NA Pump 1 1MXM-F3D Primary Bkr 100 110 or 150 @ 300A* Upper Cont Welding Recpt Backup Fuse 100 NA 1MXM-F4A Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A7 Blower A Backup Fuse 20 NA I I

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-13 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXM-F4B Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A8 Blower A Backup Fuse 20 NA 1MXM-F4D Primary Bkr 100 110 or 150 @ 300A* Welding Feeder Backup Fuse 100 NA 1MXM-F5C Primary Bkr 50 110 or 150 @ 150A* Ice Cond Floor Cooling Backup Fuse 50 NA Defrost Heater 1A 1MXM-F6C Primary Bkr 60 110 or 150 @ 180A* Reactor Coolant Drain Tank Backup Fuse 60 NA Pump 1A 1MXM-F7A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A9 Blower A Backup Fuse 20 NA 1MXM-F7B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A10 Blower A Backup Fuse 20 NA 1MXM-F7C Primary Bkr 20 45 or 70 @ 60A* Lower Cont Aux Charcoal Backup Fuse 20 NA Filter Fan 1A 1MXM-F8A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU IAl I Blower A Backup Fuse 20 NA 1MXM-F8B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A12 Blower A Backup Fuse 20 NA 1MXM-F8C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A13 Blower A Backup Fuse 20 NA 1MXM-RIA Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B1 Blower A Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-14 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXM-R1B Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1B2 Blower A Backup Fuse 20 NA 1MXM-RIC Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B3 Blower A Backup Fuse 20 NA 1MXM-R1D Primary Bkr 30 45 or 70 Q 90A* RCP 1A Oil Lift Pump No. 1 Backup Fuse 30 NA 1MXM-R2A Primary Bkr 40 45 or 70@ 120A* Lighting Pnlbd lLR12 Backup Fuse 40 NA 1MXM-R2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B4 Blower A Backup Fuse 20 NA 1MXM-R2E Primary Bkr 30 45 or 70 @ 90A* RCP 1B Oil Lift Pump No. 1 Backup Fuse 30 NA 1MXM-R3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHIU 1B5 Blower A Backup Fuse 20 NA 1MXM-R3E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B6 Blower A Backup Fuse 20 NA 1MXM-R3F Primary Bkr 30 45 or 70 @ 90A* RCP 1C Oil Lift Pump No. I Backup Fuse 30 NA 1MXM-R4D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B7 Blower A Backup Fuse 20 NA 1MXM-R4E Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1 B8 Blower A Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-15 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1 MXM-R4F Primary Bkr 30 45 or 70 @ 90A* RCP 1D Oil Lift Pump No. 1 Backup Fuse 30 NA 1MXM-R5B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B9 Blower A Backup Fuse 20 NA 1MXM-R5C Pdmary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B10 Blower A Backup Fuse 20 NA 1MXM-R5D Primary Bkr 175 200 @ 525A Ice Cond Equip Pwr Pnlbd 1A Backup Fuse 175 NA 1MXM-R6A Primary Bkr 20 45 or 70 @ 60A* Rod Cntrl Cluster Change Backup Fuse 20 NA Fixture Hoist Drive 1MXM-R6B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B 11 Blower A Backup Fuse 20 NA 1MXM-R6E Primary Bkr 150 110 or 230 Q 450A* 175 Ton Polar Crane Backup Fuse 150 NA 1MXM-R7A Pdmary Bkr 20 45 or 70 @ 60A* Stud Tensioner Hoist Backup Fuse 20 NA 1MXM-R7B Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive 1A Backup Fuse 20 NA 1MXM-R7D Pdmary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 11B12 Blower A Backup Fuse 20 NA I MXM-R7E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1 B13 Blower A Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-16 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXM-R8A Primary Bkr 20 45 or 70 l- 60A* Incore Inst Drive 1B Backup Fuse 20 NA 1MXM-R8B Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive 1C Backup Fuse 20 NA 1MXM-R8D Primary Bkr 20 45 or 70 (M 60A* Ice Cond AHU 1B114 Blower A Backup Fuse 20 NA 1MXM-R8E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 11B15 Blower A Backup Fuse 20 NA 1MXMA-1B Primary Bkr 30 45 or 70 @ 90A* Pzr Cavity Booster Fan 1B Backup Fuse 30 NA (Alt Source) 1MXMA-ID Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A14 Blower A Backup Fuse 20 NA 1MXMA-IE Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump 1A Backup Fuse 20 NA Pump 1A1 1MXMA-2A Primary Bkr 25 45 or 70 @ 75A* RCPM Maintenance Crane Backup Fuse 25 NA Recpt 1A, 1B, 1C, & 1D 1MXMA-2B_

Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd I LR6 Backup Fuse 25 NA 1MXMA-2C Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd lLR18 Backup Fuse 40 NA 1MXMA-2D_

Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A1 5 Blower A Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-17 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT I Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXMA-3A Primary Bkr 25 45 or 70 C 75A* Lighting Pnlbd 1LR9 Backup Fuse 25 NA 1MXMA-3B Primary Bkr 20 45 or 70 a 60A* Ice Cond Equip Access Door Backup Fuse 20 NA 1A 1MXMA-3C Primary Bkr 50 110 or 150 @ 150A* Ice Cond Floor Cooling Pump Backup Fuse 50 NA 1A 1MXMA-3D Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump 1B Backup Fuse 20 NA Pump 1B1 1MXN-F1A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU WAI Blower B Backup Fuse 20 NA 1MXN-F1B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A2 Blower B Backup Fuse 20 NA 1MXN-FlC Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A3 Blower B Backup Fuse 20 NA 1MXN-F1D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A4 Blower B Backup Fuse 20 NA 1MXN-F2A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A5 Blower B Backup Fuse 20 NA 1MXN-F2B Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A6 Blower B Backup Fuse 20 NA 1MXN-F2C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A7 Blower B Backup Fuse 20 NA 1MXN-F2D Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A8 Blower B Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-18 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXN-F3A Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 1LR1 Backup Fuse 25 NA 1MXN-F3B Primary Bkr 30 45 or 70 @ 90A* S/G Compt. Fan 1B Backup Fuse 30 NA 1 MXN-F3C Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 1LR2 Backup Fuse 25 NA 1MXN-F3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A9 Blower B Backup Fuse 20 NA 1MXN-F3E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A10 Blower B Backup Fuse 20 NA 1MXN-F4A Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive No ID Backup Fuse 20 NA 1MXN-F4B Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive No. I E Backup Fuse 20 NA 1MXN-F4C Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive No. IF Backup Fuse 20 NA 1MXN-F4D Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump 1A Backup Fuse 20 NA Pump 1A2 1MXN-F5C Primary Bkr 60 110 or 150 @ 180A* Reactor Coolant Drain Tank Backup Fuse 60 NA Pump 1B 1MXN-F6B Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump 1B Backup Fuse 20 NA Pump 1B2

