FENOC Beaver Valley Power Station FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Paul A. Harden 724-682-5234 Site Vice President Fax: 724-643-8069 January 24, 2013 L-12-458 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Steam Generator Inspection Reports - Technical Specifications 5.6.6.2.2 and 5.6.6.2.4 In accordance with Technical Specifications 5.6.6.2.2 and 5.6.6.2.4, FirstEnergy Nuclear Operating Company hereby submits two reports containing tube inspection results for the Beaver Valley Power Station, Unit No. 2 steam generators. The enclosed reports provide information required by the technical specifications that was obtained during inspections conducted during the fall 2012 refueling outage.
A Regulatory Commitment is identified in the Attachment to this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager-Fleet Licensing, at (330) 315-6810.
incerel Paul A. Harden
Attachment:
Enclosures:
A Beaver Valley Unit 2 End-of-Cycle 16 Voltage-Based Repair Criteria 90-Day Report B
Unit #2 - 2R16 Steam Generator F* (F Star) Report
Beaver Valley Power Station, Unit No. 2 L-12-458 Page 2 cc:
NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative
...p Attachment L-1 2-458 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Beaver Valley Power Station, Unit No. 2 (BVPS-2) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments. Please notify Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 315-6810 of any questions regarding this document or associated Regulatory Commitment.
Regulatory Commitment Due Date
- 1. FENOC has committed to remove the required amount of Prior to startup tube support plate intersections during 2R17 in from the BVPS-2 accordance with Attachment 1, Section 4 of GL 95-05.
spring 2014 refueling outage.
Enclosure A L-12-458 Beaver Valley Unit 2 End-of-Cycle 16 Voltage-Based Repair Criteria 90-Day Report (58 Pages Follow)