LTR-13-0140 - Provides Media Alert - San Onofre Legacy (Sol Part 1, 2 and 3)
ML13046A014
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/12/2013
From: Leichtling D
- No Known Affiliation
To:
NRC/Chairman
References
LTR-13-0140
Download: ML13046A014 (3)


Text

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Feb 13, 2013 16:15 PAPER NUMBER: LTR- 13-0140 LOGGING DATE: 02/13/2013 ACTION OFFICE:

M&e ONO AUTHOR: Don Leichtling Z(AV AFFILIATION:

ADDRESSEE: Chairman Resource

SUBJECT:

Provides Media Alert - San Onofre Legacy (SOL Part 1, 2 and 3)

ACTION: Appropriate DISTRIBUTION: Chrm, SECY has Ack.

LETTER DATE: 02/12/2013 ACKNOWLEDGED Yes SPECIAL HANDLING: Lead office to publicly release 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SECY's assignment, via SECY/EDO/DPC.

NOTES:

FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:

Joosten, Sandy From: Capt. D [captddd@gmail.com]

Sent: Tuesday, February 12, 2013 6:52 PM To: Capt D

Subject:

Media Alert - San Onofre Legacy (SOL Part 1, 2 and 3)

Media Alert: February 12, 2013 Media

Contact:

Don Leichtling (619) 296-9928 or Ace Hoffman (760) 720-7261 The DAB Safety Team has transmitted the following request to the Offices of Chairman Of The NRC, California Attorney General and Senator Barbara Boxer's Committee on Environment and Public Works (EPW).

The DAB Safety team has released three Media Alerts today, together they describe the current situation at San Onofre, along with what SCE, their experts and other

-nuclear watchdogs are now saying about all the questions that have been asked by the NRC:

.SONGS Unit 2 Fluid Elastic Instability, Thermal-Hydraulic Modelin*, "- Enllghtenifg&D r.Pettgrew, Concerned/Frustrated NRC Commissioners and Main Steam Break (28 Pages) snip:

The following paper shows that the entire NRC Regulatory Process is underfunded, broken and needs additional funding, oversight and extensive overhaul to ensure public safety.

2. 'SEVs Dismal anddUnconvincing Performance before NRC Commissioner"s (13 Pages) snip:

The presentation by SCE, Mitsubishi and other experts to the NRC was very disappointing and disturbing to 8.4 million Southern Californians. The presentation did not address U.S. Sen. Barbara Boxer and Congressman Edward J. Markey's concerns expressed on February 6, 2013 in her letter to NRC Chairman McFarlane, "Southern California Edison was aware of problems with replacement steam generators at its San Onofre nuclear power plant but chose not to make fixes.

3. UnitI2 Retainer Bars Integrity Unproven and&Unsafe During a MSLB (12 Pages) snip:

The structural integrity of SONGS degraded retainer bar system to withstand combined loads that result from postulated accident conditions events has not been demonstrated.

These Media Releases have been posted on the web at this link: DAB Safety Team Documents.

The DAB Safety Team. Don, Ace and a BATTERY of safety-conscious San Onofre insiders plus industry experts from around the world who wish to remain anonymous. These volunteers assist the DAB Safety Team by sharing knowledge, opinions and insight but are not responsible for the contents of the DAB Safety Team's reports. We continue to work together as a Safety Team to prepare additional: DAB Safets learn Documents, which explain in detail why a SONGS restart is unsafe at any power level without a Full/Thorough/Transparent NRC 50.90 License Amendment and Evidentiary Public Hearings. For more information from The DAB Safety Team, please visit the link above.

Our Mission: To prevent a Trillion Dollar Eco-Disaster like Fukushima, from happening in the USA.

1

Cd1yright February 12, 2013 by The DAB Safety Team. All rights reserved. This material may not be published, broadcast or redistributed without crediting the DAB Safety Team. The contents cannot be altered without the Written Permission of'the DAB Safety Team Leader and/or the DAB Safety Team's Attorney 2