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-19 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXN-F6C Primary Bkr 50 110 or 150 @ 150A* Ice Cond Floor Cooling Backup Fuse 50 NA Defrost Htr 1B 1MXN-F7A Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 1LR4 Backup Fuse 25 NA 1MXN-F7B Primary Bkr 25 45 or 70 Q 75A* Lighting Pnlbd 1LR5 Backup Fuse 25 NA 1MXN-F7C Pdmary Bkr 20 45 or 70 @ 60A* Fuel Transfer Sys Reactor Backup Fuse 20 NA Side Fdr 1MXN-F7D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1All Blower B Backup Fuse 20 NA 1MXN-F8B Primary Bkr 30 45 or 70 @ 90A* S/G Compt. Fan 1A Backup Fuse 30 NA 1MXN-F8D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A12 Blower B Backup Fuse 20 NA 1MXN-F8E Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1A13 Blower B Backup Fuse 20 NA 1MXN-R1D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B1 Blower B Backup Fuse 20 NA 1MXN-R1E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B2 Blower B Backup Fuse 20 NA 1MXN-R1F Primary Bkr 30 45 or 70 0 90A* RCP 1A Oil Lift Pump No. 2 Backup Fuse 30 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-20 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXN-R2C Primary Bkr 30 45 or 70 @ 90A* Reactor Cavity Manipulator Backup Fuse 30 NA Crane 1MXN-R2F Primary Bkr 30 45 or 70 a 90A* RCP 1B Oil Lift Pump No. 2 Backup Fuse 30 NA 1MXN-R3A Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1B3 Blower B Backup Fuse 20 NA 1MXN-R3B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B4 Blower B Backup Fuse 20 NA 1MXN-R3C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B5 Blower B Backup Fuse 20 NA 1MXN-R3D Primary Bkr 30 45 or 70 M90A* RCP IC Oil Lift Pump No. 2 Backup Fuse 30 NA 1MXN-R4A Primary Bkr 50 110 or 150 @ 150A* Ice Cond Bridge Crane Backup Fuse 50 NA 1MXN-R4B Primary Bkr 30 45 or 70 Q 90A* RB Equip Hatch Hoist No. 1 Backup Fuse 30 NA 1MXN-R4C Primary Bkr 30 45 or 70 @ 90A* S/G Compt. Fan 11D Backup Fuse 30 NA 1MXN-R4D Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 1B6 Blower B Backup Fuse 20 NA 1MXN-R4E Primary Bkr 30 45 or 70 @ 90A* RCP 1D Oil Lift Pump No.2 Backup Fuse 30 NA 1MXN-R5D__ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Primary Bkr 175 200 @ 525A Ice Cond Eauirp Pwr Pnlbd 1B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-21 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED Backup Fuse 175 NA 1MXN-R6A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B7 Blower B Backup Fuse 20 NA 1MXN-R6B Pdmary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B8 Blower B Backup Fuse 20 NA 1MXN-R6C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B9 Blower B Backup Fuse 20 NA I MXN-R6D Primary Bkr 100 110 or 150 @ 300A* Welding Fdr Backup Fuse 100 NA 1MXN-R7A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B10 Blower B Backup Fuse 20 NA 1MXN-R7B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1 BI 1 Blower B Backup Fuse 20 NA 1MXN-R7C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B12 Blower B Backup Fuse 20 NA 1MXN-R7D Primary Bkr 50 110 or 150 @ 150A* Ice Cond Floor Cooling Pump Backup Fuse 50 NA 1B 1MXN-R8D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B313 Blower B Backup Fuse 20 NA 1MXN-R8E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1 B14 Blower B Backup Fuse 20 NA I MXN-R8F Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1B15 Blower B Backup Fuse 20 NA

_ __ __ __ _ I _ _ _ I_ _ _ _ i_ _ _ _ _ _

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-22 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED 1MXNA-2A Primary Bkr 30 45 or 70 @ 90A* Pzr Cavity Booster Fan 1A Backup Fuse 30 NA (Alt Source) 1MXNA-2B Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 1LR7 Backup Fuse 25 NA 1MXNA-2C Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 11LR8 Backup Fuse 25 NA 1MXNA-2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A14 Blower B Backup Fuse 20 NA 1MXNA-2E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 1A15 Blower B Backup Fuse 20 NA 1MXNA-3A Primary Bkr 20 45 or 70 @ 60A* 2 Ton CRDM Hdlg Jib Crane Backup Fuse 20 NA 1MXNA-3C Primary Bkr 20 45 or 70 @ 60A* NC Pump Motor Drain Tank Backup Fuse 20 NA Pump No. 1 1MXNA-3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond Equip Access Door Backup Fuse 20 NA B SMXA-F4A Primary Bkr 15 45 or 70 fl 45A* Unit 1 Emergency Personnel Backup Fuse 15 NA Lock SMXC-7D Primary Bkr 15 45 or 70 @ 45A* Unit I Personnel Lock Backup Fuse 15 NA SMXG-F3G Primary Bkr 20 45 or 70 @ 60A* Standby Makeup Pump to Backup Fuse 20 NA Cont Sump Isol VIv 1NVIO12C

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-23 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED SMXG-F4G Primary Bkr 20 45 or 70 @ 60A* Standby Makeup Pump to NC Backup Fuse 20 NA Pump Seals Isol VIv

_ __1_NVIO13C SMXG-F5A Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 28, 55, &

Backup Fuse 90 NA 56

3. 600 VAC-Press Htr Pwr Pnls Backup Press Htr Pwr PnI 1A-1A Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 1, 2, & 22 Backup Fuse 90 NA Backup Press Htr Pwr Pnil 1A-1B Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 5, 6, & 27 Backup Fuse 90 NA iC Backup Press Htr Pwr PnI 1A-Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 9, 10, &

Backup Fuse 90 NA 32 Backup Press Htr Pwr Pnl 1A-2C Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 11, 12, &

Backup Fuse 90 NA 35 Backup Press Htr Pwr PnI 1A-2D Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 13, 14, &

Backup Fuse 90 NA 37 Backup Press Htr Pwr Pni lA-2E Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 17, 18, &

Backup Fuse 90 NA 42 Backup Press Htr Pwr Pnl 1B-1A Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 21, 47, &

Backup Fuse 90 NA 48 Backup Press Htr Pwr PnI 1B-1B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-24 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 26, 53, &

Backup Fuse 90 NA 54 Backup Press Htr Pwr Pnl I B-1C Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 31, 59, &

Backup Fuse 90 NA 60 Backup Press Htr Pwr Pnl 1B-2C Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 36, 65, &

Backup Fuse 90 NA 66 Backup Press Htr Pwr Pni 1B-2D Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 41, 71, &

Backup Fuse 90 NA 72 Backup Press Htr Pwr Pni 1B-2E Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 46, 77, &

Backup Fuse 90 NA 78 Backup Press Htr Pwr PnlI C-IA Primary Bkr 90 110 or 125 Q 270A* Pressurizer Heaters 7, 8, &30 Backup Fuse 90 NA Backup Press Htr Pwr Pnl IC-1B Primary Bkr 90 110 or 125 Q 270A* Pressurizer Heaters 19, 20, &

Backup Fuse 90 NA 45 Backup Press Htr Pwr Pnl 1C-ic Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 24, 51, &

Backup Fuse 90 NA 52 Backup Press Htr Pwr PnI 1C-1D Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 29, 57, &

Backup Fuse 90 NA 58 Backup Press Htr Pwr Pnl 1C-2C Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 34, 63, &

