Nuclear Property Insurance
ML13081A269
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/20/2013
From: St.Onge R
Southern California Edison Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
Download: ML13081A269 (2)


Text

SOUTHERN CALIFORNIA Richard J. 81. Ong e EDISON Director, Nuclear Regulatory Affairs and Emergency Planning An ED ISON INTERNATlO NA L Company 10 CFR 50.54 March 20, 2013 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance San Onofre Nuclear Generating Station Units 1, 2, and 3

Dear Sir or Madam:

This letter is the report required by 10 CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liabil ity Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2013 policy renewal date:

Policy (Amount) Source Primary Property and Nuclear Electric Insurance Decontamination Liability Limited (NEIL Primary)

Insurance Policy

($500 million)

Decontamination Liability, Nuclear Electric Insurance Decommissioning Liability Limited (NEIL II) and Excess Property Insurance Policy

($2,250 million)

All policies prov iding coverage mentioned above comply with 10 CFR 50.54(w),

including provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.

P.O. Box 128 San Clemente, CA 92672

Document Control Desk March 20, 2013 There are no commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Mark Morgan, Licensing Lead, at (949) 368-6745.

Sincerely, cc: E. E. Collins, Regional Administrator, NRC Region IV J. E. Whitten, Region IV, San Onofre Unit 1 R. Hall, NRC Project Manager, San Onofre Units 2 and 3 B. Benney, NRC Project Manager, SONGS Units 2and 3 J. C. Shepherd, NRC Project Manager, San Onofre Unit 1 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3