Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML13066A509
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/28/2013
From: Olson E W
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, RBG-47328
Download: ML13066A509 (3)


Text

)Entergya Entergy Operations, Inc.River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4374 Eric W. Olson Site Vice President RBG-47328 February 28, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

REFERENCES:

River Bend Station Overall Integrated Plan In Response To March 12, 2012, Commission Order Modifying License With Regard To Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

River Bend Station -Unit 1 Docket No. 50-458 License No. NPF-47 1. NRC Order Number EA-1 2-051, Order To Modify Licenses With Regard To Reliable Spent Fuel Pool (SFP) Instrumentation, dated March 12, 2012 (Agencywide Document Access and Management System (ADAMS) Accession No. ML12054A682) (RBC-51011)

2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 (ML 12221A339)
3. Nuclear Energy Institute (NEI) 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA-12-051, August 2012 (ML12240A307)
4. Entergy letter to NRC (RBG-47303),lnitial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-05 1), dated October 24, 2012

Dear Sir or Madam:

On March 12, 2012, the NRC issued an order (Reference

1) to Entergy Operations, Inc.(Entergy).

Reference 1 was immediately effective and directs River Bend Station (RBS) to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in the Enclosure of Reference 1.Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (Reference

2) was issued August 29, 2012, and endorses industry guidance document NEI 12-02, Revision 1 (Reference 3), with clarifications and exceptions identified in Reference
2. Reference 3 provides direction regarding the content of this Overall Integrated Plan. The purpose of this letter is to provide that Overall Integrated Plan pursuant to Section IV, Condition C.1 .a, of Reference 1.Aoo RBG-47328 Page 2 of 3 Reference 3, Appendix A-2 contains the specific reporting requirements for the Overall Integrated Plan. The enclosure to this letter provides River Bend Station's Overall Integrated Plan pursuant to Appendix A-2 of Reference
3. Reference 4 provided the RBS initial status report regarding reliable spent fuel pool instrumentation, as required by Reference
1. Entergy has not yet identified any impediments to compliance with the Order, i.e., within two refueling cycles after submittal of the integrated plan, or December 31, 2016, whichever is earlier.Future status reports will be provided as required by Section IV, Condition C.2, of Reference 1, and pursuant to Appendix A-2-3 of Reference 3 which will discuss any changes in compliance method, schedule, and any need for relief including basis.This letter contains no new regulatory commitments.

Should you have any questions regarding this submittal, please contact Mr. Joseph Clark, Manager -Licensing, at 225-381 -4177.I declare under penalty of perjury that the foregoing is true and correct; executed on February 28, 2013.Sincerely, EWO/JCR/JAC/wjf

Enclosure:

RBS Overall Integrated Implementation Plan For Reliable SFP Instrumentation cc: U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.Arlington, TX 76011-4511 NRC Resident Inspector R-SB-14 Ms. Tracie Lowrey Public Utility Commission of Texas 1701 N. Congress Ave.Austin, TX 78711-3326 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS O-8B1 11555 Rockville Pike Rockville, MD 20852-2738 RBG-47328 Page 3 of 3 cc: (continued)

U. S. Nuclear Regulatory Commission ATTN: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission ATTN: Robert J. Fretz Jr.Mail Stop OWFN/4A15A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Robert L. Dennig Mail Stop OWFN/10E1 11555 Rockville Pike Rockville, MD 20852-2378 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section ATTN: JiYoung Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 U. S. Nuclear Regulatory Commission ATTN: Ms. Lisa M. Regner Mail Stop OWFN/1 1 F1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Mr. Blake A. Purnell Mail Stop OWFN/12D20 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission ATTN: Mr. Steven R. Jones Mail Stop OWFN/10A1 11555 Rockville Pike Rockville, MD 20852-2378