Backup Fuse 90 NA 64

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-25 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED Backup Press Htr Pwr PnI 1C-2D Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 39, 69, &

Backup Fuse 90 NA 70 Backup Press Htr Pwr PnI 1C-2E Primary Bkr 90 110 or 125 Q 270A* Pressurizer Heaters 44, 75, &

Backup Fuse 90 NA 76 Backup Press Htr Pwr PnI 1D-1A Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 3, 4, & 25 Backup Fuse 90 NA Backup Press Htr Pwr PnI 1D-1B Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 15, 16, &

Backup Fuse 90 NA 40 Backup Press Htr Pwr PnI 1D-1iC Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 23, 49, &

Backup Fuse 90 NA 50 Backup Press Htr Pwr PnI 1D-2C Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 33, 61, &

Backup Fuse 90 NA 62 Backup Press Htr Pwr PnI 1D-2D Primary Bkr 90 110 or 125 @ 270A* Pressurizer Heaters 38, 67, &

Backup Fuse 90 NA 68 Backup Press Htr Pwr PnI 1D-2E Primary Bkr 90 110 or 125 Q 270A* Pressurizer Heaters 43, 73, &

Backup Fuse 90 NA 74

4. 120 VAC-Panelboards 1KM-1 Primary Bkr 30 45 or 70 @ 90* RCP 1A Space Htr Backup Fuse 30 NA 1KM-2 Primary Bkr 30 45 or 70 Q 90* RCP 1C Space Htr
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-26 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED Backup Fuse 30 NA 1KN-1 Primary Bkr 30 45 or 70 @ 90* RCP 1 B Space Htr Backup Fuse 30 NA 1KN-2 Primary Bkr 30 45 or 70 @ 90* RCP 1D Space Htr Backup Fuse 30 NA 1KN-27 Primary Bkr 20 36 or 70 @ 60* Fuel Handling Control Backup Fuse 20 NA Console 1KN-31 Primary Bkr 20 36 or 70 @ 60* Incore Inst. 120 VAC Outlet Backup Fuse 20 NA Receptacles

5. 250 VDC-Lighting RB Deadlight Pnlbd 1DLD # 1 Primary Bkr 20 40 @ 60 Ltg Pnl Nos. 1LR1 & 1LR2 Backup Fuse 20 NA RB Deadlight Pnlbd 1DLD # 3 Primary Bkr 20 40 @ 60 Ltg PnI Nos. 1LR4, 1LR5, &

Backup Fuse 20 NA 1LR6 RB Deadlight Pnlbd IDLD # 4 Primary Bkr 20 40 @ 60 Ltg Pnl Nos. 1LR7, 1LR8, &

Backup Fuse 20 NA 1LR9 RB Deadlight Pnlbd 1DLD # 6 Primary Bkr 20 40 @ 60 Ltg Pnl Nos. 1LR12 Backup Fuse 20 NA RB Deadlight Pnlbd 1DLD # 7 Primary Bkr 20 40 @ 60 Ltg PnI Nos. 1LR16 Backup Fuse 20 NA RB Deadlight Pnlbd 1DLD # 9 Primary Bkr 20 40 @ 60 Ltg PnI Nos. 1LR1 8 & 1LRI 7 Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-27 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED

6. VAC - LC Outage Power Fuse Box 1A Primary Fuse 150 NA Upper Containment Safety Backup Fuse 150 Switch 1A Primary Fuse 150 NA Upper Containment Safety Backup Fuse 150 NA Switch 1 B Primary Fuse 200 NA Lower Containment Outage Backup Fuse 200 NA Power Distr. Pni 1A Primary Fuse 225 NA Lower Containment Outage Backup Fuse 225 NA Power Distr. Pni 1B
7. 600 VAC - Containment HVAC Alternate Feeders 1VTB-1A Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air Hdlg Unit 1A (Alt Source) 1VrF-1A Primary Fuse 20 NA Incore Instrumentation Rm Air Hdlg Unit 1A (Alt Source) 1VTB-1B Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air HdIg Unit 1B (Alt Source) 1VIF-1B Primary Fuse 20 NA Incore Instrumentation Rm Air HdIg Unit 1B (Alt Source) 1VRB-1A Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan No. 1A (Alt Source) 1VRF-1A Primary Fuse 100 NA Control Rod Drive Vent Fan No. 1A (Alt Source) 1VRB-1B Primary Bkr 100 110 or 150 A-300A* Control Rod Drive Vent Fan No. 1B (Alt Source)

HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-28 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED IVRF-11B Primary Fuse 100 NA Control Rod Drive Vent Fan No. 1B (Alt Source) 1VRB-1C Primary Bkr 100 110 or 150 @ 300A* Control Rod Drive Vent Fan No. lC (Alt Source) 1VRF-IC Primary Fuse 100 NA Control Rod Drive Vent Fan No. lC (AIt Source) 1VRB-1D Primary Bkr 100 110 or 150@ 300A* Control Rod Drive Vent Fan No. 1D (Alt Source) 1VRF-1D Primary Fuse 100 NA Control Rod Drive Vent Fan No. 1 D (Alt Source) 1VLB-1A Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 1A (Alt Source) 1VLF-1A Primary Fuse 200 NA Lower Containment Cooling Unit No. 1A (Alt Source) 1VLB-1B_

Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 1 B (Alt Source) 1VLF-1B Primary Fuse 200 NA Lower Containment Cooling Unit No. 1B (Alt Source) 1VLB-1C Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. IC (Alt Source) 1VLF-lC Primary Fuse 200 NA Lower Containment Cooling Unit No. 1C (Alt Source) lVLB-1D_

Primary Bkr 200 250 @ 600A Lower Containment Cooling

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-29 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-1 UNIT 1 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING RESPONSE TIME DEVICE NO. & LOCATION (AMPERES) (SECONDS) SYSTEM POWERED Unit No. 1D (Alt Source) 1VLF-1D Primary Fuse 200 NA Lower Containment Cooling Unit No. 1D (Alt Source)

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-30 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

