UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 14,2013 Mr. E. Patrick Mcintyre, Jr.

Executive* Director Tennessee Historical Commission Department Of Environment And Conservation 2941 Lebanon Road .

Nashville, TN 37243-0442

SUBJECT:

. SEOUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Mcintyre:

The U:S. Nuclear Regulatory Commission (NRC) is ,conducting an environmental review of the effects* of renewing the operating license for Sequoyah Nuclear Plant (SON), Units 1 and 2.

SON is located in Hamilton County, Tennessee, approximately 6 miles east of Soddy-Daisy, Tennessee, on a peninsula on the western shore of the Chickamauga Reservoir. SON is operated bythe Tennessee Valley Authority (TVA). The application for renewal was submitted by TVA in a letter dated January 15, 2013, pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54).

The NRC has established that, as part of the staffs review of any nuclear power plant license renewal application, a site-specific Supplemental Environmental Impact Statement (SEIS) to its

. "Generic Environmental Impact Statement for License Renewal of Nuclear Plants,>> NUREG 1437, will be prepared under 10 CFR Part 51, the NRC's regulation that implements the National Environment Policy Act of 1969, as amended (NEPA). Through this letter, the NRC is initiating consultation under Section 106 of the National Historic Preservation Act (NHPA) with the Tennessee Historical Commission. In accordance with 36 CFR 800.8(c), the NRC will comply with the obligations required under Section 106 of the NHPA through its NEPAprocess.

The final SEIS will ihclude analyses of pertinent environmental issues, and in accordance with 36 CFR 800.8(c), .analyses of potential impact to historic properties and other cultural resources.

In the context of NHPA, NRC staff has determined that the area of potential effects (APE) for a license renewal action is the area at the power plant site and its immediate environs that may be impacted by post-license renewal land-disturbing operations or projected refurbishment activities associated with the proposed action. The APE may extend beyond the immediate environs in those instances where post-license renewal land-disturbing operations or projected refurbishment activities specifically related to license renewal may potentially have an effect on known or proposed historic sites. This determination is made irrespective of ownership or control of the lands of interest.

E. Mcintyre, Jr. -2 Please submit any comments that you may have on the scope of the environmental review by April 15, 2013. Written comments should be submitted by mail to:

Chief, Rules, Announcements, and Directives Branch Division of Administrative Services Office of Administration Mailstop TWB-05-B01 M U.S. Nuclear Regulatory Commission Washington, DC 20555 Electronic comments may be submitted to the NRC by accessing www.regulations.gov.

The SON license renewal application is available at:

http://www.nrc.gov/reactors/operating/licensing/renewal/applications/seguoyah.html.

The NRC plans to hold two public environmental scoping meetings on April 3, 2013, at Soddy Daisy City Hall, 9835 Dayton Pike, Soddy Daisy, TN 37379. The first meeting will convene at 2:00 pm and will continue until 4:00 pm, as necessary; the second meeting will convene at 6:00 pm and will continue until 8:00 pm, as necessary. The NRC expects to publish the draft SEIS on February 10, 2014. A copy of the document will be sent to you for your review and comment. After consideration of public comments received, the NRC will prepare a final SEIS, which is scheduled to be issued in September 30, 2014.

If you have any questions concerning the NRC's review of this license renewal application, please contact Emily Larson, social scientist, at 301-415-1151 or bye-mail at Emily.Larson@nrc.gov.

Sincerely,

~(wr}

Melanie C. Wong, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosures:

1. Area Map, 50-mile radius
2. Area Map, 6-mile radius
3. SON Site Area Map cc w/encls: Listserv

AREA MAP, 50-MILE RADIUS

,,?(l<'

Vilil"Buren Legend

  • Site Cenh~1

.-.. -oJ 50-Milo Radiu:;

~ Airport

-"Interstate

- - U.S. Route

t4> SUlface \l'Jate-r .---. R~ilvi~y Cjtic~ ~. 1own~
  • *-===* * * * *C===:::::J1Miles County o 10 20 30 Stoto ENCLOSURE1

AREA MAP MILE RADIUS SOd{j}

H f11 i n Legend

  • A.

S~te Cerner Recreation Entrance Local

...... Boa: Ramp State _-===_-===______ Miles

.-.! 5*MJ!e Radius III i'eceral o 2 4

.: Cities and Towns ENCLOSURE 2

SQN SITE BOUNDARY t Y~ud Dr.Jinoge P6tld tUnltn~<h M~t.,t GloanHlg \Na'.1t~ r.'}nd fLtn.cdr

~ fActo' CI~~ning \/\ro~tf: P'ond fUn!i~~d}

.:L tr.w,r Volume \/\la!-lte Tt~iHment Pond {LiNed)

5. CCW Ohtch::Hg~ ChnntlfuJ ,lJolillll(1)

B.. OiffUS'::f Pond ,tVnllnrrd)

(USDA 20081 Legend

  • ' Sit" Center Pr{Itected Are'a

___==-_ _==-______ Fut Site Fedtwes o 500 1,000 2:000 Sit" EXC!U5ionAr~" 80undary I Ell,8, ENCLOSURE 3

E. Mcintyre, Jr. - 2 Please submit any comments that you may have on the scope of the environmental review by April 15, 2013. Written comments should be submitted by mail to:

Chief, Rules, Announcements, and Directives Branch Division of Administrative Services Office of Administration Mailstop TWB-05-B01 M U.S. Nuclear Regulatory Commission Washington, DC 20555 Electronic comments may be submitted to the NRC by accessing www.regulations.gov.

The SON license renewal application is available at:

http://www.nrc.gov/reactors/operating/licensing/renewal/applications/sequoyah.html.

The NRC plans to hold two public environmental scoping meetings on April 3, 2013, at Soddy Daisy City Hall, 9835 Dayton Pike, Soddy Daisy, TN 37379. The first meeting will convene at 2:00 pm and will continue until 4:00 pm, as necessary; the second meeting will convene at 6:00 pm and will continue until 8:00 pm, as necessary. The NRC expects to publish the draft SEIS on February 10, 2014. A copy of the document will be sent to you for your review and comment. After consideration of public comments received, the NRC will prepare a final SEIS, which is scheduled to be issued in September 30, 2014.

If you have any questions concerning the NRC's review of this license renewal application, please contact Emily Larson, social scientist, at 301-415-1151 or bye-mail at Emily. Larson@nrc.gov. .

Sincerely, RAI Melanie C. Wong, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosures:

1. Area Map. 50-mile radius
2. Area Map, 6-mile radius
3. SQN Site Area Map cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession Nos: ML13058A225 (PKG), ML13058A180 (LTR), ML13058A212 (ENC.)
  • concurred via email OFFICE LA:DLR:RPB2* I PM:DLR:RPB2 RERB Technical BC:DLR:RERB Staff Member NAME IKing ESayoc ELarson MWong DATE 3/5/13 3/7/13 3/11/13 3/14/13 OFFICIAL RECORD COpy