ML13038A396
From kanterella
Jump to navigation
Jump to search
ML13038A396 | |
Person / Time | |
---|---|
Site: | Sequoyah ![]() |
Issue date: | 11/13/2012 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
LRA-1, 2-47W830-5, Rev 0 | |
Download: ML13038A396 (1) | |
Similar Documents at Sequoyah | |
---|---|
Category:Drawing
MONTHYEARML24247A1722024-08-28028 August 2024
[Table view]Enclosure 4: Marked-up Equipment Layout Drawings for SQN Units 1 & 2 ML14125A2702014-05-0202 May 2014 Missing Jam Nuts on Size 4, Pressure Class 600 Normally Open, In-Line Check Valve Per Flowserve Drawing No. 07-45546-01 ML13038A5042013-01-13013 January 2013 License Renewal Application, Drawing LRA-1,2-47W852-2, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains ML13038A3452013-01-0202 January 2013 License Renewal Application, Drawing LRA-1-47W838-2, Revision 0, Flow Diagram - Mechanical Condensate Demineralizer Unit 1 Condensate Polishers ML13038A5222012-12-13013 December 2012 License Renewal Application, Drawing LRA-1,2-47W856-1, Revision 0, Flow Diagram Demineralized Water and Cask Decon System ML13038A5072012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-4, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains ML13038A4702012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W844-4, Revision 0, Mechanical Flow Diagram Raw Cooling Water ML13038A4772012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W848-1, Revision 0, Compressed Air System Flow Diagram ML13038A5062012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-3, Revision 0, Mechanical Flow Diagram Floor and Equipment Drains ML13038A5082012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-5, Revision 0, Mechanical Flow Diagram Roof Dr & Floor Eqpt Dr ML13038A5092012-12-12012 December 2012 License Renewal Application, Drawing LRA-1,2-47W852-6, Revision 0, Mechanical Flow Diagram Floor & Equipment Drains ML13038A5592012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W881-8, Revision 0, Mechanical Flow Diagram Water Quality and Sampling System ML13038A3822012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W814-1, Revision 0, Flow Diagram Ice Condenser System ML13038A4562012-12-0404 December 2012 License Renewal Application, Drawing LRA-1,2-47W834-2, Revision 0, Flow Diagram Make Up Water Treatment and Demineralizers ML13038A4732012-12-0303 December 2012 License Renewal Application, Drawing LRA-1,2-47W845-2, Revision 0, Mechanical Flow Diagram - Essential Raw Cooling Water System ML13038A4962012-11-30030 November 2012 License Renewal Application, Drawing LRA-1,2-47W850-5, Revision 0, Flow Diagram - Transformer Yard & Makeup Water Treatment Plant Hpfp ML13038A3642012-11-30030 November 2012 License Renewal Application, Drawing LRA-1-47W881-1, Revision 0, Flow Diagram Water Quality and Sampling System ML13038A3752012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-4, Revision 0, Flow Diagram CVCS Chemical Control ML13038A4612012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W838-4, Revision 0, Mechanical Flow Diagram Waste Disposal ML13038A4622012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W838-7-1, Revision 0, Mechanical Flow Diagram Filter System and Utilities ML13038A4592012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-2, Revision 0, Flow Diagram Potable Water Distribution System ML13038A4602012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-4, Revision 0, Flow Diagram Potable Water Distribution System ML13038A3882012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W816-2, Revision 0, Flow Diagram Diesel Generator Lube Oil System ML13038A3362012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W802-1, Revision 0, Flow Diagram Extraction System ML13038A3782012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-7, Revision 0, Flow Diagram Flood - Mode Boration Makeup System ML13038A3572012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W801-1, Revision 0, Flow Diagram Condensate ML13038A3762012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-5, Revision 0, Flow Diagram CVCS Chemical Control ML13038A3722012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-2, Revision 0, Flow Diagram CVCS Chemical Control ML13038A3682012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W804-2, Revision 0, Flow Diagram Condensate ML13038A3692012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W805-3, Revision 0, Flow Diagram High Pressure and Low Pressure Heater Drains and Vents ML13038A3742012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W809-3, Revision 0, Flow Diagram CVCS Chemical Control ML13038A3662012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W803-2, Revision 0, Flow Diagram Auxiliary Feedwater ML13038A3592012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W801-2, Revision 0, Flow Diagram Steam Generator Blowdown System ML13038A3672012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W803-3, Revision 0, Flow Diagram Auxiliary Feedwater ML13038A3702012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W805-4, Revision 0, Flow Diagram High Pressure and Low Pressure Heater Drains and Vents ML13038A5752012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W805-2, Revision 