1. 6900 VAC-Swgr Primary Bkr-RCP2A 5.0 15.4 @ 25A Reactor Coolant Pump 2A Backup Bkr-2TA-5 5.0 16.5 @c20A Primary Bkr RCP2B 5.0 15.4 @ 25A Reactor Coolant Pump 2B Backup Bkr-2TB-5 5.0 16.5 (E 20A Primary Bkr RCP2C 5.0 15.4 @ 25A Reactor Coolant Pump 2C Backup Bkr-2TC-5 5.0 16.5 @ 20A Primary Bkr RCP2D 5.0 15.4 @ 25A Reactor Coolant Pump 2D Backup Bkr-2TD-5 5.0 16.5 (a 20A
2. 600 VAC-MCC 2EMXA-2 1D Primary Bkr 20 45 or 70 @ 60A* NC Pump 2C Thermal Backup Fuse 20 NA Barrier Outlet Auto Isol VIv 2KC345A 2EMXA-2 1E Primary Bkr 20 45 or 70 @ 60A* NC Pump 2A Thermal Backup Fuse 20 NA Barrier Outlet Auto Isol Vlv 2KC394A 2EMXA-2 2A Primary Bkr 20 45 or 70 @ 60A* Cont Air Return Fan 2A Backup Fuse 20 NA Damper 2RAF-D-2 2EMXA-2 2B Primary Bkr 20 45 or 70 @ 60A* N2 to Prt Cont Isol Inside Backup Fuse 20 NA VIv 2NC54A 2EMXA-2 2C Primary Bkr 20 45 or 70 @ 60A* RCP Mtg Brg Oil Fill Isol Vlv Backup Fuse 20 NA 2NC196A 2EMXA-2 3A Primary Bkr 30 45 or 70 @ 90A* Accumulator 2A Disch Isol Backup Fuse 30 NA Vlv 2N154A 2EMXA-2 3B Primary Bkr 30 45 or 700-90A* Accumulator 2C Disch Isol Backup Fuse 30 NA VIv 2NI76A
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-31 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2EMXA-2 3C Primary Bkr 20 45 or 70 2 60A* Test Hdr Inside Cont Isol Backup Fuse 20 NA VIv 2NI95A 2EMXA-2 4B Primary Bkr 20 45 or 70 @ 60A* PALS Pnl Smple Ret to Backup Fuse 20 NA Cont. Isol VIv 2WL-1 302A 2EMXA-2 4C Primary Bkr 20 45 or 70 @ 60A* Accum 2A Vent to 2NC34 Backup Fuse 20 NA for Blkout Vlv 2NI430A 2EMXA-2 5A Primary Bkr 20 45 or 70 @ 60A* RN Containment Isolation Backup Fuse 20 NA Vlv 2RN253A 2EMXA-2 5B Primary Bkr 20 45 or 70 0 60A* RN Containment Isolation Backup Fuse 20 NA VIv 2RN276A 2EMXA-2 7A Primary Bkr 20 45 or 70 @ 60A* S/G 2A Upper Shell Sample Backup Fuse 20 NA Cont Isol VIv 2NM187A 2EMXA-2 7B Primary Bkr 20 45 or 70 @ 60A* SIG 2A Blowdown Line Backup Fuse 20 NA Sample Cont Isol Vlv 2NM190A 2EMXA-2 7C Primary Bkr 20 45 or 70 @ 60A* SG 2C Upper Shell Sample Backup Fuse 20 NA Cont Isol Vlv 2NM207A 2EMXA-2 8A Primary Bkr 20 45 or 70 @ 60A* SG 2C Blowdown Line Line Sample Cont Isol VIv Backup Fuse 20 NA 2NM210A 2EMXA-3 1A Primary Bkr 20 45 or 70 @ 60A* Lower Cont Vent Unit discharge cont isol vlv Backup Fuse 20 NA 2RV76A 2EMXA-3 3A Primary Bkr 20 45 or 70 Q 60A* H2 Purge Exhaust Cont Backup Fuse 20 NA Vessel Isol VIv 2VE5A

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-32 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2EMXA-3 4A Primary Bkr 20 45 or 70 @ 60A* H2 Skimmer Fan 2A Backup Fuse 20 NA Suction Isol VIv 2VXIA 2EMXA-3 5B Primary Bkr 20 45 or 70 @ 60A* RCDT Vent Cont Isol VIv Backup Fuse 20 NA 2WL2A 2EMXA-3 5C Primary Bkr 20 45 or 70 @ 60A* RCDT Vent Cont Isol VIv Backup Fuse 20 NA 2WL39A 2EMXA-3 6A Primary Bkr 20 45 or 70 @ 60A* RB Sump Pump Disch Cont Backup Fuse 20 NA Isol VIv 2WL64A 2EMXA-3 6B Primary Bkr 20 45 or 70 Q 60A* Cont Vent Unit Condensate Backup Fuse 20 NA Cont Isol VIv 2WL321A 2EMXA-4 1B Primary Bkr 20 45 or 70 @ 60A* NC Pump Seal Return Cont Backup Fuse 20 NA Vlv 2NV94AC 2EMXA-4 3C Primary Bkr 30 45 or 70 @ 90A* NC Loop 2C Discharge to

_ _ND System Cont Isol VIv Backup Fuse 30 NA 2ND2A,C 2EMXA-5 1B Primary Bkr 20 45 or 70 @ 60A* Pzr Liquid Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM3A,C 2EMXA-5-2C Primary Bkr 20 45 or 70 @ 60A* Pzr Steam Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM6A,C 2EMXA-5 2D Primary Bkr 20 45 or 70 Q 60A* NC Hotleg 2D Sample Line Backup Fuse 20 NA Cont Isol VIv 2NM25A,C 2EMXA-5 3B Primary Bkr 20 45 or 70 Q 60A* NC Hotlea 2A Sample Line

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-33 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 20 NA Cont Isol VIv 2NM22A,C 2EMXB-4 1B Primary Bkr 20 45 or 70 (M 60A* NC Pump 2B Thermal Backup Fuse 20 NA Barrier Outlet Auto Isol VIv 2KC364B 2EMXB-4 lC Primary Bkr 20 45 or 70 0 60A* NC Pump 2D Thermal Backup Fuse 20 NA Barrier Auto Isol VIv 2KC413B 2EMXB-4 2A Primary Bkr 20 45 or 70 @ 60A* NC Pumps Return Hdr Pend Backup Fuse 20 NA Inside Isol Vlv 2KC424B 2EMXB-4 2B1 Primary Bkr 20 45 or 70 Q 60A* Reactor Bldg Drn Hdr Inside Backup Fuse 20 NA Cont Isol VIv 2KC429B 2EMXB-4 2C Primary Bkr 30 45 or 70 4@ 90A* Accumulator 2B Disch Isol Backup Fuse 30 NA VIv 2NI65B 2EMXB-4 3D Primary Bkr 30 45 or 70 @ 90A* Accumulator 2D Disch Isol Backup Fuse 30 NA VIv 2NI88B 2EMXB-4 3E Primary Bkr 20 45 or 70 ( 60A* Hotleg Inj Check 2NI124, Backup Fuse 20 NA 2NI128 Test Isol VIv 2NI122B 2EMXB-4 4A Primary Bkr 20 45 or 70 @ 60A* Cont Air Return Fan 2B Backup Fuse 20 NA Damper 2RAF-D-4 2EMXB-4 4C Primary Bkr 20 45 or 70 ( 60A* NI Accum 2A Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM72B 2EMXB-4 5A Primary Bkr 20 45 or 70 0 60A* NI Accum 2B Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM75B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-34 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2EMXB-4 5B Primary Bkr 20 45 or 70 ( 60A* NI Accum 2C Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM78B 2EMXB-4 5C Primary Bkr 20 45 or 70 @ 60A* Accum 2B Vent to 2NC32 Backup Fuse 20 NA for Blkout VIv 2NI431 B 2EMXB-4 6A Primary Bkr 20 45 or 70 0 60A* NI Accum 2D Sample Line Backup Fuse 20 NA Inside Cont Isol VIv 2NM81B 2EMXB-4 6B Primary Bkr 20 45 or 70 @ 60A* SG 2B Upper Shell Sample Backup Fuse 20 NA Cont Isol VIv 2NM197B 2EMXB-4 6C Primary Bkr 20 45 or 70 @ 60A* SG 2B Bowdown Line Backup Fuse 20 NA Sample Cont Isol VIv 2NM200B 2EMXB-4 7B Primary Bkr 20 45 or 70 @ 60A* SG 2D Upper Shell Sample Backup Fuse 20 NA Cont Isol VIv 2NM217B 2EMXB-4 7C Primary Bkr 20 45 or 70 @ 60A* SG 2D Blowdown Line Sample Cont Isol VIv Backup Fuse 20 NA 2NM220B 2EMXB-5 1B Primary Bkr 20 45 or 70 (M60A* Lower cont vent unit supply Backup Fuse 20 NA cont isol vlv 2RV33B 2EMXB-5 I C Primary Bkr 20 45 or 70 (M 60A* H2 Skimmer Fan 2B Backup Fuse 20 NA Suction Isol VIv 2VX2.B 2EMXC-IA Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 2A (Normal Source) 2EMXC-2A

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-35 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 2C (Normal Source) 2EMXC-3C Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2A (Normal Source)

Backup Fuse 100 NA 2EMXC-3D Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2C (Normal Source)

Backup Fuse 100 NA 2EMXC-4C Primary Bkr 90 110 or 125 @ Containment Air Return Fan 270A* No. 2A (CARF-2A)

Backup Fuse 90 NA 2EMXC-4D Primary Bkr 90 110 or 125 @ Hydrogen Recombiner No.

270A* 2A Backup Fuse 90 NA 2EMXC-6A Primary Bkr 40 45 or 70 @ 120A* Containment Pipe Tunnel Backup Fuse 40 NA Booster Fan CPT-BF-2A 2EMXC-6B Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air Backup Fuse 30 NA Handling Unit 2A 2EMXC-6C Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air Hdlg Backup Fuse 30 NA Unit2C 2EMXC-6D Primary Bkr 90 110 or 125 @ Hydrogen Skimmer Fan No.

270A° 2A Backup Fuse 90 NA 2EMXC-7A Primary Bkr 30 45 or 70 @ 90A* PZR Cavity Booster Fan 2A Backup Fuse 30 NA (Normal Source) 2EMXC-7B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-36 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT, RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 20 45 or 70 @ 60A* Upper Containment Return Backup Fuse 20 NA Air Fan No. 2A 2EMXC-7C Primary Bkr 20 45 or 70 @ 60A* Upper Cont Return Air Fan Backup Fuse 20 NA No. 2C 2EMXC-7D Primary Bkr 20 45 or 70 Q 60A* Pzr Pwr Oper Relief Isol VIv Backup Fuse 20 NA 2NC33A 2EMXC-8C Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Backup Fuse 20 NA Air Hdlg Unit 2A (Normal Source) 2EMXD-1A Primary Bkr 200 250 ( 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 2B (Normal Source) 2EMXD-2A Primary Bkr 200 250 @ 600A Lower Containment Cooling Backup Fuse 200 NA Unit No. 2D (Normal Source) 2EMXD-3B Primary Bkr 40 45 or 70 @ 120A* Containment Pipe Tunnel Backup Fuse 40 NA Booster Fan CPT-BF-2B 2EMXD-3C Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2B (Normal Source)

Backup Fuse 100 NA 2EMXD-3D Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2D (Normal Source)

Backup Fuse 100 NA 2EMXD-4C Primary Bkr 90 110 or 125 @ Containment Air Return Fan 270A* No. 2B (CARF-2B)

Backup Fuse 90 NA 2EMXD-4D Primary Bkr 90 110 or 125 @ Hydrogen Recombiner No.

270A*

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-37 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 90 NA 2B 2EMXD-5C Primary Bkr 20 45 or 70 @ 60A* Upper Containment Return Backup Fuse 20 NA Air Fan 2B 2EMXD-6C Primary Bkr 30 45 or 70 ( 90A* Upper Containment Air Hdlg Backup Fuse 30 NA Unit No. 2B 2EMXD-6D Primary Bkr 30 45 or 70 @ 90A* Upper Containment Air HdIg Backup Fuse 30 NA Unit No. 2D 2EMXD-6E Primary Bkr 100 110 or 150 @ Hydrogen Skimmer Fan No.

300A* 2B Backup Fuse 100 NA 2EMXD-7B Primary Bkr 20 45 or 70 @ 60A* Upper Cont Return Air Fan Backup Fuse 20 NA No. 2D 2EMXD-7C Primary Bkr 20 45 or 70 0 60A* Pzr Pwr Oper Safety Relief Backup Fuse 20 NA Isol VIv 2NC31 B 2EMXD-7D Primary Bkr 20 45 or 70 0- 60A* Pzr Pwr Oper Safety Relief Backup Fuse 20 NA Isol VIv 2NC35B 2EMXD-8A Primary Bkr 40 45 or 70 @ 120A* PZR Cavity Booster Fan 2B Backup Fuse 40 NA (Normal Source) 2EMXD-8B Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Backup Fuse 20 NA Air HdIg Unit 2B (Normal Source) 2EMXD-BD Primary Bkr 30 45 or 70 0 90A* NC Loop 2C Disch to ND Backup Fuse 30 NA System Cont Isol VIv 2ND1B 2MXM-F1C

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-38 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 50 110 or 150 @ Ice Cond Floor Cooling 150A* Defrost Heater 2A Backup Fuse 50 NA 2MXM-F2A Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 2LR14 Backup Fuse 40 NA 2MXM-F2B Primary Bkr 40 45 or 70 0 120A* Lighting Pnlbd 2LR15 Backup Fuse 40 NA 2MXM-F2C Primary Bkr 30 45 or 70 @ 90A* Pzr Cavity Booster Fan 2B Backup Fuse 30 NA (Alt Source) 2MXM-F2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A1 Blower Backup Fuse 20 NA A 2MXM-F2E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A2 Blower Backup Fuse 20 NA A 2MXM-F3A Primary Bkr 40 45 or 70 (@120A* Lighting Pnlbd 2LR16 Backup Fuse 40 NA 2MXM-F3B Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 2LR17 Backup Fuse 40 NA 2MXM-F3C Primary Bkr 25 45 or 70 () 75A* Reactor Bldg Equip Hdlg 5 Backup Fuse 25 NA Ton Jib Crane 2MXM-F3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A3 Blower Backup Fuse 20 NA A 2MXM-F3E I Primary Bkr 20 45 or 70 @M 60A* Ice Cont AHU 2A4 Blower A-

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-39 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 20 NA 2MXM-F4A Primary Bkr 20 45 or 70 @ 60A* Ice Cont AHU 2A5 Blower A Backup Fuse 20 NA 2MXM-F4B Primary Bkr 20 45 or 70 @ 60A* Ice Cont AHU 2A6 Blower A Backup Fuse 20 NA 2MXM-F4C Primary Bkr 20 45 or 70 @ 60A* Incore Inst Room Sump Backup Fuse 20 NA Pump 2MXM-F4D Primary Bkr 100 110 or 150 @ Upper Cont Welding Recpt 300A*

Backup Fuse 100 NA 2MXM-F5A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A7 Blower Backup Fuse 20 NA A 2MXM-F5B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A8 Blower Backup Fuse 20 NA A 2MXM-F5D Primary Bkr 100 110 or 150 @ Welding Feeder 300A*

