ML13059A281

From kanterella
Jump to navigation Jump to search
LTR-13-0176 - E-mail Don Leichtling Provides Media Alert - NRC Failing Its Due Diligence Role at San Onofre Nuclear Generating Station
ML13059A281
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/26/2013
From: Hoffman A, Leichtling D
The DAB Safety Team
To: Macfarlane A
NRC/Chairman
Craver, Patti
References
LTR-13-0176
Download: ML13059A281 (3)


Text

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Feb 27, 2013 08:21 PAPER NUMBER:

LTR-13-0176 ACTION OFFICE:

EDO LOGGING DATE:

02/26/2013 I o Lj*es,

-(

MH e--

5Ow AUTHOR:

AFFILIATION:

ADDRESSEE:

SUBJECT:

ACTION:

DISTRIBUTION:

LETTER DATE:

ACKNOWLEDGED SPECIAL HANDLING:

Don Leichtling/i4c2 e xq

  1. 1 Chairman Resource Provides media alert - NRC failing its due diligence role at San Onofre Nuclear Generating Station Appropriate RF, SECY has Ack.

02/26/2013 Yes NOTES:

FILE LOCATION:

ADAMS DATE DUE:

DATE SIGNED:

- tLee §*6L-0 17 (63, S C,11--6

Joosten, Sandy From:

Capt.D [captddd@gmail.com]

Sent:

Tuesday, February 26, 2013 3:32 PM To:

Capt D

Subject:

Media Alert: NRC failing its due diligence role at San Onofre Media Alert The DAB Safety Team: February 26, 2013 Media

Contact:

Don Leichtling (619) 296-9928 or Ace Hoffman (760) 720-7261 NRC failing its due diligence role at San Onofre The DAB Safety Team through its anonymous Expert Panel concludes-that the NRC is not thoroughly reviewing the SCE, Westinghouse, AREVA and MHI Unit 2 Return to Service analyses, because understanding these analyses is a very complex and time-consuming task. Furthermore, these analyses contain many contradictions, over conservatism, ambiguity and invalidated assumptions.

Based on a review of NRC Public and NRC Commissioner's Meetings, the DAB Safety Team Expert Panel further concludes that SCE, NRC and MHI are all now in the mode of justifying restarting Unit 2 at low power and operating it for a long time. Likewise, NRC-NRR management is not asking sharp safety-related questions at these web-cast meetings. Without sharp questioning, these "false-strategies" will not lead to the Correct Root Cause of the San Onofre's highly complex Replacement Steam Generator (RSG) degradation issue. Any tests MHI conducts in Japan or at San Onofre under NRC Supervision appear to be little more than an attempt to support MHI's present Anti Vibration Bar (AVB) design with some minor modifications. Yet we doubt any such design will ever be used again anywhere in the industry, and San Onofre's already damaged RSGs are simply not capable of meeting the Federal Regulations for Design Bases Accidents and anticipated operational transients. Southern Californians should not allow SCE to restart Unit 2 without complete steam generator replacement, a NRC 50.90 License Amendment along with Trial-Like Public Hearings. San Onofre with only one unit operating at 70% power along with planned/accidental outages, cannot fulfill SCE's claim of providing uninterrupted, reliable power and voltage support to the electrical grid 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 days a week. The CPUC should not allow SONGS to continue as a base-load generation plant nor should Southern California ratepayers have to pay for it. Additionally, current law in California forbids "new" reactors until the spent fuel waste problem is solved, and every third 1

"refueling" a completely new reactor has in fact been placed inside the other-wise normal power plant, thus violating the spirit and letter of California state law. San Onofre should be decommissioned.

This press release will be posted on the web at this link: DAB Safety Team Documents.

The DAB Safety Team: Don, Ace and a BATTERY of safety-conscious San Onofre insiders plus industry experts from around the world who wish to remain anonymous. These volunteers assist the DAB Safety Team by sharing knowledge, opinions and insight but are not responsible for the contents of the DAB Safety Team's reports. We continue to work together as a Safety Team to prepare additional: DAB Safety Team Documents, which explain in detail why a SONGS restart is unsafe at any power level without a Full/Thorough/Transparent NRC 50.90 License Amendment and Evidentiary Public Hearings. For more information from The DAB Safety Team, please visit the link above.

Our Mission: To prevent a Trillion Dollar Eco-Disaster like Fukushima, from happening in the USA.

Copyright February 26, 2013 by The DAB Safety Team. All rights reserved. This material may not be published, broadcast or redistributed without crediting the DAB Safety Team. The contents cannot be altered without the Written Permission of the DAB Safety Team Leader and/or the DAB Safety Team's Attorney.

2