SNCV061-RPT-01, Ver 1.0, Vogtle Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 6 of 20
ML13003A246
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/26/2012
From: Volodarsky D
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2270 SNCV061-RPT-01, Ver 1.0
Download: ML13003A246 (39)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet z1of2:Status:QDN U'Seismic Walkdown Checklist (SWC)Equipment ID No. I- ,!S- si!ý, Equip, Class'Equipment Description i?7-%v --v y ý" - Location:

Bldg.,, dac vE-'. Floor:El. Room, Area. I .3 Manufacturer,-Model,.Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may beused to document the resiolts of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following

questions miay be usedl to record the results ofjudgments and findings.

Additional space is provided at the.end of this checklist for documentingother comments.Amchorate, (-5 V: v~ r 1. Is the anchorage c6ofiguration verification required (Le., is i item one YO NEI of the 50% of SWEL items 'rquirinig such verificat, Iion)?2. is the anchorage free of bent, broken,ý missing. or oose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the, anchorage free ofvisible cracks in the qcncrete near theanchors?

5.i Is the "anchorage configuration' consistent with plant documnentation?(Note: This question only applies ifthe item' is one of the :50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is'the anchorage free of potentially adverse seismic conditions?

YE NE UE- N/A]YE NO YE NEI UE N/AL1 YE NEO UE N/Ar, YE NE P 2 equipment class nameu.from Appendix B: Classes of Equipment.

c, PAGE 194 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 2 of.2 Seismic Walkdown Checklis~t (SW.C)E~quipment IDbNo. -i 5~6- Equip Class`EquipmentDe~scription S ,5 SY y : --rI .'7. AeMso ft targets free frbrho impatt by neaby equipment orstructures?

8. Are'overhead eqquipmnent distribution systems, ceiling tiles and lighting,:and masonry block wallsnot likely to collapse onto the equipment?

90, Do attached-lines have adequate flexibility to aVoid damage?10. Based on the above seismic interaction evaluatiIons,is equipment free of potentially, adverse seismic interaction effects?YEI NE UE N/AL]YE NE Un N/AED YEI .N.E UE] N/AE]Yn NE UEr Other Adverse Conditions 1I., Hive you looked foi',and found no other seismic conditions that could X'-NE1 UE-adversely affectthe safety functions of the equipment!?

Comments (Addimionalpages may'be added as niecessary)

~ ~ -S~~-~f.v-Ook*,.. 1 A ~ ~..U LATh31.' 'H1, TSE AP~o Th ~ ~ VLI0cM Tb.'- ~ ~ -FU1 C,-"mQ *ft-r Owrq 9-S -Zs Evaluatcd by:;. ~ s Ccc Date: S z~ ~-., C-4 >-PAGE 195 of 668 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIONOO PAGE 196 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 I PAGE 197 of 668 9 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCV061-RPT-01, VERSION 1.0PAGE 198 of 668 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIO .0:k ndcta w6 teIkia bal tJaw a lkveI hold Shift t PAGE 199 of 668 9 ACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIO .0 PAGE 200 of 668 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIONOO PAGE 201 of 668

  • [ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIOONO PAGE 202 of 668 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION .0 ,NkAU:KEU GOViE PLA PAGE 203 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 1<.of 21 Status: QN U Seismic Walkdown Checklist (SWC)Equipment ID No./V129-/-)6-

...... Equip. Class" 2 20 EquipmentDescriptiOn A/SP4.4" .11A&'$c5=

/'T 4/Location:

B4dg:.Y/roe:

FloorEl. El _ ... Room, Area ,4o..Manufacturer, Model, Etc. (optional but recommended) 4 -7M -i,(C?('(/15ý,Instructions for Completing Checklist!

This checklist may be-used to'document the-resulisof.the Seismic Walkdown of an item of equipment on the SWEL. Tiespace below each of.the following questions may be used to0record the results ofjudgmients and findings.

Additional space is provided at.the end of this checklist for documenting other comments.Anchorage'

1. Is the anchorage configuratio5n verification.

required.i(c, is the item one,.of the 50% of SWEL itefriis requiring such v6wific6ation)?