Backup Fuse 100 NA 2MXM-F6A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A9 Blower Backup Fuse 20 NA A 2MXM-F6B Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 2A10 Blower Backup Fuse 20 NA A 2MXM-F6C Primary Bkr 30 45 or 70 @ 90A* Lower Cont Aux Charcoal Backup Fuse 30 NA Filter Fan 2A

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-40 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2MXM-F7A Primary Bkr 20 45 or 70 Cc60A* Ice Cond AHU 2A1 1 Blower Backup Fuse 20 NA A 2MXM-F7B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A12 Blower Backup Fuse 20 NAA 2MXM-F7C Primary Bkr 20 45 or 70 0 60A* Ice Cond AHU 2A13BIower Backup Fuse 20 NA A 2MXM-F8C Primary Bkr 60 110 or 150 @ Reactor Coolant Drain Tank 180A* Pump2A Backup Fuse 60 NA 2MXM-R1A Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 2B1 Blower Backup Fuse 20 NA A 2MXM-R 1B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B2 Blower Backup Fuse 20 NA A 2MXM-RlC Primary Bkr 20 45 or 70 a 60A* Ice Cond AHU 2B3 Blower Backup Fuse 20 NA A 2MXM-R1D Primary Bkr 30 45 or 70 @ 90A* RCP 2A Oil Lift Pump No. 1 Backup Fuse 30 NA 2MXM-R2A Primary Bkr 40 45 or 70 0 120A* Lighting Pnlbd 2LR12 Backup Fuse 40 NA 2MXM-R2C Primary Bkr 20 45 or 70 @ 160A* RCPM Maintenance Crane Backup Fuse 20 NA Recpt 2A, 2B1,2C, & 2D

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-41 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2MXM-R2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B4 Blower Backup Fuse 20 NA A 2MXM-R2E Primary Bkr 30 45 or 70 @ 90A* RCP 2B Oil Lift Pump No. I Backup Fuse 30 NA 2MXM-R3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B5 Blower Backup Fuse 20 NA A 2MXM-R3E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 286 Blower Backup Fuse 20 NA A 2MXM-R3F Primary Bkr 30 45 or 70 @ 90A* RCP 2C Oil Lift Pump No. 1 Backup Fuse 30 NA 2MXM-R4D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 287 Blower Backup Fuse 20 NA A 2MXM-R4E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 288 Blower Backup Fuse 20 NA A 2MXM-R4F Primary Bkr 30 45 or 70 @ 90A* RCP 2D Oil Lift Pump No. 1 Backup Fuse 30 NA 2MXM-R5B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 289 Blower Backup Fuse 20 NA A 2MXM-R5C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2810 Blower Backup Fuse 20 NA A 2MXM-R5D I Primary Bkr 175 200 @ 525A Ice Cond Ectui Pwr Pnlbd

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-42 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 175 NA 2A 2MXM-R6A Primary Bkr 20 45 or 70 @ 60A* Rod Cntrl Cluster Change Backup Fuse 20 NA Fixture Hoist Drive 2MXM-R6B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B13 Blower Backup Fuse 20 NA A 2MXM-R6D Primary Bkr 150 110 or 230 @ 175 Ton Polar Crane 450A*

Backup Fuse 150 NA 2MXM-R7A Primary Bkr 20 45 or 70 @ 60A* Stud Tensioner Hoist Backup Fuse 20 NA 2MXM-R7B Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive 2A Backup Fuse 20 NA 2MXM-R7C Primary Bkr 30 45 or 70 @ 90A* S/G Comp 2D Fan Backup Fuse 30 NA 2MXM-R7D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B12 Blower Backup Fuse 20 NA A 2MXM-R7E Primary Bkr 20 45 or 70 V-60A* Ice Cond AHU 2B13 Blower Backup Fuse 20 NA A 2MXM-R8A Primary Bkr 20 45 or 70 (M60A* Incore Inst Drive 2B Backup Fuse 20 NA 2MXM-R8B Primary Bkr 20 45 or 70 @60A* Incore Inst Drive 2C Backup Fuse 20 NA

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-43 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2MXM-R8C Primary Bkr 30 45 or 70 0 90A* S/G Comp 2A Fan Backup Fuse 30 NA 2MXM-R8D Primary Bkr 20 45 or 70 (& 60A* Ice Cond AHU 2B14 Blower Backup Fuse 20 NA A 2MXM-R8E Primary Bkr 20 45 or 70 0 60A* Ice Cond AHU 2B15 Blower Backup Fuse 20 NA A 2MXMA-1 D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A14 Blower Backup Fuse 20 NA A 2MXMA-1E Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump Backup Fuse 20 NA 2A Pump 2A1 2MXMA-2B_

Primary Bkr 40 45 or 70 @ 120A* Lighting-Pnlbd 2LR6 Backup Fuse 40 NA 2MXMA-2C Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 2R18 Backup Fuse 40 NA 2MXMA-2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A1 5 Blower Backup Fuse 20 NA A 2MXMA-3A Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 2LR9 Backup Fuse 25 NA 2MXMA-3B Primary Bkr 20 45 or 70 @ 60A* Ice Cond Equip Access Backup Fuse 20 NA Door 2A 2MXMA-3C Primary Bkr 50 110 or 150 @ 150* Ice Cond Floor Cooling Backup Fuse 50 NA Pump 2A 2MXMA-3D _

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-44 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump Backup Fuse 20 NA 2B Pump 2B1 2MXN-FlC Primary Bkr 60 110 or 150 @ Reactor Coolant Drain Tank 180A* Pump2B Backup Fuse 60 NA 2MXN-F2A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A1 Blower Backup Fuse 20 NA B 2MXN-F2B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A2 Blower Backup Fuse 20 NA B 2MXN-F2C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A3 Blower Backup Fuse 20 NA B 2MXN-F2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A4 Blower Backup Fuse 20 NA B 2MXN-F3A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A5 Blower Backup Fuse 20 NA B 2MXN-F3B Primary Bkr 20 45 or 70 0 60A* Ice Cond AHU 2A6 Blower Backup Fuse 20 NA B 2MXN-F3C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A7 Blower Backup Fuse 20 NA B 2MXN-F3D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A8 Blower Backup Fuse 20 NA B 2MXN-F4A Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 2LR1 Backup Fuse 25 NA 2MXN-F4B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-45 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 30 45 or 70 @ 90A* S/G Comp 2C Fan Backup Fuse 30 NA 2MXN-F4C Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 2LR2 Backup Fuse 25 NA 2MXN-F4D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A9 Blower Backup Fuse 20 NA B 2MXN-F4E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A10 Blower Backup Fuse 20 NA B 2MXN-F5A Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive No 2D Backup Fuse 20 NA 2MXN-F5B Primary Bkr 20 45 or 70 @ 60A* Incore Inst Drive No. 2E Backup Fuse 20 NA 2MXN-F5C Primary Bkr 20 45 or 70 (M60A* Incore Inst Drive No. 2F Backup Fuse 20 NA 2MXN-F5D Primary Bkr 20 45 or 70 0 60A* Cont Floor & Equip Sump Backup Fuse 20 NA 2A Pump 2A2 2MXN-F6A Primary Bkr 25 45 or 70 Q 75A* Lighting Pnlbd 2LR4 Backup Fuse 25 NA 2MXN-F6B Primary Bkr 40 45 or 70 @ 120A* Lighting Pnlbd 2LR5 Backup Fuse 40 NA 2MXN-F6C Primary Bkr 20 45 or 70 @ 60A* Fuel Transfer Sys Reactor Backup Fuse 20 NA Side Fdr 2MXN-F6D I Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A1 1 Blower