0, Flow Diagram Low Pressure Heater Drains & Vents ML13038A3792012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W810-1, Revision 0, Flow Diagram Residual Heat Removal System ML13038A3382012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W805-01, Revision 0, Flow Diagram High Pressure Heater Drains and Vents ML13038A3402012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W807-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping ML13038A4582012-11-21021 November 2012 License Renewal Application, Drawing LRA-1,2-47W835-1, Revision 0, Flow Diagram Potable Water Distribution System ML13038A5802012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W811-2, Revision 0, Flow Diagram Mechanical SIS Upper Head Injection Abandoned in Place ML13038A5772012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W809-1, Revision 0, Flow Diagram Chemical & Volume Control System ML13038A5762012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W807-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping ML13038A5742012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W805-1, Revision 0, Flow Diagram High Pressure Heater Drains and Vents ML13038A5732012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W804-1, Revision 0, Flow Diagram Condensate ML13038A5722012-11-21021 November 2012 License Renewal Application, Drawing LRA-2-47W802-1, Revision 0, Flow Diagram Extraction Steam ML13038A3412012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W809-1, Revision 0, Flow Diagram Turbine Drains and Miscellaneous Piping ML13038A3432012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W811-2, Revision 0, Flow Diagram Mechanical SIS Upper Head Injection Abandoned in Place ML13038A3392012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W805-2, Revision 0, Flow Diagram Low Pressure Heater Drains & Vents ML13038A3372012-11-21021 November 2012 License Renewal Application, Drawing LRA-1-47W804-1, Revision 0, Flow Diagram Condensate 2024-08-28 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARCNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024
[Table view]Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea ML24247A1752024-08-28028 August 2024 Enclosure 1: Description and Assessment of the Proposed Changes CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML22115A0022022-05-17017 May 2022 Correction to Amendment No. 350 Regarding One-Time Change to Technical Specification3.4.12, Low Temperature Overpressure Protection System, CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) ML22125A1272022-05-0404 May 2022 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-02-24024 February 2022 License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06)2021-10-22022 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-042, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05)2020-04-17017 April 2020 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05) CNL-20-010, Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-02-24024 February 2020 Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-16016 November 2019 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-005, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01)2019-02-0101 February 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) CNL-17-150, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)2018-03-0909 March 2018 Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) .. CNL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) .2018-02-0808 February 2018 Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) . NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-008, License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, QPTR, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) NL-17-008, Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014)2017-08-0707 August 2017 Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) CNL-16-051, Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-03-13013 March 2017 Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days2016-07-22022 July 2016 Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-05-26026 May 2016 Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-018, License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-05-16016 May 2016 License Amendment Request (SQN-TS-16-03) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-15-178, License Renewal Application - Clarifications2015-08-28028 August 2015 License Renewal Application - Clarifications CNL-15-164, Second Annual Update, License Renewal Application2015-08-14014 August 2015 Second Annual Update, License Renewal Application CNL-14-075, Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82014-05-27027 May 2014 Redacted Version of License Amendment Request (SQN-TS-14-01) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) ML13281A8062013-08-0606 August 2013 Operating License Renewal, Site 40HA22 and Revision to Phase I Cultural Resources Survey Final Report, Hamilton County, Tn ML13199A2812013-07-0303 July 2013 Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) 2024-08-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML13038A396&oldid=5242745"