YJ NEI 2g.. ste: anchorage frtee of bent, broken, missing or loose hardware?3. sthe.anchorage free of corrosion that is more ihanqI mild suirface 4, Is the anchorage free of yisible cracks in the concrete nearthe anlchors?5; Is~the anchorage configuration.

consistent with plantdocumentation?-(Note: This que~stion only applies~if the. item is one, Of the 50% for, which an~anchorage configuration verification is required)AX,4 4 0/0Ao/o 14-I 6. Based on, the aboveanchorage:evalua:ions, :is the anchorage free of pot'iAtiallya4dves seismic, conditioris?,'YK NO UE1 NIAE Ye4 NEI UE, N/AE1',NO UE N/AE YX NE] UEI N/AE YX NEI UE i2 Enter the eqiipiment class i n diaefr Appeindix B: Qlasses of F2iipmeni.

< C-3; >PAGE 204 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet rof 2 Seismic Walkdown Checklist (SWC)Equ~ipm~ent:

ID No. /-/6 Z ' CEqui. Class: Equipm.entDesicr iption. ' A 6/6/177?Interaction Effects 7. Are soft targets free-fromi impact by nearby equipment or structuies?

.-NEI UE N/1Al 8, Are overheadequipment, distribution systems, ceiigtles and lighting, Y Nl] U] N/A]and masomy block walls not likely to collapse onato ithý eqdipmenIt?

9. Do attached lines have adequate flex'ibility to avoid lda'mage?10. Based on theabove seismic interaction evaluationsp, is equipment free ,of potentialy adverse sesJsmihtijieraction effects?, Other Adverse Conditions, S11. Have you 1o6kNd f6r and fouhd no other seismic conditions Ihat could adversely affect the:safety functionsof the equipment?NOl UE] N/Al]YX' NE Ul]YX N:] Ul Comments (Additional pages may be added as necess y)EFýValuatcd by: A ~ ~ ./ ae '2 2/1Tit[JAkk/k Mlo+4W VJW1 L;xsor\_ ý1-17ý 0 ýl _ _,< C4 >-, PAGE 205 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERS100NO PAGE 206 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 207 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 1 of 2 Status:i N U Seismic Walkdown Checklist (SWC),,quipie~t IDNo.

OOA Equip. Class'`Location::

Bldg. coep!- Floor EL 2ý66 'Room, Area A,4 13 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing.Chefeklist This~checklist may be used't0:document the results of the Seismic Walkdown of an item of equip ent on the SWEL. The space below each of the following questionis may be used'to record the rsults -ofjidgments and.findings.

Additional space: is provided at the end of Ithis checklist for, documenting other comments.i1. Is the anchorage configuration, verificatIionrequired (ies, is the itemonie YO NEI of the'50%. of SWEL itemis requiriitig such iyeificafion)?

2. Is the anchorage:'free of bent,:broken, missing or loose hardware?,3. Is the anclhorag6:free ofcOrrosionthat isimore than mild surfacýe oxidation?

4., Is the anc!h0orage free of'V, isible cracks inf theý concrete near the anchors?5' Is the anchorage configuration consistent with, plant documentation?

,(Note:,This question ~only'appls 0fteie soeo h 0 o which an anchorage configuration verification is r7equired.)

6. Based on the ab0oe afichorage evaluitions, isthe anchora ge free of potentially adverse seismic conditions?

Y[1 NE UE N/AEr]YE NE UE! N/AE]'Y¥7 NO U: N/AE YE NEI WE N/AC YE NEI UEý12 Enter ithe equipmeni class namefrom AppendixB:

Classes'ofEtuiprnent.

C<3>PAGE 208 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 2 of 2 Seismic Walkdown Chec'klist(SWC)

Equipme~nt iD jNQ. It: ~l :- oA Etiip. Class 1`E-juipmeit Descript ion D V?ýAY A Interacticbn Effects F- n/c QW1 z B 1v 7. Are soft targets free,:ffon impact ,b' nearby equipment6or structures?

8. Areoyerbead equipment, distributiorn systems, ceiling tilcs and lighting, and masonry block walls not likely to0collapse onto the-equipment?
9. Do attached lines have adequate flexibility to avoid: damage?10. Based onthe above seismic interaction eValuations, is equipment free of potentially adverse seismic interaction effects?YErl NEU N/OAl YE NE UE N/ADl YE NE- UE] N/AE YO E30 UE Other Adverse Conditions 11., Have you looked for and found, no other seismic conditionsý that could YN, NE] UE-1 adversely affect the safety functions of the equipment?