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-46 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 20 NA B 2MXN-F7B Primary Bkr 30 45 or 70 @ 90A* Pzr Cavity Booster Fan 2A Backup Fuse 30 NA (Alt Source) 2MXN-F7D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A12 Blower Backup Fuse 20 NA B 2MXN-F7E Primary Bkr 20 45 or 70 a- 60A* Ice Cond AHU 2A13 Blower Backup Fuse 20 NA B 2MXN-F8B Primary Bkr 20 45 or 70 @ 60A* Cont Floor & Equip Sump Backup Fuse 20 NA 2B Pump 2B2 2MXN-F8C Primary Bkr 50 110 or 150 @ Ice Cond Floor Cooling 150A* Defrost Htr 2B Backup Fuse 50 NA 2MXN-R1D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B1 Blower Backup Fuse 20 NA B 2MXN-R1 E Primary Bkr 20 45 or 70 @D 60A* Ice Cond AHU 2B2 Blower Backup Fuse 20 NA B 2MXN-R1F Primary Bkr 30 45 or 70 0 90A* RCP 2A Oil Lift Pump No. 2 Backup Fuse 30 NA 2MXN-R2F Primary Bkr 30 45 or 70 @ 90A* RCP 2B Oil Lift Pump No. 2 Backup Fuse 30 NA 2MXN-R3A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B3 Blower Backup Fuse 20 NA B

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-47 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2MXN-R3B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B4 Blower Backup Fuse 20 NA B 2MXN-R3C Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B5 Blower Backup Fuse 20 NA B 2MXN-R3D Primary Bkr 30 45 or 70 @ 90A* RCP 2C Oil Lift Pump No. 2 Backup Fuse 30 NA 2MXN-R4A Primary Bkr 50 110 or 150 @ Ice Cond Bridge Crane 150A*

Backup Fuse 50 NA 2MXN-R4B Primary Bkr 30 45 or 70 @ 90A* RB Equip Hatch Hoist Backup Fuse 30 NA 2MXN-R4C Primary Bkr 25 45 or 70 @ 75A* S/G Comp 2B Fan Backup Fuse 25 NA 2MXN-R4D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B6 Blower Backup Fuse 20 NA B 2MXN-R4E Primary Bkr 30 45 or 70 @ 90A* RCP 2D Oil Lift Pump No.2 Backup Fuse 30 NA 2MXN-R5D Primary Bkr 175 200 4 525A Ice Cond Equip Pwr Pnlbd Backup Fuse 175 NA 2B 2MXN-R6A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B7 Blower Backup Fuse 20 NA B 2MXN-R6B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B8 Blower Backup Fuse 20 NA B 2MXN-R6C _

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-48 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B9 Blower Backup Fuse 20 NA B 2MXN-R6D Primary Bkr 100 110 or 150 @ Welding Fdr 300A*

Backup Fuse 100 NA 2MXN-R7A Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B10 Blower Backup Fuse 20 NA B 2MXN-R7B Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B131 Blower Backup Fuse 20 NA B 2MXN-RTC Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B12 Blower Backup Fuse 20 NA B 2MXN-R7D Primary Bkr 50 110 or 150 @ Ice Cond Floor Cooling 150A* Pump2B Backup Fuse 50 NA 2MXN-R8D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2B133 Blower Backup Fuse 20 NA B 2MXN-R8E Primary Bkr 20 45 or 70 Q 60A* Ice Cond AHU 2B14 Blower Backup Fuse 20 NA B 2MXN-RSF Primary Bkr 20 45 or 70 @c60A* Ice Cond AHU 2B15 Blower Backup Fuse 20 NA B Backup Fuse 30 NA 2MXNA-2B Primary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 2LR7 Backup Fuse 25 NA 2MXNA-2C Pdmary Bkr 25 45 or 70 @ 75A* Lighting Pnlbd 2LR8 Backup Fuse 25 NA 2MXNA-2D Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A14 Blower

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-49 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 20 NA B 2MXNA-2E Primary Bkr 20 45 or 70 @ 60A* Ice Cond AHU 2A15 Blower Backup Fuse 20 NA B 2MXNA-3A Primary Bkr 20 45 or 70 @ 60A* 2 Ton CRDM Hdlg Jib Backup Fuse 20 NA Crane 2MXNA-3C Primary Bkr 20 45 or 70 C 60A* NC Pump Motor Drain Tank Backup Fuse 20 NA Pump No. 2 2MXNA-3D Primary Bkr 20 45 or 70 0 60A* Ice Cond Equip Access Backup Fuse 20 NA Door 2B SMXD-3E Primary Bkr 15 45 or 70 Q 45* Unit 2 Personnel Lock Backup Fuse 15 NA SMXG-R3G Primary Bkr 20 45 or 70 @ 60A* Standby Makeup Pump to Backup Fuse 20 NA Cont Sump Isol VIv 2NV1012C SMXG-R4F Primary Bkr 20 45 or 70 @ 60A* Standby Makeup Pump to Backup Fuse 20 NA NC Pump Seals Isol VIv 2NV1013C SMXV-2F Primary Bkr 15 45 or 70 @ 45A* Unit 2 Emergency Backup Fuse 15 NA Personnel Lock

3. 600 VAC-Press Htr Pwr Pnls Backup Press Htr Pwr PnI 2A-1A Primary Bkr 90 110 or 125 @ Pressurizer Heaters 1, 2, &

270A* 22 Backup Fuse 90 NA

_ _ _ _ _ _ _ I _ _ _ _ _ I _ _ _ _ I_ _ _ _ _ _

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-50 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Press Htr Pwr PnI 2A-1 B Primary Bkr 90 110 or 125 @ Pressurizer Heaters 5, 6, &

270A* 27 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2A-1C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 9, 10, &

270A* 32 Backup Fuse 90 NA Backup Press Htr Pwr Pnl 2A-2C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 11, 12, 270A* & 35 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2A-2D Primary Bkr 90 110 or 125 @ Pressurizer Heaters 13, 14, 270A* & 37 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2A-2E Primary Bkr 90 110 or 125 @ Pressurizer Heaters 17, 18, 270A* & 42 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-1A Primary Bkr 90 110 or 125 @ Pressurizer Heaters 21, 47, 270A* & 48 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-1B Primary Bkr 90 110 or 125 @ Pressurizer Heaters 26, 53, 270A* & 54 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-1C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 31, 59, 270A* & 60 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-2C

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-51 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 90 110 or 125 @ Pressurizer Heaters 36, 65, 270A* & 66 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-2D Primary Bkr 90 110 or 125 @ Pressurizer Heaters 41, 71, 270A* & 72 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2B-2E Primary Bkr 90 110 or 125 @ Pressurizer Heaters 46, 77, 270A* & 78 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2C-1A Primary Bkr 90 110 or 125 @ Pressurizer Heaters 7, 8, &

