Planned Inspection of TI-186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats at Palo Verde Nuclear Generating Station
ML13051B135
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/20/2013
From: Vincent Gaddy
Operations Branch IV
To: Edington R
Arizona Public Service Co
References
Download: ML13051B135 (3)


Text

February 20, 2013 Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034

SUBJECT:

PLANNED INSPECTION OF TI-186 INSPECTION OF PROCEDURES AND PROCESSES FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS AT PALO VERDE NUCLEAR GENERATING STATION

Dear Mr. Edington:

In a telephone conversation on January 10, 2013, Mr. S. Hedger, Operator Licensing Branch, and Ms. M. Ray, Director, Emergency Preparedness/Security, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI)-186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, at Palo Verde Nuclear Generating Station. This inspection is planned for the week of May 20, 2013. The NRC inspectors request to observe a tabletop or control room simulator exercise, combined with plant walkthroughs with plant operators to allow inspection of TI-186 attributes. Ms. M. Ray has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. S. Hedger at 817-200-1556, or me at 817-200-1159.

Sincerely,

/RA/

Vince Gaddy, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74 cc: Electronic Distribution for Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Tony.Brown@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

Administrative Assistant (Revonna.Stuart@nrc.gov)

Branch Chief, DRP/E (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Project Engineer, DRP/E (Dan.Bradley@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA: OEDO (John.Cassidy@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov ADAMS ACCESSION NUMBER ML13051B135 SUNSI Review Completed: __SDH__ ADAMS:

Yes No Initials: __SDH__

Publicly Available Non-Publicly Available Sensitive Non-Sensitive OE:OB C:OB SHedger VGaddy

/RA/

/RA/

02/19/2013 02/20/2013