AO9ICI)'ý

ý-r ý A-#V.iOMMCAL

  • .~ ~- <.: .....C 4 , , ..... .Comments,(Ad&Itional pages may be added as necessary) 715 ,- Co,-, , ! r .V*.Date: Z .IT L, h-< C-4 >': PAGE 209 of 668 ATTCHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERS100NO PAGE 210 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 211 of 668
  • ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIO .0 PAGE 212 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 1. of ..P Status: Y 'N Seismic Walkdawn Checklist'(SWC)

EquipmentlD No. %oý'3 AL Equip. Class 2 3 (_)J. k' V Equipmnent Description

-"IO wI4" ...OL Location:

Bldg. _____O-- Floor El. 00 Room, Area 7_'-Man.ufacturer,:-Model, Etc. (opti"onal but recommended)

...... .-Instructions for Completing Checklist This chtecklikstay be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each ofdite following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist

'or documnenting otiler comments., Anchorame 1. is the anchorage configuration verifiCation required (i.e., is the item one of the' 50% of SWEL items requiring such verification)?

NE3 2.-.Is the anchorage free of bent, brokený, missing or loose hardware?1 lsý the anchorage free ofcorrosionthat ismore than mild surface oxidation?

4. Ts the anchorage fre oflvisible cracks in the concrete iear. the anchors?:5! Is the anchorage configurati on;onsistent With plant"dtcurihieta ion?(Note: This' qiiestionnonly applies if thce.itej is one of.the 50%-for.which an anchorage confiagttionhin verification is required.)
6. Basedowlthe, above anchorage, evaluations, is the anchorage free of poltntially adVerse seismic conditioqns?

YEINO UKN/AE]YE1 NE UWN/A YE NEJ UE N/AN'YO NEIV N/AEI YE-3NE]u 12:E~er the equipment cliiss naime bri.htu ppendtk B: Classe of Equi;rn :e'1T.' C-3 >-PAGE 213 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)EquipmientID No ........ _____2- Equip. Classl'2 okýSS~I ~ ___Equipment Description

+1(0 V, §44~yeq aCi Amz2.Interaction Effects 7. Are soft targets free from ifipact by nearby equipment or Sirctures?

YONE TUE NLAE 8. Are overhead equipment, distribution,.systems, ceiling tiles andlighting, Y " NE UE, N/AEI and'inasonry block Walls not likely to collapse onto the equjpmnent?

9. Do attached lines have adequate fleiXbility to avoid damage? YE NY UE N/AE 2 ~ ~ ~ ~ ~ & d5.Ao.~~"l54b14d~

~ 4 'hpo 10. Based on the above seismic:interaction evaluations, is equipmcntfree of potentially advetse seisicie interaction effects?YE NgUE_.Othei- AdverseConditiohs

1. Have, ou looked-for and found no other seismic conditions that co.ild Y NE1. UE-adversely affect.the safety functions of the e,4iipment?

