ML13024A368
ML13024A368 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 01/24/2013 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Jacobs D Entergy Operations |
References | |
Download: ML13024A368 (4) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NGTON , TEXAS 7 601 1- 4511 January 24, 2013 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (INSPECTION REPORT 05000382/2013003) AND REQUEST FOR INFORMATION
Dear Ms. Jacobs:
From April 8-19, 2013, reactor inspectors from NRCs Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mike Mason of your licensing organization.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.
D. Jacobs In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket No: 05000382 License No: NPF-38
Enclosure:
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Request for Information CC: Electronic Distribution for Waterford Steam Electric Station, Unit 3
D. Jacobs Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Marlone.Davis@nrc.gov)
Resident Inspector (Dean.Overland@nrc.gov)
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
Branch Chief, DRP/E (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
Project Engineer, DRP/E (Dan.Bradley@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Kaly.Kalyanam@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
OEMail Resource R:\ REACTORS\WAT\WT3 2013005-RFI-130114.docx ML13024A368 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GAG Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/EB1: SRI C:
G. George T. Farnholtz
/RA/ /RA/
1/22/13 1/24/13 OFFICIAL RECORD COPY
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Inspection Request for Information Inspection Report: 05000382/2013003 Inspection Dates: April 8-19, 2013 Inspection Procedure: IP 71111.17, Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications Lead Inspector: Gerond George, Senior Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of Gerond George by April 2, 2013, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Also, we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
- 1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since July 18, 2008, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.
- 2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment since July 18, 2008. Note: Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.
- 3. Waterford Steam Electric Station, Unit 3, procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
- 4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations from July 18, 2008, to the present.
- 5. A list with descriptions of all permanent plant modifications since July 18, 2008. Include sufficient detail to enable the inspector to determine the significance of each modification. For this inspection, permanent plant modifications include permanent plant Enclosure
changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.
- 6. Waterford Steam Electric Station, Unit 3, procedure for implementing and controlling permanent plant modifications.
- 7. A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since July 18, 2008. Include sufficient detail to enable the inspector to determine the significance of each modification.
- 8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.
- 9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.
Inspector Contact Information:
Gerond George John Watkins Megan Williams Senior Reactor Inspector Reactor Inspector Reactor Inspector 817-200-1562 817-200-1381 817-200-1076 Gerond.George@nrc.gov John.Watkins@nrc.gov Megan.Williams@nrc.gov Mailing Address:
U.S. NRC, Region IV Attn: Gerond George 1600 East Lamar Blvd.
Arlington, TX 76011-4125 Enclosure