270A* 30 Backup Fuse 90 NA Backup Press Htr Pwr Pnl 2C-1B Primary Bkr 90 110 or 125 @ Pressurizer Heaters 19, 20, 270A* & 45 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2C-IC Primary Bkr 90 110 or 125 @ Pressurizer Heaters 24, 51, 270A* & 52 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2C-1D Primary Bkr 90 110 or 125 @ Pressurizer Heaters 29, 57, 270A* & 58 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2C-2C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 34, 63, 270A* & 64 Backup Fuse 90 NA Backup Press Htr Pwr PnI 2C-2D

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-52 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 90 110 or 125 @ Pressurizer Heaters 39, 69, 270A* & 70 Backup Fuse 90 NA Backup Press Htr Pwr Pnl 2C-2E Primary Bkr 90 110 or 125 @ Pressurizer Heaters 44, 75, 270A* & 76 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2D-1A Primary Bkr 90 110 or 125 @ Pressurizer Heaters 3, 4, &

270A* 25 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2D-1B Primary Bkr 90 110 or 125 @ Pressurizer Heaters 15, 16, 270A* & 40 Backup Fuse 90 NA Backup Press Htr Pwr Pnl 2D-1C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 23, 49, 270A* & 50 Backup Fuse 90 NA SMXG-R5A Primary Bkr 90 110 or 125 @ Pressurizer Heaters 28, 55, 270A* & 56 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2D-2C Primary Bkr 90 110 or 125 @ Pressurizer Heaters 33, 61, 270A* & 62 Backup Fuse 90 NA Backup Press Htr Pwr Pni 2D-2D Primary Bkr 90 110 or 125 @ Pressurizer Heaters 38, 67, 270A* & 68 Backup Fuse 90 NA Backup Press Htr Pwr Pnl 2D-2E Primary Bkr 90 110 or 125 @ Pressurizer Heaters 43, 73, 1_

_ 270A*

.* HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-53 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Backup Fuse 90 NA & 74

4. 120 VAC-Panelboards 2KM-19 Primary Bkr 20 45 or 70 ( 60A* RCP 2A Space Htr Backup Fuse 20 NA 2KM-20 Primary Bkr 20 45 or 70 ( 60A* RCP 2C Space Htr Backup Fuse 20 NA 2KN-19 Primary Bkr 20 45 or 70 0 60A* RCP 28 Space Htr Backup Fuse 20 NA 2KN-20 Primary Bkr 20 45 or 70 @ 60A* RCP 2D Space Htr Backup Fuse 20 NA 2KN-27 Primary Bkr 20 36 or 70 @ 60A* Fuel Handling Control Backup Fuse 20 NA Console
5. 250 VDC-Lighting RB Deadlight Pnlbd 2DLD
  1. 1 Primary Bkr 20 40 0 60A Ltg PnI Nos. 2LR1 & 2LR2 Backup Fuse 20 NA RB Deadlight Pnlbd 2DLD
  1. 3 Primary Bkr 20 40 @ 60A Ltg Pnl Nos. 2LR4, 2LR5, &

Backup Fuse 20 NA 2LR6 RB Deadlight Pnlbd 2DLD

  1. 4 Primary Bkr 20 40 @ 60A Ltg PnI Nos. 2LR7, 2LR8, &

Backup Fuse 20 NA 2LR9 RB Deadlight Pnlbd 2DLD

  1. 6 Primary Bkr 20 40 Q 60A Ltg Pnl Nos. 2LR12 Backup Fuse 20 NA RB Deadlight Pnlbd 2DLD
  1. 7 fI
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-54 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 20 40 @ 60A Ltg Pnl Nos. 2LR16 Backup Fuse 20 NA RB Deadlight Pnlbd 2DLD

  1. 9 Primary Bkr 20 40 @ 60A Ltg PnI Nos. 2LR18 &

Backup Fuse 20 NA 2LR17

6. VAC - LC Outage Power Fuse Box 2A Primary Fuse 150 NA Upper Containment Safety Backup Fuse 150 NA Switch 2A Ltg PnI Nos. 2LR1 &

2LR2 Primary Fuse 150 NA Upper Containment Safety Backup Fuse 150 NA Switch 2B Primary Fuse 200 NA Lower Containment Outage Backup Fuse 200 NA Power Distr Pnl 2A Primary Fuse 225 NA Lower Containment Outage Backup Fuse 225 NA Power Distr Pnl 2B

7. 600 VAC -

Containment HVAC Alternate Feeders 2VrB-2A Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air HdIg Unit 2A (Alt Source) 2VTF-2A Primary Fuse 20 NA Incore Instrumentation Rm Air HdIg Unit 2A (Alt Source) 2VTB-2B Primary Bkr 20 45 or 70 @ 60A* Incore Instrumentation Rm Air HdIg Unit 2B (Alt I I_Source)

HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units I and 2 16.8.1-55 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS) 2VTF-2B_

Primary Fuse 20 NA Incore Instrumentation Rm Air Hdlg Unit 2B (Alt Source) 2VRB-2A Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2A (Alt Source) 2VRF-2A Primary Fuse 100 NA Control Rod Drive Vent Fan No. 2A (Alt Source) 2VRB-2B_

Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2B (Alt Source) 2VRF-2B Primary Fuse 100 NA Control Rod Drive Vent Fan No. 2B (Alt Source) 2VRB-2C Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2C (Alt Source) 2VRF-2C Primary Fuse 100 NA Control Rod Drive Vent Fan No. 2C (Alt Source) 2VRB-2D Primary Bkr 100 110 or 150 @ Control Rod Drive Vent Fan 300A* No. 2D (Alt Source) 2VRF-2D Primary Fuse 100 NA Control Rod Drive Vent Fan No. 2D (Alt Source) 2VLB-2A Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 2A (Alt Source) 2VLF-2A Primary Fuse 200 NA Lower Containment Cooling Unit No. 2A (Alt Source) 2VLB-2B_

  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-56 Revision 131

Containment Penetration Overcurrent Protective Devices 16.8.1 TABLE 16.8.1-2 UNIT 2 Containment Penetration Conductor Overcurrent Protective Devices TRIP SETPOINT OR CONT. RATING (AMPERES) RESPONSE DEVICE NO. & TIME SYSTEM POWERED LOCATION (SECONDS)

Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 2B (Alt Source) 2VLF-2B_

Primary Fuse 200 NA Lower Containment Cooling Unit No. 2B (Alt Source) 2VLB-2C Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 2C (Alt Source) 2VLF-2C Primary Fuse 200 NA Lower Containment Cooling Unit No. 2C (Alt Source) 2VLB-2D Primary Bkr 200 250 @ 600A Lower Containment Cooling Unit No. 2D (Alt Source) 2VLF-2D Primary Fuse 200 NA Lower Containment Cooling Unit No. 2D (Alt Source)

8. 600 VAC Rx Fuel Manipulator Crane 2FCSK0002 50 NA Rx Fuel Manipulator Primary Fuse Crane 2FCT80002 50 NA Rx Fuel Manipulator Backup Fuse Crane
  • HFB or HFD Circuit Breaker Test Response Time, Respectively.

McGuire Units 1 and 2 16.8.1-57 Revision 131