Comnert~ Additomlagemaye.add ed as'necessarv)

~~~~j ~A " ( dw 1~~ r ix 3'a.( 5, fa A-402- -00 rd4vg~ ~ ~ ~ _____A C-4 >PAGE 214 of 668

  • ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIANO I PAGE 215 of 668

,ACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION .0 PAGE 216 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet I.of 2 Status: C,:N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0 (A A 0. Equip. Class I Equipment Description (ijA OV -t-A 6 Z Location:

B1dg.cnt,, \ Floor El.zoa'-o" Room Area , Manufacturer, Model, Etc. (optional but recommended)" Instructions for Completing Checklist This checklist may be used to documenttthe results of ti h Seismic Walkdown of an item of equipmnenton the SWEL The space below each of the following questions may be used to record. the results ofjudgniients and findings.

Additional space is provided at. the end of this checklist for documenting other Conmments.

1. is the anchorage configturation verification required (i.e., is the::itemrone of ithe. 5013< of SWEL itmi ixequiring.such verification)?

Y09 Nn 2. is the anchorage.

free of bent, broken, missing or loose hardwar6?3. Is the ariciorage free of corrosion that is more than mildlsurface oxidation?

4. Is the anchorage free of visible cracks in the'concreite near the anchors?5 e .C S8 4. a a a .~ r W II J I .5. Is the anchoragc configtration consistdnt wvith plant documentation?(Note: This queStion only ,applies ifthe item is one of the 50% for: which an anchorage configuration verification is required.)
6. Based on the aboveanchrage evaluations, is the anchorage free of potentially adverse seismic conditions?UD N/AD YQ NDE UD N/AD YD NEI UD :N/AD Yq ND UD N/ AD YIN NID U1 z Enter the.equipmeni cdass name from Appendix l: Classes 'f Equipmenet.

<C-3, >.: PAGE 217 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 2.of 2 Seismic, Walkdown Checklist (SWC),Equipment ID No.- oN$ \0 Equip. Class", E-quipmrent Description MiV6 YO Sw -, kdA. ,L_Interaction Effects 7. Are soft targets ,'firee from impact.by nearby equipmnent or strutIures?

8. Are overhead equipmenrI, disrtibution systems, ceiling tiles and lightihg, and masonry block walls.not likely to collapse ontot the equipnment?

Sc,- '- ...,, tanl7 YE NFJ UE3 N/AO YEI NEI UE3 N/A[]9. Do attached :lines have adequate .flexibility towavoid damage'? YQ9 NEI UE Ný/AEl t-.Es'*,, I a: o", to 7- f--zý , rs r-&4,,4t"'o:' ll, ,10. Based on-the above seismic inte'raction evaluations, is equipment free UY[ Nt U]of potentially adverse seismic interaction effects?, Othier Adverse Conditions i!. ilave you looked f6r mnd.fbund:

no other scismic Conditions that could YZ No UEL.adversely affect the sajety functions of the equipmalt7 vl"t;! \ A9 4 ,.,4 4 ,, 0 Comnsdik iona-s pager4sw *ab addv as e tesca Comments.

Additi~onal11 pages may be added as necessary 0 4 %L~ cItIAy ~ /,1/7b ti\w.i ¶'i C'21't.,-N U cwijk y4h C. AIL-o Evaluated by: J" 1/ 'os. if ..r.* , , Date- /A: ...tz C-4>PAGE 218 of 668 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSI P B f-T r JV4 PAGE 219 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 220 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 1 of 2 Status:9 N U Seismic Walkdown Checklist (SWC)EquipmenttID No.P./JO$

.53 4/A0 Equip. Class'2 /- , VA1r .4/'W4- .'vr EquipmeftntDescription

... ./ T'O: 'oL t. /A7O Location:

  • Bldg. -AA Floor El.. 1443. ý Room, Area ?C&/0o9 Manufacturer, Model, Etc.(optional butrecommended)

Y'J2&/7 -4f-k- , 9! A R (/, 1/itRo L Instructions for Completing Checklist This checklist may be used to document the rcsults of the Seismicr Walkdo'n of -itemn of equipment on the SWEL. The space below each of the following questions may be used to record the~results ofjudgments and findings.

Additional space is provided atthe end'of this checklist:

or documenting othercoirnments.

Adchorage J. Is the.anchorage configurationverification required (i.e., is, the item one.of the 50% of SWELitems requiring such verification)?

Yv NOlý2. Is the: anchorage flee of bent, broken, missing or lo1se hardware?3. ls the anchorage free of corrosion that is more than .mjld surfa.e oxidation?

4. Is the anchorage free of visible cracks in the conacrete neaf the anchors?5. Is the anchorage configuration consistent with plant docurncntati6n?(Note: This que.stion applies ison~e of the 50% for which an anchorage configuration verificationis required.)
