ML13014A096
| ML13014A096 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/10/2013 |
| From: | Mahesh Chawla Division of Operating Reactor Licensing |
| To: | Hassoun A Detroit Edison |
| References | |
| TAC MF0445 | |
| Download: ML13014A096 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Chawla, Mahesh Sent:
Thursday, January 10, 2013 1:43 PM To:
Alan I Hassoun
Subject:
LIC-109 Acceptance Review - LAR to change licensee name on the operating license (MF0445)
By letter dated December 21, 2012 (ADAMS Accession No. ML13002AD21), Detroit Edison Co. submitted a license amendment request for Fermi 2. The proposed amendment request would modify the Fermi 2 operating license change its name on the license to DTE Electric Company.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-8371.
Hearing Identifier:
NRR_PMDA Email Number:
577 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20130110134200)
Subject:
LIC-109 Acceptance Review - LAR to change licensee name on the operating license (MF0445)
Sent Date:
1/10/2013 1:42:58 PM Received Date:
1/10/2013 1:42:00 PM From:
Chawla, Mahesh Created By:
Mahesh.Chawla@nrc.gov Recipients:
"Alan I Hassoun" <hassouna@dteenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2274 1/10/2013 1:42:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: