Email from J. Mitman, NRR to F. Ferrante, NRR on Ofi - Draft Outline
ML13066A202
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/23/2009
From: Jeffrey Mitman
Office of Nuclear Reactor Regulation
To: Ferrante F
Office of Nuclear Reactor Regulation
References
FOIA/PA-2012-0325
Download: ML13066A202 (1)


Text

Mitman, Jeffrey From:

Mitman, Jeffrey Sent:

Wednesday, Dec mber 23, 2009 2:36 PM To:

Ferrante, Fernando IN Cc:

James, Lois

/

Subject:

OFI - draft outline Fernando, here is a rough outline of the topics to be covered. This list is probably not complete. It also may include items that are not worthy of inclusion. It is intended to be a starting point.

Keep in mind that the write-up should be brief, hopefully less than 2 pages.

Jeff (date) SDP white finding on SSF hole in wall (date) Realization that NSAC 60 calculated dam failure frequency incorrectly (date) DRA calculated dam failure frequency -2E-4 per year (documented in whitepaper on 9/8/2009) 8/15/2008 50.54(f) letter to Duke asks 3 questions 09/26/2008 Duke response to 50.54(f) letter answers 3 questions 0

o CCDP = 1 0

1/2009 Phone call in which Duke states Jocassee Dam failures are credible 4/30/2009 NRC letter to stating Duke has not demonstrated AP and requesting:

o Duke has not demonstrated adequate protection o

sensitivity analysis o

Plan completion by 11/2009 5/11/2009 Meeting at which Duke supplies preliminary inundation results and sensitivity analysis

  • Duke letter requests 30 days additional time 5&20i2009 6/10/2009 Duke letter supplies tentative project schedule 7/9/2009 Duke letter supplies key deliverable milestone dates 8/12/2009 NRR completes JOC - OK for ONS to operate for 2 years without corrective action 9/1/2009 NRR completes initial draft of Backfit Exclusion Documented Analysis 10/20009 meeting at which Duke supplies details of o

101 1D cases o

3 2D cases 11/30/2009 Duke letter with plan for CAR o

Plan to be completed by 11/2010 at which time Duke will know what they intend to do.

Additional topics to be considered for addition:

summary of overtopping (Mitman to supply write-up) summary of seismic concern Duke to complete dam PRA by 3/2010 - not sure this needs to be included!

hydrologists visit to Duke 2Q 2009

/

~o