6. Based on the aboveanchorage evaluations, is'the anchorage ftee Of potentially'adverse.

seismic, clonditicnq)s Y' NQ, Ull] N/A['UE1 N/At1 YA NE] UNC`.:Enter theojipment from Appendix B: Classes'ofEquipment.

C-3 >PAGE 221 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet 2 of 2 Seismic Walkdown Checklist (SWC)Equip ment ID No.. ^i] 6 '.% -At Equipm. Class" / W >AoR d9,Vrf-- Rwf ?Equipment Description

1. o( --A -`~o: ce7 /Y -4t Interaction Effects'7 .Are. so-h targets fr6 from imp!sact by nearby equipment or structures?

8., Are overhead qquipment, distribution systems" ceiling: tiles and lighting, and masonr block walls not likely to collapse onto the eqUipment?

9. Do attached lines haveadequaieflexibility-to avoid damage?10. Based on the .bove seismic. iiinteractionevaluations, iseqUipien ree of potentially adverse seismic interaction effectms.YA NE1 UE] N/AEJ YX NEI UQ: NIAEI YX NQ UEI N/AEN XNm Nn, U0/N uo Other Adverse Conditions
11. Have you looked-for and found no other seismic conditions that could Y4 NEI UFJ adverSel affect. tLe safety finictions of the equipment?.

Commrents (Additional pages~maybe~added Evaluated by ).4 'd? d,4,9 Date: /,Z-0ho i2,--i( C-42 >.PAGE 222 of 668

/*ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIONOO PAGE 223 of 668 9T ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION .0!PAGE 224 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 Sheet1 of 2 Status: Y U Seismic Walkdoown Checklist (SWC)Equipment.ID NOAJD.No-

\%0.15- m Equip. Class"I'L EquiptmentDescriptioh

.420 V 1 ABD Location:

Bldg. R Floor EIl' , Room, Area t .X I o0 Manufacturer, Model, Eic. (optional but:reconimended)

Instructions for Completing Checklist This checklist tiay be used to documentuthe results of the.Seismic Walkdown of an item ofequipment on the SWEL. The space below each of the following questions may be used torecord the resultsgofjudgments and findings.

Additional space is provided at the end of this checklistfor documenting other comments.Anchoraie (s $l $,bj dOAtr $1-c1I-zI. Is the anchorage configuratibn verification required (i.e., is the item one of tle 50% of SWEL items requiring.

such verification)?

YEI NEI'2. Is.the anchorage free ofbent., broken,:missing'or loose hadware?3. Is the anchorage free of corrosion that is mote than mild surface okidaition?

...4. Is the anchorage free of visible cracks in the.concrete near the anchors?5.. Is the anrchdrage configuratibn consistent withi plant documentation?(Note: This questidn only applies if the item is one of the 50% :for which an anchorage configuration .verification is required..)

6. Based on the above anchorage evailhations, is.the anchorage free&?f potentially adverse seismic. conditions?

YE NE1 UE- ýYEJ NEI iEI N/AEINE. UE NIAE YE No' UE N/A.E YE NEI UE.ýý'1ntirther eq'uiprne.nt clas bnae .from:Appe~iciiv:

Cla~scss of Equiipmenir.

<C-3>PAGE 225 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 She et 2of2 Seismic Walkdown Checklist (SWC)IEquipmeznt lD' No.71- go 5 -'$, Equip,:Class-2 I Equipment Description ,t i-OV I.A Ci. I AD', Interact6io Effects(Se tj ao/&7. Xre: soft targfets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems .ceil ing tiles and lighfing, and masonry.blo.ck walls not likely io:collapse ono theo quipment?9. ,D6 attached lines have adequate flexibility to avoid damage?10. Based on the .above seismic interaction evaluations, is equipment free of potentially ad verse seismic interaction effects?YE NIEI UEC NIAE]YE NEI UE N/AU YE]-NE] UE] NIAE]YE] NEI UF1 Other Adverse Conditions
11. Have you looked for and found no other seismic: cond itions that.could YE] liE]adversely affect .the safety .functions of the 9*C ? o4 Conmments (Additional pages may be added as necessary):

I N'JWr J. 30 4" do MVi rqtflel I 0r'w VV4OorIAn o'e': Evaluated by: J _._,, / c~~i-0 z~I. 4 ec.7 Dale: 1 7 L1/7//"/X1572 .-5 (MACOMý( C-4 >PAGE 226 of 668 9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIOONO PAGE 227 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 228 of 668 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIOI .0 ill 3AU PAGE 229 of 668 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSIO .0 PAGE 230 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 231 of 668 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCV061-RPT-01, VERSION 1.0 PAGE 232 of 668